Stavebně technologický projekt laboratorně administrativního objektu / Construction Technology Project laboratory administrative buildingLabudová, Martina January 2017 (has links)
This thesis deals construction technology project of laboratory administration building at the University Hospital Ostrava. Attention will be focused on the construction of the main building. The author focusses on the main technological stages of construction, time and financial planning. Selected construction processes are elaborated in terms of the execution of works, quality control and occupational health and safety. The thesis is supplemented by attachments.
|
212 |
Stavebně technologický projekt rekonstrukce pavilonu "A" nemocnice Havlíčkův Brod / Construction and technological project of reconstruction of the Pavilion "A" the hospital Havlíčkův BrodKlofáč, Radek January 2012 (has links)
The main construction work is subject to technological reconstruction project Pavilion "A" hospital Havlickuv Brod. On this subject will be processed the necessary documents for construction preparation of the construction. For the reconstruction of this object will be processed: Time and financial plan of the building, building a detailed schedule SO01 (technological normals), the balance of the major sources for the construction, inspection and test plan for the reconstruction ceilings, technological prescription for reconstruction ceilings, reconstruction basement, thermal technical assessment of perimeter constructions
|
213 |
Úspory ve vytápění budov / The savings in heating buildingsRokůsek, Petr January 2012 (has links)
This thesis theoretically in Part A deals with the solution in savings heating building and heating hot water. It examines the impact of austerity measures on the overall need for and consumption of heat energy and its economic impact and compared with each other in order to achieve maximum efficiency. Part B is their subsequent application to a given object - a residental building, various design alternatives and the resulting energy savings improvements. Experimental Part C deals with indirect measurement of the thermal conductivity of building materials.
|
214 |
Stavebně technologický projekt minipivovaru Vysočina / Construction Technology project microbrewery HighlandsHoráková, Petra January 2015 (has links)
The aim of thediploma thesis is to make the detailed building-technological project of microbrewery Vysočina. It is concentrated on the principles of building organization what makes construction facility, the calculation of electric power and water supply, calculation of the costs of operating the construction site and its graphic representation for chosen construction phases. I also make the project of the optimal machine composition. After that I compile the budget and costing of the microbrewery, the time and financial plan and the evaluation of main sources. I technologically solve the phase of upper shell construction made of reinforced pre-cast construction for building object of the microbrewery Vysočina. I apply the other ways of assembly of upper shell construction and show their evaluation in terms of price and time construction. I make the inspection and test plan, environmental aspects, the source register of working risk, heat-engineering review of building case and fire safety solutions.
|
215 |
Komunitní centrum v Českých Budějovicích - stavebně technologický projekt / The community center in the Czech Budejovice - Construction Technology ProjectVondrák, Tomáš January 2015 (has links)
The theme of the diploma thesis is the construction technology project construction of a community center in the Czech Budejovice. The work describes the study of the main stages of technological, financial and construction schedule, itemized budget and technological prescription for performance building envelope. A substantial part of the work is to perform a technological prescription ceiling cladding structure above 1.NP, which is supplemented by technical-economic balance for the implementation of this ceiling construction, along with formwork drawings describes the optimal design of monolithic ceiling structure above 1.NP. Suitable design of the implementation process of the ceiling structure is achieved by reducing the cost of implementation of nearly 10% and shorten the length of the lease formwork system of almost 34% compared to the original assumption.
|
216 |
Multifunkční pavilon nemocnice v Českém Krumlově - stavebně technologický projekt / Multipurpose Hospital Building in Český Krumlov - Building Technology ProjectMikulášek, Jiří January 2020 (has links)
The diploma thesis is focused on the elaboration of a construction technology project for the construction of a new hospital pavilion in Český Krumlov. The thesis processes the preparation of construction and proposal of the organization of individual activities on the construction site in time sequence. The thesis contains technological regulations for the foundation of construction and realization of the monolithic frame on the 1st floor, which also includes drawings of the formwork of the ceiling slab and a scheme of formwork of columns and walls. Further contents are technological report, technological study of realization, transport relations, time and financial plans, complete construction site equipment for the whole construction phase, design of construction mechanisms and assessment of their suitability for use, resource balance, technological analysis, itemized budget, and occupational health protection for selected processes and noise studies dealing with the impact of building construction on the surrounding development.
|
217 |
Stavebně technologický projekt bytového domu Meandr v Brně / Constructive technological project of block of flats Meandr in BrnoSchauer, Martin January 2015 (has links)
This diploma thesis deals with the construction technological project of block of flats residence Meandr in Brno - Komín. On the given topic are processed and all necessary supporting documents that enhances the clarity and orientation in matters large building for the preparation of the construction process. Given the scale, complexity and location of the building is structurally location technology project addresses the only earthworks and construction site of the main building object SO-01 only. Furthermore, nine small objects that are closely tied this main object within the premises of a residential building. Between integral part of this work include the project site facilities including a time of economic evaluation studies of major technological stages realization, design of main machinery and mechanisms itemized budgets volume of important buildings and budgets by THU volume, less important objects, further technological specification for the implementation of monolithic concrete construction as this topic linked inspection and test plan, risk and crisis measures. For the entire building housing residence is prepared detailed timetable and a lot of additional documents.
|
218 |
Výzkum vlastností materiálů pro použití ve vysokoteplotním solárním tepelně-akumulačním zásobníku / Material properties research for use in high-temperature solar thermal storage tankŠot, František January 2018 (has links)
The use of thermal storage energy, using phase change materials appears to be an effective way to store thermal energy storage with the benefits of the high amount of energy while maintaining isothermal nature of the process. PCM methods are used in latent thermal storage systems for heat pumps, as well as in solar engineering or for temperature control in spacecraft. The past decade has extended these principles for cooling and heating in the building. There are a number of PCM systems, which operate over a wide temperature range, are used in various applications. This document includes a brief overview of the development and analysis of available thermal storage working mainly on the principle of PCM.
|
219 |
Příprava realizace polyfunkčního domu v Pardubicích / Realization of a polyfunctional building PardubiceVýborný, Václav January 2016 (has links)
The main contens of the thesis is solving a construction-technological project substructure and the upper shell construction of a polyfunctional building in Pardubice. Excavation and foundation work are done in section A and B1 and B2. Drilled piles are foundation of a polyfunctional building. Drilled piles are support of reinforced concrete grillage, which are from strips foundation and foundation pads. Cast-in-place concrete frame is a form of load-bearing structure, which contens plate ceilings, pillars and walls. Peripheral masonry is from hellow clay blocks, which are between cast-in-place concrete frame. Diploma thesis includes technical report, plan of building side, schedule and the budget of the building, technological instructions, radon prevent, control and testing plan, safety, balance resources, selected constructional details, machinery composition, bill of quantities.
|