Life Cycle Impacts of Road Infrastructure : Assessment of energy use and greenhouse gas emissionsMiliutenko, Sofiia January 2012 (has links)
Road infrastructure is essential in the development of human society, but has both negative and positive impacts. Large amounts of money and natural resources are spent each year on its construction, operation and maintenance. Obviously, there is potentially significantenvironmental impact associated with these activities. Thus the need for integration of life cycle environmental impacts of road infrastructure into transport planning is currently being widely recognised on international and national level. However certain issues, such as energy use and greenhouse gas (GHG) emissions from the construction, maintenance and operation of road infrastructure, are rarely considered during the current transport planning process in Sweden and most other countries.This thesis examined energy use and GHG emissions for the whole life cycle (construction, operation, maintenance and end-of-life) of road infrastructure, with the aim of improving transport planning on both strategic and project level. Life Cycle Assessment (LCA) was applied to two selected case studies: LCA of a road tunnel and LCA of three methods for asphalt recycling and reuse: hot in-plant, hot in-place and reuse as unbound material. The impact categories selected for analysis were Cumulative Energy Demand (CED) and Global Warming Potential (GWP). Other methods used in the research included interviews and a literature review.The results of the first case study indicated that the operational phase of the tunnel contributed the highest share of CED and GWP throughout the tunnel’s life cycle. Construction of concrete tunnels had much higher CED and GWP per lane-metre than construction of rocktunnels. The results of the second case study showed that hot in-place recycling of asphalt gave slightly more net savings of GWP and CED than hot in-plant recycling. Asphalt reuse was less environmentally beneficial than either of these alternatives, resulting in no net savings of GWP and minor net savings of CED. Main sources of data uncertainty identified in the two case-studies included prediction of future electricity mix and inventory data for asphalt concrete.This thesis contributes to methodological development which will be useful to future infrastructure LCAs in terms of inventory data collection. It presents estimated amounts of energy use and GHG emissions associated with road infrastructure, on the example of roadtunnel and asphalt recycling. Operation of road infrastructure and production of construction materials are identified as the main priorities for decreasing GHG emissions and energy use during the life cycle of road infrastructure. It was concluded that the potential exists for significant decreases in GHG emissions and energy use associated with the road transport system if the entire life cycle of road infrastructure is taken into consideration from the very start of the policy-making process. / QC 20120229
|
2 |
Análise ambiental, energética e econômica de arranjo processual para reúso de água em refinaria de petróleo. / Environmental, energetic and economic analysis of a process design for water reuse in petroleum refinery.Gripp, Victor Sette 18 December 2013 (has links)
Foi construído um modelo representativo do ciclo de vida da água em uma refinaria de petróleo, contemplando todos os usos a que esta se presta. Nesse contexto foram avaliados do ponto de vista ambiental, energético e econômico cenários em que etapas adicionais eram incorporadas ao tratamento de efluentes de forma a viabilizar o reúso de água e o fechamento do circuito na própria refinaria, reduzindo assim a necessidade de captação e, consequentemente, de tratamento da água bruta captada pela refinaria. O Cenário I corresponde ao cenário-base, sem implantação de nenhuma ação voltada ao reúso. No Cenário II, é incorporada a etapa adicional chamada Tratamento Fase 1, constituída por um processo de Clarificação seguido de uma Eletrodiálise Reversa (EDR) que permite o reúso de 255,7 m3/h dos 350 m3/h lançados inicialmente ao corpo hídrico no Cenário I. No Cenário III, é incorporada ao arranjo do Cenário II uma etapa de Cristalização Evaporativa para tratar o concentrado salino da EDR, recuperando, assim, mais 55,4 m3/h dos 350 m3/h lançados inicialmente, utilizando, para isso, vapor residual inicialmente não aproveitado pela refinaria. A análise ambiental foi desenvolvida por Avaliação do Ciclo de Vida (ACV) e constatou um desempenho muito semelhante dos três cenários. Apesar disso, a análise em perfil aberto, de impactos de midpoint, evidenciou ganhos ambientais significativos associados ao fechamento de circuito de água e, embora com vantagens muito discretas, o Cenário III apresentou um desempenho superior ao do Cenário II em todas as categorias e, na grande maioria delas, também superior ao desempenho do Cenário I. A análise de indicador único, em endpoint, destacou o impacto em Mudança Climática, relativo principalmente à queima de gás natural na caldeira para a geração de vapor, como o principal impacto ambiental associado ao ciclo de vida da água na refinaria, responsável por mais de 90% do valor correspondente ao resultado do indicador único. A análise energética foi desenvolvida utilizando-se o indicador de Demanda Cumulativa de Energia (CED) e resultou em um desempenho superior do Cenário I, ainda que com pequenas diferenças em relação aos Cenários II e III. O pior desempenho foi o do Cenário II. Comparando-se a contribuição relativa dos diferentes tipos de energia, destaca-se a energia de origem hidrelétrica, responsável por cerca de 80% do indicador único de CED em todos os três cenários. A análise econômica foi realizada por meio de indicadores tradicionalmente utilizados para a análise de viabilidade de projetos Taxa Interna de Retorno (TIR) e Valor Presente Líquido (VPL) , considerando, como referência, as regras de cobrança pelo uso da água vigentes na bacia do rio Paraíba do Sul. Com os preços cobrados atualmente pelo uso da água desta bacia, a implantação de ambos os cenários de reúso (II e III) não se viabiliza economicamente. Para que isso ocorra, o valor cobrado pelo uso da água teria que ser da ordem de 50 a 80 vezes maior do que o que é cobrado atualmente. Dentre os cenários de reúso, o Cenário II apresentou desempenho econômico superior ao do Cenário III. / It was built a representative model of the water life cycle within a petroleum refinery, considering all the uses in which it is applied. In this context, under environmental, energetic and economic perspective, different scenarios were analyzed, where further treatment stages were added to the wastewater treatment process so that recycled water could be provided back to the refining process, reducing, therefore, the need for freshwater intake and pretreatment by the refinery. Scenario I is the base scenario, without implementation of any water reuse aimed action. In Scenario II, it is incorporated the additional stage called Phase 1 Treatment, which consists of a Clarification process followed by an Electrodialysis Reversal (EDR).This enables the recycling of 255.7 m3/h from the 350 m3/h previously discharged to the water body in Scenario I. In Scenario III, it is incorporated to the Scenario II setting an Evaporative Crystallization process for treating the concentrated brine resulting from the EDR process. This enables the recovery of more 55.4 m3/h from the 350 m3/h initially released, using, for that, the energy from residual steam previously not used by the refinery. The environmental analysis was developed through Life Cycle Assessment (LCA) and found very similar performances for all three scenarios. Despite that, the open profile analysis, of midpoint impacts, showed significant environmental gains from the closure of the water circuit and, though with very small advantages, Scenario III showed a better performance than Scenario II in all impact categories and, in most of them, also better than Scenario I performance. The single score analysis, considering endpoint impact categories, highlighted Climate Change, specially related to the natural gas burning in the boiler for steam generation, as the main impact category associated to the water life cycle within the refinery, being responsible for more than 90% of all the value of the single score indicator. The energetic analysis was developed using the Cumulative Energy Demand (CED) indicator and resulted in a better performance of Scenario I, even if with just small differences from Scenarios II and III. The worst performance was from Scenario II. Comparing the relative contribution of the different types of energy, the hydroelectricity was the most important one, being responsible for around 80% of the CED single score in all three scenarios. The economic analysis was developed through traditional indicators used for assessing projects viability Internal Return Rate (IRR) and Net Present Value (NPV), considering, as reference, the rules of charging for water use valid nowadays at the Paraíba do Sul river basin. With the prices charged nowadays for the water use from this basin, the implementation of both reuse scenarios is not economic viable. In order to make it viable, the charged value would have to be around 50 to 80 times higher than it is today. Among the reuse scenarios, Scenario II had a better economic performance than Scenario III.
|
3 |
Análise ambiental, energética e econômica de arranjo processual para reúso de água em refinaria de petróleo. / Environmental, energetic and economic analysis of a process design for water reuse in petroleum refinery.Victor Sette Gripp 18 December 2013 (has links)
Foi construído um modelo representativo do ciclo de vida da água em uma refinaria de petróleo, contemplando todos os usos a que esta se presta. Nesse contexto foram avaliados do ponto de vista ambiental, energético e econômico cenários em que etapas adicionais eram incorporadas ao tratamento de efluentes de forma a viabilizar o reúso de água e o fechamento do circuito na própria refinaria, reduzindo assim a necessidade de captação e, consequentemente, de tratamento da água bruta captada pela refinaria. O Cenário I corresponde ao cenário-base, sem implantação de nenhuma ação voltada ao reúso. No Cenário II, é incorporada a etapa adicional chamada Tratamento Fase 1, constituída por um processo de Clarificação seguido de uma Eletrodiálise Reversa (EDR) que permite o reúso de 255,7 m3/h dos 350 m3/h lançados inicialmente ao corpo hídrico no Cenário I. No Cenário III, é incorporada ao arranjo do Cenário II uma etapa de Cristalização Evaporativa para tratar o concentrado salino da EDR, recuperando, assim, mais 55,4 m3/h dos 350 m3/h lançados inicialmente, utilizando, para isso, vapor residual inicialmente não aproveitado pela refinaria. A análise ambiental foi desenvolvida por Avaliação do Ciclo de Vida (ACV) e constatou um desempenho muito semelhante dos três cenários. Apesar disso, a análise em perfil aberto, de impactos de midpoint, evidenciou ganhos ambientais significativos associados ao fechamento de circuito de água e, embora com vantagens muito discretas, o Cenário III apresentou um desempenho superior ao do Cenário II em todas as categorias e, na grande maioria delas, também superior ao desempenho do Cenário I. A análise de indicador único, em endpoint, destacou o impacto em Mudança Climática, relativo principalmente à queima de gás natural na caldeira para a geração de vapor, como o principal impacto ambiental associado ao ciclo de vida da água na refinaria, responsável por mais de 90% do valor correspondente ao resultado do indicador único. A análise energética foi desenvolvida utilizando-se o indicador de Demanda Cumulativa de Energia (CED) e resultou em um desempenho superior do Cenário I, ainda que com pequenas diferenças em relação aos Cenários II e III. O pior desempenho foi o do Cenário II. Comparando-se a contribuição relativa dos diferentes tipos de energia, destaca-se a energia de origem hidrelétrica, responsável por cerca de 80% do indicador único de CED em todos os três cenários. A análise econômica foi realizada por meio de indicadores tradicionalmente utilizados para a análise de viabilidade de projetos Taxa Interna de Retorno (TIR) e Valor Presente Líquido (VPL) , considerando, como referência, as regras de cobrança pelo uso da água vigentes na bacia do rio Paraíba do Sul. Com os preços cobrados atualmente pelo uso da água desta bacia, a implantação de ambos os cenários de reúso (II e III) não se viabiliza economicamente. Para que isso ocorra, o valor cobrado pelo uso da água teria que ser da ordem de 50 a 80 vezes maior do que o que é cobrado atualmente. Dentre os cenários de reúso, o Cenário II apresentou desempenho econômico superior ao do Cenário III. / It was built a representative model of the water life cycle within a petroleum refinery, considering all the uses in which it is applied. In this context, under environmental, energetic and economic perspective, different scenarios were analyzed, where further treatment stages were added to the wastewater treatment process so that recycled water could be provided back to the refining process, reducing, therefore, the need for freshwater intake and pretreatment by the refinery. Scenario I is the base scenario, without implementation of any water reuse aimed action. In Scenario II, it is incorporated the additional stage called Phase 1 Treatment, which consists of a Clarification process followed by an Electrodialysis Reversal (EDR).This enables the recycling of 255.7 m3/h from the 350 m3/h previously discharged to the water body in Scenario I. In Scenario III, it is incorporated to the Scenario II setting an Evaporative Crystallization process for treating the concentrated brine resulting from the EDR process. This enables the recovery of more 55.4 m3/h from the 350 m3/h initially released, using, for that, the energy from residual steam previously not used by the refinery. The environmental analysis was developed through Life Cycle Assessment (LCA) and found very similar performances for all three scenarios. Despite that, the open profile analysis, of midpoint impacts, showed significant environmental gains from the closure of the water circuit and, though with very small advantages, Scenario III showed a better performance than Scenario II in all impact categories and, in most of them, also better than Scenario I performance. The single score analysis, considering endpoint impact categories, highlighted Climate Change, specially related to the natural gas burning in the boiler for steam generation, as the main impact category associated to the water life cycle within the refinery, being responsible for more than 90% of all the value of the single score indicator. The energetic analysis was developed using the Cumulative Energy Demand (CED) indicator and resulted in a better performance of Scenario I, even if with just small differences from Scenarios II and III. The worst performance was from Scenario II. Comparing the relative contribution of the different types of energy, the hydroelectricity was the most important one, being responsible for around 80% of the CED single score in all three scenarios. The economic analysis was developed through traditional indicators used for assessing projects viability Internal Return Rate (IRR) and Net Present Value (NPV), considering, as reference, the rules of charging for water use valid nowadays at the Paraíba do Sul river basin. With the prices charged nowadays for the water use from this basin, the implementation of both reuse scenarios is not economic viable. In order to make it viable, the charged value would have to be around 50 to 80 times higher than it is today. Among the reuse scenarios, Scenario II had a better economic performance than Scenario III.
|