1 |
Řídicí a signalizační jednotka pro sportovní utkání / Control and signalling unit for sport matchBohutínský, Jaroslav January 2010 (has links)
The aim of this study is a design of a control and signalling unit for sport meetings controlled by a microcontroller. The unit should display the time, the state of the match, eventually another data important for a course of the match. It should be fitted by an audible alarm of the end of the match. A touch control panel with a liquid crystal display serves as input of control data. The unit operates in a countdown mode, it is possible anytime to start or to stop the time by pressing the button. The equipment is mains-operated and backed up by an external battery. In the case of a power failure, it is switched over to the battery. A representation of the time, the state of the match and other data is done by LED displays. The unit allows a connection to PC.
|
2 |
Reservmatningsmöjligheter vid transformatorhaveri / Backup power supply in case of transformer breakdownJarl, Markus, Bengtsson, Fredrik January 2015 (has links)
Kungälv Energi äger och ansvarar idag över Kungälv Kommuns elnät. Med en ökande befolkningsmängd ställs allt högre krav på elnätet och framför allt leveranssäkerheten. Med kalla vintrar och stort energibehov ger detta upphov till en svårare situation gällande leveranssäkerhet. I nuläget har Kungälv Energi två mottagarstationer, en 130/10kV-station espektive 130/20kV-station. 30/10kV-stationen börjar närma sig en gräns där effektbehovet närmar sig den maximala istributionskapaciteten. Därför fastställs en plan för att kunna klara av effektbehovet vid averi på en av två 130/10kV-transformatorer i mottagarstationen M1. Resultatet av rapporten visar att tillräcklig kapacitet finns i närliggande fördelningsstationer för att klara av reservdrift under hög belastning utan att några övriga komponenter skadas. Rapporten behandlar främst effektflöden för att kontrollera att dessa ej överskrider transformatorernas, ledningarnas och kablarnas märkeffekt. I flertalet fall har även faktorer för nödbelastning räknats med vilket resulterar i att samtliga linjer hos Kungälv Energi klarar av den ökade belastningen. Upptäckta flaskhalsar i nätet har uppmärksammats och delgetts samt förslag till förändringar för att förhindra framtida problem. / Kungälv Energi owns and is responsible of Kungälv municipality's electricity grid. With an increasing population and increasing demands on the grid and especially security of supply. With cold winters and large energy gives rise to a more difficult situation regarding security of supply. Currently, Kungälv Energi two receiving stations, a 130 / 10kV station and 130 / 20kV station. 130 / 10kV station is approaching a point where power demand is approaching the maximum distribution capacity. Therefore sets out a plan to cope with the power demand at the failure of one of two 130 / 10kV transformers of the receiving station M1. The results of the report shows that sufficient capacity is available in nearby distribution stations to cope with the emergency operation under high loads without any other components damaged. The report deals primarily with power flows to check that they do not exceed transformers, lines and cables rated power. In the majority of cases have also factors for distress load been counted with, which gives the result that all lines of Kungälv Energi can handle the increased load. Detected bottlenecks in the network have been highlighted, communicated and proposed changes to Kungälv Energi to prevent future problems.
|
3 |
Řízení dodávky vody v rodinném domě / Control of water supply for a houseChvátal, Michal January 2021 (has links)
The diploma thesis deals with the design and implementation of the system that will control the water supply for the family house and its garden. The system aslo allows you to store a history that can be viewed via the web interface. The web interface also allows you to set system parameters and monitor the current status.
|
Page generated in 0.0663 seconds