Optimization of construction time and cost using the ant colony system techniquesZhang, Yanshuai. January 2007 (has links)
Thesis (M. Phil.)--University of Hong Kong, 2007. / Title proper from title frame. Also available in printed format.
|
22 |
A behavioral analysis of learning processes amongst construction project team members in ChinaWu, Jian, January 2008 (has links)
Thesis (Ph. D.)--University of Hong Kong, 2009. / Includes bibliographical references (leaves 164-174). Also available in print.
|
23 |
An investigation into the interaction between potential building clients and construction professionalsGameson,R N 20 April 2020 (has links)
This research investigates the interaction process between building clients and construction professionals. The context of the interaction is the first meeting between the parties to discuss a potential construction project. The objective of the research was to determine whether clients, with differing levels of construction experience, and construction professionals, from different disciplines (architects, quantity surveyors, consulting engineers and contractors), exhibit distinctive interaction characteristics, both in terms of how they interact and the subject matter of their interactions.
In order to test a number of hypotheses about the interactions an experimental procedure was developed. This involved arranging a series of interviews between the different client types and the construction professionals. 44 interviews were conducted with each one being recorded and then transcribed. Additional data was collected in the form of participant questionnaires and personality tests. Transcripts were coded using systems developed for this investigation, using measures of nature of interaction and subject matter. Processing and analysis of the data was conducted using ethnographic computer software and programs written specifically for this research project. A database was created from the interview data which allows selective retrieval of segments of interviews. The database comprises of approximately 215,000 words, with 58,000 codes assigned to text segments. The results of the analysis are presented in both quantitative and qualitative forms, and show that there are significant differences in the interactions. In interviews between inexperienced clients and professionals the professionals make the greater contributions, dominating the clients. There is a reversal of the roles when experienced clients interact with professionals, with the clients assuming the dominant position. In addition the results show that in interviews between inexperienced clients and professionals, the four professional disciplines emphasis different factors. All professionals raise issues relating to primary factors such as time, cost and quality. However, the discussion of other building factors was more specific to a particular professional discipline. Finally, the research also concluded that the element of personality differences in interviews was an influential factor in determining whether their outcome was perceived as successful by the participants.
|
24 |
An investigation into the interaction between potential building clients and construction professionalsGameson, R N 20 April 2020 (has links)
This research investigates the interaction process between building clients and construction professionals. The context of the interaction is the first meeting between the parties to discuss a potential construction project. The objective of the research was to determine whether clients, with differing levels of construction experience, and construction professionals, from different disciplines (architects, quantity surveyors, consulting engineers and contractors), exhibit distinctive interaction characteristics, both in terms of how they interact and the subject matter of their interactions.
In order to test a number of hypotheses about the interactions an experimental procedure was developed. This involved arranging a series of interviews between the different client types and the construction professionals. 44 interviews were conducted with each one being recorded and then transcribed. Additional data was collected in the form of participant questionnaires and personality tests. Transcripts were coded using systems developed for this investigation, using measures of nature of interaction and subject matter. Processing and analysis of the data was conducted using ethnographic computer software and programs written specifically for this research project. A database was created from the interview data which allows selective retrieval of segments of interviews. The database comprises of approximately 215,000 words, with 58,000 codes assigned to text segments. The results of the analysis are presented in both quantitative and qualitative forms, and show that there are significant differences in the interactions. In interviews between inexperienced clients and professionals the professionals make the greater contributions, dominating the clients. There is a reversal of the roles when experienced clients interact with professionals, with the clients assuming the dominant position. In addition the results show that in interviews between inexperienced clients and professionals, the four professional disciplines emphasis different factors. All professionals raise issues relating to primary factors such as time, cost and quality. However, the discussion of other building factors was more specific to a particular professional discipline. Finally, the research also concluded that the element of personality differences in interviews was an influential factor in determining whether their outcome was perceived as successful by the participants.
|
25 |
Construction Project Benchmarking in the U.S. Army Corps of EngineersLaBarre, Philip Samuel 11 May 2013 (has links)
The construction industry is unique with many challenges. Managing claims can be one of the greatest challenges. Construction projects are becoming more influenced by factors that lead to claims. The literature review highlighted a few of these factors which include: safety issues, design errors, delay, and changes. Moreover, the literature review presented studies in performance measurement and benchmarking as a way to mitigate these factors. The research presented the results from a benchmarking study used to improve contractors that performed work for the Army Corps of Engineers, Vicksburg District. The study selected and analyzed 40 random construction contractors. Five performance elements were identified to measure each contractor. A five-point scale evaluated each contractor based on these elements. The results of this research indicated that benchmarking is an effective tool for improving performance and mitigating the cause of claims.
|
26 |
Causes of rework on building construction projects in NigeriaAiyetan, A.O. January 2013 (has links)
Published Article / Construction projects all over the world involve many challenges, particularly for large public projects. The emerging complex nature of construction activities has brought with it characteristic features, such as, cost increases, delay in the delivery of project, to which rework (carrying out an activity more than one time) has a high contributing factor, stemming from imperfection. This study identified the sources of rework on construction projects in Nigeria from three perspectives: the client, contractor, and consultant. The study was concentrated on the South West part of Nigeria. The quantitative research method was adopted. Random sampling technique was employed in the selection of sample size. A total of one hundred and twenty (120) questionnaires were analysed using inferential statistics.
The following are the findings of this study: the contributions of the client leading to rework are in the form of poor communication, inadequate construction planning and poor management practices. From the consultant, they are: lack of understanding and correct interpretation of customer requirements, constraints in carrying out activities and inexperience of personnel and on the part of the contractor they are: wrongly laying of forming course, poor quality concrete, and poor plastering. Based on the conclusions reached, the following recommendations were drawn. They are: the development of a standard information gathering format relative to clients 'by designers and clients' writing down their intentions before visiting designers; formal technical training should be given to foremen on permanent appointments with organisations, attention should be given for adequate supervision, and construction methods should be analysed before selection and their use.
|
27 |
Ανάπτυξη συστήματος στήριξης αποφάσεων για τη διαχείριση κινδύνων στα τεχνικά έργαΓεωργαντοπούλου, Ανδριάνα 26 July 2013 (has links)
Σκοπός της διατριβής αυτής ήταν η ανάπτυξη ενός συστήματος για τη διαχείριση των κινδύνων στα τεχνικά έργα. Ο σχεδιασμός του προτεινόμενου συστήματος στοχεύει στο να αποκαλύψει στο χρήστη την πιθανότητα εμφάνισης συγκεκριμένων κινδύνων στο έργο και την επίπτωση αυτών στους στόχους του έργου (κόστος, χρόνος, ποιότητα, σκοπός) καθώς και να προτείνει αντίσοιχες δράσεις πρόληψης, για την μείωση είτε της πιθανότητας της εμφάνισης τους είτε για τη μείωση των συνεπειών τους στους στόχους του έργου. / A decision support system was developed in order to examine the probability of occurrence of certain risks in a construction project. Risk responses were developed so as to minimize either the probability or the impact of its identified risk
|
28 |
A behavioral analysis of learning processes amongst construction project team members in ChinaWu, Jian, 武健 January 2008 (has links)
published_or_final_version / Real Estate and Construction / Doctoral / Doctor of Philosophy
|
29 |
Managing large energy and mineral resources (EMR) projects in challenging environmentsChanmeka, Arpamart 01 June 2010 (has links)
The viability of energy mineral resources (EMR) construction projects is
contingent upon the state of the world economic climate. Oil sands projects in
Alberta, Canada exemplify large EMR projects that are highly sensitive to
fluctuations in the world market. Alberta EMR projects are constrained by high
fixed production costs and are also widely recognized as one of the most
challenging construction projects to successfully deliver due to impacts from
extreme weather conditions, remote locations and issues with labor availability
amongst others. As indicated in many studies, these hardships strain the industry’s
ability to execute work efficiently, resulting in declining productivity and mounting
cost and schedule overruns. Therefore, to enhance the competitiveness of Alberta
EMR projects, project teams are targeting effective management strategies to
enhance project performance and productivity by countering the uniquely
challenging environment in Alberta. The main purpose of this research is to develop industry wide benchmarking
tailored to the specific constraints and challenges of Alberta. Results support
quantitative assessments and identify the root causes of project performance and
ineffective field productivity problems in the heavy industry sector capital projects.
Customized metrics produced from the data collected through a web-based survey
instrument were used to quantitatively assess project performance in the following
dimensions: cost, schedule, change, rework, safety, engineering and construction
productivity and construction practices. The system enables the industry to measure
project performance more accurately, get meaningful comparisons, while
establishing credible norms specific to Alberta projects.
Data analysis to identify the root cause of performance problems was
conducted. The analysis of Alberta projects substantiated lessons of previous studies
to create an improved awareness of the abilities of Alberta-based companies to
manage their unique projects. This investigation also compared Alberta- based
projects with U.S. projects to point out the differences in project process and
management strategies under different environments. The relative impact of factors
affecting construction productivity were identified and validated by the input from
industry experts. The findings help improve the work processes used by companies
developing projects in Alberta. / text
|
30 |
Improving materials management on construction projectsKasim, Narimah B. January 2008 (has links)
An essential factor adversely affecting the performance of construction projects is the improper handling of materials during site activities. Materials management is made problematic by materials shortages, delays in supply, price fluctuations, damage and wastage, and lack of storages pace. In addition, paper-based reports are mostly used to record and exchange information related to the materials component within a supply chain which is problematic, error-prone, and inefficient. Generally, modem technologies are not being adequately used to overcome human error and are not well integrated with project management systems to make the tracking and management of materials easier and faster. Thus, this research focuses on the development of a mechanism to improve materials management on construction projects through the integration of materials tracking and resource modelling systems. A multi-facetted research approach was adopted. Initially, a literature review on materials management process in the construction project was conducted. This was followed by case studies involving six construction projects in order to investigate current practice in materials management to establish key problem areas and elements of good practice. The case studies also explored the requirements for integrating materials management and resource modelling in project management systems. The case study findings underpinned by literature results were used to develop a real-time framework for integrating RFID-based materials tracking and resource modelling. The framework was encapsulated in a computer-based prototype system based on Microsoft Visual Basic. NET. The prototype system was developed by amalgamation of all the software and hardware chosen such as MS Access (database system), MS Project (resource modelling) and RFID (automated materials tracking) to provide the mechanisms for integrating materials management and resource modelling in the construction industry. Evaluation of the prototype system was carried out by a series of interviews with industry practitioners to assess its appropriateness and functionality. It also established the skills and other requirements for the effective use of the real-time materials tracking system. The evaluation established that the prototype system demonstrated many benefits and is suitable for use in materials tracking and inventory management processes. It is concluded that the prototype system developed can improve materials management on construction projects, particularly with regard to materials tracking and integrating materials utilisation with the resource modelling subsystem in project management applications. Adoption of the approaches suggested in the thesis will enable the construction industry to improve the real-time management of materials on sites, and hence improve project performance.
|