• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 4
  • Tagged with
  • 4
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Beredningsarbete på Galtö med undersökning av miljöaspekter vid ombyggnad av distributionsnät / Preparatory work on Galtö with an investigation of the environmental conversion of distribution networks

Andersson, Andreas, Hägerström, Martin January 2016 (has links)
Detta examensarbete behandlar tillvägagångssätt vid ett beredningsarbete. Arbetet utförs hos TROLK El & Tele AB och är beställt av Ellevio AB. Området beredningsarbetet utförs i är Galtö i Tanums kommun. Området innefattar cirka 10 km kabelförläggning, 4 nätstationer, 5 satellitstationer och tre stycken lågspänningsområden där nätet ska byggas om. Ellevio har beställt arbetet då de vill vädersäkra och säkerställa en hög leveranskvalitet på elnätet. Beredningsarbetet som presenteras är ett förläggningsförslag som TROLK kan arbeta vidare med och söka aktuella tillstånd. Hänsyn har tagits till de krav som ställs för att aktuella tillstånd ska godkännas vid framtagning av detta förslag. Det befintliga friledningsnätet ska raseras när det nya nätet har kopplats in. Friledningsnätet är cirka 5,2 km långt och innefattar nio stolpmonterade transformatorer. Förslaget är baserat på Ellevios projektpärm men vissa ändringar har gjorts där det varit nödvändigt. Examensarbetet identifierar även de miljöaspekter som uppstår vid rasering av ett friledningsnät och undersöker alternativa lösningar för att minska miljöpåverkan vid rasering av elnät och omhändertagning av avfall. När TROLK utför projekt på beställning av Ellevio använder de Ellevios miljöplan. Miljöplanen har studerats och jämförts med andra aktörers miljöplaner för att hitta eventuella förbättringsåtgärder. Studien identifierade att de största miljöaspekterna är de farliga avfallen kreosotimpregnerade elstolpar och PCB-smittad olja. Det har inte identifieras några större förbättringsåtgärder vid avfallshanteringen. Fokus har då lagts på att undersöka alternativ som kan ersätta de farliga materialen vid nyinstallation. Det har hittats flera olika alternativ till kreosotstolpen som alla har olika miljöpåverkan och valet är därför inte självklart. PCB-smittad olja är idag inte tillåtet i elnätet men då det innebär en stor kostnad att byta ut har dispenser delats ut till dess att nätet byggs om. / This thesis deals with the practices of processing work. The work is being performed with TROLK El & Tele AB and is ordered by Ellevio AB. The area that the work is carried out at is Galtö in Tanum. The area includes about 10 km cable installation, 4 substations and 5 satellite substations and three low voltage areas where the grid are going to be rebuilt. Ellevio AB has invested in this project as they want to weather proof and ensure a high quality of the power delivery. The preparatory work that is presented as a proposal TROLK can continue to work with and apply for the relevant permits. These permits have been accounted for when this work has been prepared. The existing overhead line will be dismantled when the new grid has been connected. The overhead line is approximately 5.2 km long and includes nine pole mounted transformers. The work is based on the project documents that Ellevio has provided, though some changes have been made where necessary. The thesis also identifies the environmental aspects arising from the dismantling of an overhead power grid and investigates alternative solutions to reduce the environmental impact. When TROLK are working with projects commissioned by Ellevio they are using the environmental plan handed by Ellevio. The environmental plan have been studied and compared with other actors' environmental plans in order to identify potential improvements. The study identified that the greatest environmental aspects is the hazardous waste of creosote impregnated power poles and PCB-contaminated oil. No major improvements in the waste management has been. Focus has then been to examine options to replace the hazardous materials for new installations. It has been found several different options to the creosote power pole that all have different effects on the environment and there are therefore no obvious alternative. PCB-contaminated oil are currently not allowed in the grid but as it means a big expense to replace dispensations has been distributed to the owners of the power grid until it has been rebuilt.
2

Införande av digitaliserad beredning på Siemens Energy AB i Trollhättan / Introduction of digitalized production preparation at Siemens Energy AB in Trollhättan

Lindroth, Sebastian, Lund, Max January 2021 (has links)
Under början av året 2021 genomfördes ett examensarbete på Siemens Energy AB i Trollhättan. Syftet med arbetet var att komma med förslag på arbetssätt för digitaliserade beredningar i programmet PLM2020 och hur dessa kan införas i verksamheten. Syftet varockså att utveckla ett arbetssätt som effektiviserar och ökar graden av kvalitetssäkring gällande skapande samt ändrande av produktionsberedningar. Frågeställningarna som arbetet skulle besvara var: Hur ska Siemens Energy AB i Trollhättan införa arbetet med digitaliserade beredningar? • Hur ska arbetsmetoden för beredningsarbete utformas i PLM2020? • Hur ska operationsinstruktionerna utformas? • Vilka nya behov skapas hos Siemens Energy AB i Trollhättan till följd av det nya arbetssättet? • Hur kan det framtida arbetssättet standardiseras? • Kan detta arbetssätt verifieras med ett konkret exempel?  En nulägesbeskrivning gjordes för att kartlägga hur olika berörda processer ser ut i dagsläget.Delar som berördes av nulägesbeskrivningen var dagens beredningsprocess, dagens arbete i PLM2020, dagens arbete med operationsinstruktioner samt Siemens Energy AB i Finspångs arbete med beredningar i PLM2020. Detta gjordes med hjälp av intervjuer av anställda på Siemens Energy AB. Efter nulägesbeskrivningen arbetades en metod fram för beredningsarbete i PLM2020 som ska ersätta dagens beredningsprocess i affärssystemet. Metoden som arbetades fram främjar kvalitetssäkring i verksamhetens beredningsprocess i och med granskning och revisionshantering av beredningar. I samband med detta fastställdes hur operationsinstruktioner skulle utformas, vilka nya behov som uppstår för verksamheten och hur standardisering av metoden skulle utformas. Ett konkret exempel på hur metoden fungerar kunde inte genomföras fullt ut, då Siemens Energy hade en del systemproblem under examensarbetet.  Slutsatsen som kunde dras av arbetet var att syftet uppfylldes till största del. Viss osäkerhet finns i om det nya arbetssättet är effektiverare än dagens. Förutsättningar som krävs för att det nya arbetssättet ska bli effektivt är att berörd personal får rätt utbildning och information innan full implementering. / At the beginning of the year 2021, a case study was carried out at Siemens Energy AB in Trollhättan. The purpose of the study was to come up with proposals of working methods for digitalized preparations in the program PLM2020 and how these can be introduced in the business. The purpose was also to develop a working method that streamlines and increases the degree of quality assurance regarding creation and change of production preparations. The questions that the work would answer were: How will Siemens Energy AB in Trollhättan introduce the work with digitalized productionpreparations? • How should the working method for production preparation be designed? • How should the work instructions be designed? • What new needs are being created at Siemens Energy AB in Trollhättan as a result of the new way of working? • How can the future way of working be standardized? • Can this approach be verified with a concrete example? A description of the current situation was made to map what different affected processes look like at present. Processes affected by the mapping of the current situation were the current preparation process, the current work in PLM2020, the current process with work instructions and Siemens Energy AB in Finspång's work with preparations in PLM2020. This was done with interviews of employees at Siemens Energy AB. Following the description of the current situation, a method was developed for preparation work in PLM2020, which will replace the current preparation process performed in the business system. The method that was developed promotes quality assurance in the business preparation process through review and audit management of preparations. Meanwhile, it was determined how workinstructions would be designed, what new needs occur and how standardization of the method would be designed. A concrete example of how the method works could not be fully implemented, as Siemens Energy had some system problems during the case study. The conclusion that could be drawn from the work was that the purpose was mostly fulfilled. There is some uncertainty as to whether the new way of working is more efficient than today. Prerequisites required for the new way of working to be effective are that the personsconcerned receive the right training and information before complete implementation.
3

Beredning av distributionsnät Myren-Torseröd i Tanum / Preparation of distribution grid between Myren-Torseröd

Andersson, Christoffer, Andersson, Pontus January 2016 (has links)
Examensarbetet i den här rapporten kommer att handla om hur ett beredningsarbete mellan Myren-Torseröd i Tanums kommun går till väga. På uppdrag av Ellevio AB skall berednings och entreprenadföretaget Trolk EL & Tele AB vädersäkra ett område mellan Galtö-Torseröd i Tanums kommun. Denna rapport kommer dock bara innehålla distributionsnätet 0,4-24 kV i området Myren-Torseröd. Det befintliga luftledningsnätet skall raseras och ersättas med markkabel. Även befintliga nätstationer och stolpstationer skall skrotas och ersättas med nya. Under beredningsarbetet skall fältbesök göras för att få en överblick i området beredningen skall ske, även för att mäta ut placering av t.ex. nätstationer. Beredningsarbetaren skall skriva avtal med markägare för att ha tillgång till marken, sedan skall även tillstånd sökas från t.ex. Länsstyrelsen, trafikverket och kommunen. Hela beredningsarbetet i detta projekt omfattar 68 kunder. / This report will focused on how the preparatory work between Myren-Torseröd in Tanum will proceed. On behalf of Ellevio AB, the preparation and construction company Trolk EL & Tele AB shall weatherproof an area between Galtö-Torseröd in Tanum. This report will only include the distribution 0,4-24 kV in the area between Myren-Torseröd. The existing overhead line network will be dismantled and replaced with underground cables. Even existing substations and pole stations to be scrapped and replaced with new ones. During the preparatory work, there have been field visits to get an overview of the field of processing operations, and to measure the position of e.g. substations. To have access to the ground the preparation worker must sign contracts with landowners, and shall also seek authorization from the County Administrative Board, the transport department and municipality. The entire preparation work in this project includes 68 customers.
4

Anslutning av solcellspark till en mottagningsstation / Connection of solar park to a receiving station

Fayaz, Gholam January 2023 (has links)
Detta examensarbete behandlar hur ett beredningsarbete för anslutning av solcellspark utförs. Skara Energi AB ska utföra beredning för att ansluta en solcellspark till elnätet på uppdrag av en privat kund i Skara kommun. Enligt kundens önskemål ska två alternativ av solcellspark utredas: en mindre med 1,5 MW installerad effekt till mottagningsstationen södra (M2) och en större med 5 MW installerad effekt till mottagningsstationen norra (M1). Under examensarbetets gång har ett ental fältbesök utförts för att få en tydligare bild av förutsättningarna kring projektets område, samt för att kunna upptäcka problem och hinder som inte syns på kartorna. Med lämpliga val av väg för kabelförläggning kan hinder och problem undvikas i hög grad, dock kräver projektet styrd borrning på fyra platser där vägar korsas. Projektet omfattar 900 meter kabelförläggning vid den mindre solcellsparken och byggande av ett kopplingsskåp för att skarva kablarna. För den större solcellspark förläggs kablar på två platser, där den ena sträcker sig från M1 till en befintlig kopplingskiosk ca 2 km västerut. Den andra kabeln schaktas ca 1 km norrut från solcellsparken till en befintlig kabel. En preliminär P2-kalkyl har utförts som visar en kostnad för den mindre parken på cirka 2,95 miljoner kronor, och för den större parken på cirka 5,35 miljoner kronor, men priset kommer att ändras i framtiden på grund av inflationen. Kostnaden har beräknats med användning av EBR 2020. / This thesis deals with how preparation work for the connection of a solar park is carried out. Skara Energi AB is going to carry out preparations for connection of a solar park to the electrical grid on behalf of a private customer in Skara municipality. According to the customer's wishes, two options of solar parks should be investigated, a smaller one with 1.5 MW for the reception station south (M2) and a larger one with 5 MW for the receptionstation north (M1). During the course of the degree work, a number of field visits have been carried out to get a clearer picture of the conditions surrounding the project's area and to be able to discover problems and obstacles that cannot be seen on maps. By choosing a suitable route for cable laying, obstacles and problems can be avoided to a large extent. The project requires however controlled drilling at four locations where roads are crossed. The project includes 900 meters of cable laying for the smaller solar park and a junction box being built to splice the cables. For the larger solar park, the cable is laid at two locations, one stretches approximately 2 km from the M1 to an existing connection kiosk to the west. The second cable is laid from the solar park to an existing cable approximately 1 km to the north. A preliminary P2 calculation has been carried out which shows a cost for a smaller park of approximately 2.95 million SEK, and for a larger park of approximately 5.35 million SEK, but the cost will change in the future due to inflation. The cost was calculated by using EBR 2020.

Page generated in 0.1042 seconds