• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 249
  • 98
  • 37
  • 12
  • 11
  • 10
  • 7
  • 5
  • 5
  • 3
  • 2
  • 2
  • 1
  • 1
  • Tagged with
  • 459
  • 156
  • 148
  • 146
  • 130
  • 119
  • 116
  • 113
  • 100
  • 98
  • 92
  • 84
  • 83
  • 75
  • 72
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
421

Sportovní centrum Polička / Sports centre Polička

Svoboda, Jan January 2016 (has links)
This thesis deals with the design and elaboration process of a project documentation of a sports centre. The designed sports centre building is situated in the southern part of the town of Polička, in the area determined for sports and free time activities complexes and areas. It is a two-floor, non-cellar, flat-roof building. It is based on plain concrete strip foundations and reinforced concrete foundation footing. The bearing, peripheral and partition walls are designed from POROTHERM hollow clay blocks. Reinforced concrete columns are designated in open disposition areas. The ceiling construction is made from SPIROLL pre-stressed concrete floor slabs and point-supported reinforced concrete slabs. The peripheral walls of the first aboveground floor are insulated with external thermal insulation system with a protective gabion facade. The peripheral wall thermal insulation in a bowling restaurant and gym halls extension is designed from a ventilated facade with CEMBRIT METRO facade cladding panels. The building is functionally divided into two main parts with a shared entrance. The sports centre with gyms and other sports facilities form the first part. Three squash courts, a mini-football piste, a special room for spinning and alpinning, a room for group exercising and cloakrooms with sanitary facilities are designed within one part of the sports centre. A restaurant with a bowling area and a kitchen with storerooms and other facilities for employees form the second part. The designed complex is barrier-free. There is aimed to be a car park for fifty cars, four motorbikes and a bus in front of the building. Three parking places are for disabled people.
422

Tunel Blanka: Inženýrskogeologické problémy a rizika ražby / The Blanka tunnel, geological hazadrs and problems during boring

Sedláček, Václav January 2016 (has links)
The Blanka tunnel has two boring sections: Brusnice tunnel and Královská obora tunnel. Both tunnels were boring in difficult geologycal conditions, but the geology conditions of these tunnels are not same. Also they had not the same hazards during boring. There was used a spectrum of different technical works with hazard reduction purpose and safety process of boring. There were three serious accidents, wnich everyone made a creater on the surface, but they have not the same causes. This text has a task to describe a geological survey before and during the boring of both tunnels. How other reasons affected the process of boring? How the tunnels were bored? What events preceded the everyone of three major failure? This text does not deal with economical things of boring and effects of specific personal influence on the process of boring. Key words Tunnel, excavation, Blanka, Brusnice, Letná, Stromovka park, Vltava river, underground water, geology, ordovik, New Austrian Tunnelling method, pilot tunnel, calotte, bench, bottom, arche, bolt, lining, grouting, collapse of ceiling, failure, tube, shale, quarzite, soil, loess, ballast, clay
423

Kongresové centrum Humpolec / Congress centre Humpolec

Šrůta, Otto January 2018 (has links)
This thesis describes the design and processing of the convention center. The proposed house is located at the top of the square of Humpolec in the area designated for the construction of public facilities. The building consists of a basement, where there is a garage for the car owner and stores food for the kitchen. On the first floor there is a reception, restaurant and facilities for the kitchen. On the second floor are conference halls. In the third and fourth floor is accommodation for guests. The restaurant is designed for 55 people inside + outdoor terrace can seat about 30 people. Conference halls are designed for 90 people. Accommodation is for 28 guests. Outdoor parking is for 40 cars. Perimeter bearing walls are made of reinforced concrete + insulation. Interior bearing walls are made of reinforced concrete, interior non-bearing brick walls HELUZ. The ceilings are made of overstretched Spiroll panels and boards reinforced cross. For ceiling is plasterboard ceilings. The roof home is designed as a single-layer flat. Heating is effected by the heat pump. Wooden windows are six-chamber, aluminum doors. There is a staircase and an elevator. The proposed facility is designed wheelchair.
424

Sportovní centrum Hodonín / Sports centre Hodonín

Svatek, Michal January 2018 (has links)
The content of this thesis is elaboration of technical documentation for realization of a sports centre. The building is situated in Hodonín in flattened terrain. It is a building with two floors, non-cellar, flat vegetation roof and sloping roof of the wooden glued laminated trusses. The building is based on plain concrete strip foundations and concrete foundations footing. Both peripheral and internal walls are made of ceramic blocks Porotherm. In open spaces, reinforced concrete columns are designed. The ceiling structure is designed from pre-stressed Spiroll ceiling panels. The peripheral walls are insulated with the ETICS external thermal insulation system in the western part of the building. On the rest of the building there is a ventilated facade with a cladding made of wood and Cetris tiles. The building is functionally divided into two parts with a common entrance. On the north and south side there are sports grounds. The rest consists of a restaurant, a kitchen with facilities, a hygienic background for employees and visitors. The whole building is barrier-free.
425

Příprava realizace montované haly s administrativou v Praci / Preparation of a prefabricated hall with administration

Schrámek, Martin January 2019 (has links)
The subject of the diploma thesis is a preparation of a prefabricated hall with administration in Prace. The production hall will be used to produce glass fiber reinforced concrete. Next part and extension is an administrative part. The text part of the thesis contains a technical report on the building technological project, time and financial plan of the building - object, coordinating situation of the building with broader relations of the transport routes, study of the realization of the main technological stages of the building object, item budget of the main building object, time schedule of the main building, sets of the main technological stages, detection protocols for individual months, limits, balance of resources and personnel, plan of selected material sources, technical report of construction site equipment, technological regulation of precast reinforced concrete frame, technological regulation of precast concrete frame coverings Kingspan panels, Control and test plan of precast concrete frame, covering of precast concrete frame panels Kingspan and ceiling panels of the Spiroll administration, alternative suggestion of the exchange ceiling construction administration and comparison, noise study and thermal technology.
426

Stavebně technologický projekt výjezdové základny zdravotnické záchranné služby v Zábřehu na Moravě / CONSTRUCTION AND TECHNOLOGICAL PROJECT OF THE BASE OF THE EMERGENCY MEDICAL SERVICE IN ZABREH NA MORAVE

Tůma, František January 2019 (has links)
This diploma thesis deals with the construction project of the outbound base of the emergency medical service in Zabreh na Morave. More specifically, this thesis deals with the study of the development of the building, the technological regulation for the flat roof, and the subsequent chapters - design and assessment of the lifting mechanism, optimal design of the building site, timetable, itemized budget, control and test plan, etc. An interesting point is the simulation of the construction, where a 3D model and a video are created. The thesis is based on a borrowed documentation of the project.
427

Stavebně technologický projekt výstavby komplexu RD SLAVKOV - Pod Zlatou horou / Construction Project for Implementation of Houses in Slavkov - Pod Zlatou horou

Kurková, Dita January 2020 (has links)
The subject of the diploma thesis is the solution of chosen parts of the construction technology project of the 1st phase of the construction „Komplex RD Slavkov, Pod Zlatou horou“. These are 4 semi-detached houses, overall 8 family houses. The work deals with technological regulations for the superstructure including roof, study of the realization of the construction technology project, design of the main construction machines and mechanisms and control and test plan. For the whole construction is elaborated time and financial plan in two variants, namely the gradual and current method of construction, and a detailed schedule for one semi-detached house. The technical report of the building site equipment is completed with the drawings, itemized budget of the building part of the house, noise study and specialization focused on the photovoltaic system, with an alternative solution to use solar collectors. The thesis also includes a case study of construction methods focused on the gradual and current method of construction.
428

Příprava realizace dostavby klinické hematologie FN Brno / Preparation of realization of completion of clinical hematology, University Hospital Brno

Průcha, Aleš January 2020 (has links)
The aim of this diploma thesis is a solution of the extension of clinical hematology of the Faculty Hospital Brno. The thesis deals with the technological regulation for steel construction, coupled ceiling concrete slab with other topics including an inspection-check plan, a time schedule for carcass, time and financial schedule for structures and an item budget. In addition, this work includes the coordination site-layout of the construction with wider transport relations, mechanical assembly, the principles of the organization of site equipment and occupational safety and health risks. Finally this thesis contains several assessments for cranes, scheme of principles of fixing steel columns into structure, scheme of laying building envelope, LEED, site equipment financial assessment.
429

Občanská stavba / Civil building

Bartošová, Andrea January 2020 (has links)
Basic of this Diploma thesis is Civil construction in Kostelec nad Orlici, which is in a part of city, where is planning off-grid community housing. Part of off-grid community housing is considered a partially sistainable civil construction, serving both for cultural use through the club, for commercial purposes such as various salons (hairdresser, massage or shop), as well as for sports activities with the possibility of small refreshments, such as bouldering, climbing wall and exercise hall. Four sustainable (off-grid) familly houses, which aren´t the subject of this thesis, are considered. Object SO01 – Civil construction is designed as a partially basement, two floors. The shape of the object is designed as several blocks with different height levels. From a material point of view it is a wooden building from the system of large-format laminated wood panels (CLT). The basement is designed with a waterproof reinforced concrete so-called white tub and prefabricated ceiling panels SPIROLL. A facade is made of wooden cladding, cement-fiber boards or thin-layer silicone plaster. A roof of the object is partially flat (vegetation and walkable) and a shed roof with a slope of 5°. A dance hall and the rest of the club + exit is located in the basement. A sanitary facilities, a technical room and a main entry with reception is also located in the basement. Right in the middle of the building is a climbing wall that runs across all floors. To the right of the climbing wall is a shop, exercise hall and staircase. To the left side are a sanitary facilities, a boulder (low climbing wall) and separate staircase for a office space on the 2nd floor. Behind the climbing wall is a bistro with entry for a terrace and entry for the club. There are some establishments like a hairdresser, a cosmetic salon, a tattoo salon and a massage salon on the 2nd floor. There are an entrance to a terrace above the bistro and a staircase to an attic and to second terrace as well on the 2nd floo
430

Polyfunkční dům / Mixed-use building

Hort, Martin January 2020 (has links)
Diploma thesis describes the design and processing of project documentation of the multifunctional building. The multifunctional building is located in the central part of the town Náměšť nad Oslavou. The building has 4 floors. It is partly cellared building with flat roof and walkable terraces. This building is consisted of 2 functional parts, the first part is designed for living and the second one is designed for contact with the customer. There are shops and offices. The first floor is wheelchair accessible. In the basement there is a technical background of the building and cellars for housing units. In this multifunctional building we can find 13 residential units and five offices. All of the floors are connected with staircase and lift. The Carpark and the private garden with playground are also part of this residential area. This building is based on concrete blocks. Load-bearing, peripheral walls and connecting walls are made of ceramic blocks. A monolitic ceiling construction is the combination of the iron and the concrete. Two types of insulation are used in peripheral walls. The first one is called ETICS, external thermal insulation composite system, made of polystyrene. The second type of insulation is facade cladding system where the main insulation layer is made of mineral wool. The insulation layer is replaced by XPS polystyrene where facade is in contact with the ground. Facade cladding panels are made of cement and wood fibers called Cembrit.

Page generated in 0.0575 seconds