• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 5783
  • 109
  • 97
  • 84
  • 84
  • 83
  • 55
  • 37
  • 29
  • 21
  • 21
  • 18
  • 3
  • 3
  • 1
  • Tagged with
  • 6029
  • 3373
  • 2538
  • 1559
  • 1414
  • 1184
  • 959
  • 777
  • 749
  • 729
  • 672
  • 662
  • 615
  • 611
  • 525
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
161

Contribuição para especificação de um sistema de geração de celulas programaveis para utilização em projeto de CI's1

Giorgio, Rosana Ceron Di, 1960- 06 August 1990 (has links)
Orientador: Carlos I.Z. Mammana / Dissertação (mestrado) - Universidade Estadual de Campinas, Faculdade de Engenharia Eletrica / Made available in DSpace on 2018-10-11T19:58:03Z (GMT). No. of bitstreams: 1 DiGiorgio_RosanaC_M.pdf: 5110363 bytes, checksum: 88b75001e789a09ba0acdd6daa0fffe9 (MD5) Previous issue date: 1990 / Resumo: Este trabalho dá a contribuição do projetista de circuitos integrados para o conjunto de especificações de um sistema de geração de células parametrizadas para uso em projeto de CI's. Células geradas pelo sistema possuem seus layouts codificados em função de parâmetros geométricos e/ou elétricos. Estes parâmetros, bem como seus valores numéricos, devem estar contidos em um arquivo de dados, de modo que possam ser alterados pelo projetista sempre que este deseje otimizar o layoul de uma dada célula. Futuras alterações no layout são obtidas sem que o código do mesmo seja editado. O redimensionamento do layout é féito pelo sistema com um mínimo de intervenção do projetista. O sistema de parametrização é dividido em duas partes: uma, responsável pela parametrização a nível elétrico e, outra, pela parametrização a nível de geometria. A especificação dos requisitos de ambas partes é feita neste trabalho, bem como dos dados necessários ao sistema de paramctrização / Abstract: Not informed. / Mestrado / Semicondutores, Instrumentos e Fotônica / Mestre em Engenharia Elétrica
162

Contribuição à análise de sobretensões transitórias na baixa tensão de redes de distribuição /

Santos, Thiago Farias dos, 1980-, Mustafa, Thair Ibrahim Abdel Hamid, Universidade Regional de Blumenau. Programa de Pós-Graduação em Engenharia Elétrica. January 2011 (has links) (PDF)
Orientador: Thair Ibrahim Abdel Hamid Mustafa. / Dissertação (mestrado) - Universidade Regional de Blumenau, Centro de Ciências Tecnológicas, Programa de Pós-Graduação em Engenharia Elétrica.
163

Planejamento da expansão de sistemas de transmissão usando transformadores defasadores /

Miasaki, Celso Tadao. January 2002 (has links)
Resumo: O trabalho apresenta uma nova formulação matemática para o problema de planejamento da expansão do sistema de transmissão, em que é considerada a possibilidade de se adicionar transformadores defasadores ao sistema elétrico. Nesta formulação também podem ser considerados dispositivos direcionadores de fluxo de potência ativa como os dispositivos FACTS. Entretanto, esses tipos de dispositivos não são analisados no presente trabalho. A formulação matemática proposta é resolvida através de um algoritmo heurístico de duas fases. Na primeira fase se encontra a solução ótima do modelo de transportes através da alocação de circuitos na configuração base para resolver o problema de capacidade de transmissão. Na segunda fase, procura-se a localização ótima dos transformadores defasadores. Na primeira fase é usado um algoritmo Branch-and-Bound especializado e na segunda fase, um algoritmo de programação linear (PL). / Abstract: The work has a new mathematical formulation for the transmission system expansion planning, the possibility of adding phase-shifter transformers in the electrical system is considered. In the new formulation directors active power flow devices can be also considered as the devices FACTS. However, those type of devices are not analyzed in the present work. The mathematical formulation is solved by a two-phase heuristic algorithm. In the first phase the optimal solution of transportation model is determined through the allocation of lines and transformers in the base configuration to solve the transmission capacity problem. In the second phase, the optimal allocation of the phase-shifter transformers is found. The Branch-and-Bound specialized algorithm and the linear programming algorithm are used in the 1st phase and in the 2nd phase, respectively. / Orientador: Francisco Villarreal Alvarado. / Coorientador: Rubén Augusto Romero Lazaro / Banca: José Luiz Resende Pereira / Banca: José Roberto Sanches Mantovani / Mestre
164

Estudo comparativo do modelo linear de Heffron e Phillips e modelo de sensibilidade de potência com a inclusão dos dispositivos FACTS SVC e TCSC /

Silva, Marcelo Santos. January 2008 (has links)
Orientador: Percival Bueno de Araujo / Banca: Anna Diva Plasencia Lotufo / Banca: Gideon Villar Leandro / Resumo: Com o crescimento do consumo de energia, aliado às restrições ambientais que dificultam a construção de unidades geradoras e/ou linhas de transmissão, os sistemas elétricos de potência se tornaram cada vez maiores e complexos. Para aumentar sua confiabilidade, diferentes sistemas foram interligados e passaram a trabalhar próximo de seus limites. Para melhorar a estabilidade e a eficiência destes sistemas, bem como torná-los mais flexíveis, começaram a ser utilizados os controladores FACTS. Para o estudo da atuação destes controladores no sistema de energia elétrica é necessária a modelagem do próprio sistema, com a consideração dos FACTS. Este trabalho apresenta estudos referentes à inclusão dos dispositivos FACTS em dois modelos lineares do sistema de potência: o conhecido como de "Heffron e Phillips" e o de "Sensibilidade de Potência". Estes modelos se prestam ao estudo da estabilidade a pequenas perturbações de um sistema elétrico de potência. São estudados inicialmente os modelos sem os compensadores e, na seqüência, os modelos são modificados para se considerar a atuação dos controladores FACTS. A partir dos modelos são realizadas simulações, e os resultados obtidos são discutidos e conclusões são apresentadas a respeito da estabilidade a pequenas perturbações do sistema elétrico de potência. / Abstract: The increase of power demand combined to environmental constraints, which has restrained the construction of new generation and transmission systems, has resulted in large, and even more complex than ever, electric power systems. Distinct systems have been interconnected to improve reliability and are projected to work around their limitation. Flexible AC Transmission Systems (FACTS) controllers have been employed to improve stability and efficiency, and give some flexibility to existing power systems. Modeling and simulation of such systems are necessary to understand dynamic operation of FACTS controllers. The present work presents studies related to the insertion of FACTS controllers into two linear power system models: the "Heffron and Philips" and the "power sensitivity". These models are frequently used to evaluate small signal stability in electric power systems. Firstly, models without compensating are studied. Afterward, the linear models are modified to include FACTS controllers. From computing simulations, obtained results are discussed and conclusions are presented regarding the influence of FACTS controllers on small signal stability analysis. / Mestre
165

Demanda, Consumo e Custo das Alternativas ao Chuveiro Elétrico: O exemplo do Estado de São Paulo\". / Demand, consumption and cost of alternatives to the shower Electrical: O example of the State of Sao Paulo

Matajs, Roberto Ramos 08 October 1997 (has links)
Este trabalho avalia o consumo, a demanda e o custo das alternativas ao chuveiro elétrico. A possibilidade de substituição desse equipamento pode contribuir na redução do pico na demanda de potência no horário de ponta das concessionárias de energia elétrica. A motivação para realização desse trabalho é justificada, ao analisar as curvas de carga do setor residencial nacional e em particular do estado de São Paulo - que serviu de base para esse estudo -, onde é possível identificar a demanda de potência requerida pelos 4 milhões de chuveiros elétricos, ligados quase que simultaneamente durante o período das 18 as 19 horas. Através de uma análise técnica-financeira avalia-se tanto para o consumidor quanto para a concessionária os custos e benefícios de cada alternativa. Os primeiros resultados indicam que nenhuma das alternativas apresenta viabilidade econômica para ambos participantes. A melhoria nos resultados surge quando considera-se que a concessionária de energia elétrica, ao invés de investir na oferta da expansão de energia, propõe investir na demanda, subsidiando parte do investimento inicial necessário para aquisição das alternativas que podem beneficiar ambos participantes. / The purpose of this work is to evaluate the consumption, the demand and the costs of the alternatives to the electric shower. The possibilities replace this equipement can cantribute the reduction of the higer demand of the potency in the period of the major of electric energy suppiier. The realisation of this work was motivated by analysing the power curves of the nationai residential sector and particularly in São Paulo - that served as a basis for this study - and where it is possibie the identification of the required potency demand of the aimost 4 million electric showers, ali of them switched on daily at the same time at Ieast once during the maximum period demand of the electric sector. Through the financial analysis it is possibie to evaluate for both the consumer and the suppiier the costs and benefits of each possible alternatives for the electric shower. The results of the first analysis show some restrictions to the economic viabiiity for both participants. The improvement in the results arises in a second analysis, when it is being considered that the electric power supplier, instead of investing in the offer expansion, proproses itseif to invest in the demand, subsidizing part of the necessary initial investment in the acquisition of the alternatives that can benefit both participants.
166

Análise da Formação e Destinação dos Excentes de Energia Elétrica / Analysis of the Formation and Use of Electricity Excentes

Antunes, Dercia Maria 24 October 1997 (has links)
No início dos anos 80, vericou-se um enorme excedente de energia elétrica que possibilitou a implementação de um programa de substituição de energéticos importados por eletricidade. Considerando a energia elétrica como um fator de desenvolvimento é importante que as previsões de consumo de energia, atendam os interesses da sociedade como um todo. A origem dos excedentes verificados foi identificada após estudos e análises dos Planos de Atendimento aos Requisitos de Energia\", desenvolvidos a partir da segunda metade da década de 60 até o nal da década de 70 e de sua contextualização econômica. A energia elétrica foi uma opção vantajosa para os consumidores de derivados de petróleo e oportuna para o País. Contudo, o atendimento de novas cargas não previstas pelo setor elétrico refletiu nos sistemas, obrigando as concessionárias de energia a antecipar os investimentos em distribuição e transmissão. A ampliação do mercado de energia. possibilitada pela comercialização dos excedentes, foi induzida por uma decisão política de elevar os preços dos derivados de petróleo e flexibilizar a comercialização da energia excedente através de tarifas especiais. / A signicant excess of electrical energy, veried on the early nineteen eightie, allowed the implementation of an imported energy substitution program. Considering electrical energy as an important factor for development it is important to have global requisites planning for all society. The origin of the excess of electrical energy, veried in early eighties, was found after study and analyses of the Plans Requirements of Energy in the seventies years and the Government Plans for those years. The electrical energy was a good option for both the consumers and the Government, but it was not as good for the energy concessionaires because the prices dened for generation, transmission and distribution were very low. The expansion of electrical energy consumption was induced by the effect of the combined political decision to substantially raise the prices of oil derivatives and flexibilization of the electrical energy commercialization excess through special tariffs.
167

Análise da produção de energia elétrica em duas indústria de processamento de cana da região norte do Estado de São Paulo / Analysis of the production of electricity in two sugarcane processing industries in the northern region of São Paulo

Conceição, Eduardo Pinto 16 December 1999 (has links)
O presente trabalho de pesquisa foi desenvolvido tendo por objetivo estudar e verificar o comportamento da produção de energia elétrica por sistemas de cogeração em duas indústrias de processamento de cana-de-açúcar. As indústrias objeto do estudo situam-se ambas na região Norte do Estado de São Paulo, onde foram coletados dados de cana moída, energia adquirida da concessionária, energia autogerada, potencia média gerada, consumo específico e produção de bagaço referentes ao período 1990-1997. Corn as séries de variáveis, foram elaboradas tabelas resumidas das médias, medianas e desvio-padrão mensais, corn objetivo de se avaliar o comportamento dessas variáveis ao longo das safras, bem como se observar as tendências delineadas pelos dados. O ajustamento de regressão permitiu inferir o grau de aderência dos dados coletados a modelos matemáticos, e a partir destes, verificar o desempenho das duas indústrias em termos de produtividade e viabilidade de produção de energia elétrica excedente. Os resultados obtidos mostram que das duas usinas estudadas, a Usina A praticamente manteve estável os níveis de produção durante todo período de estudo, enquanto a Usina B apresentou um crescimento na produção industrial da ordem de 45% entre as safras inicial e final do estudo. / This research work was developed with the objective study and verify the behavior of the production of electricity by cogeneration systems in two industries processing cane sugar. The object of study industries are located both in the Northern region Sao Paulo, where data were collected from crushed sugarcane, commercially purchased power, self-generated energy, average power generated, specific consumption and bagasse production for the period 1990-1997. Corn sets of variables, the summary tables were prepared mean, median and standard deviation of monthly corn objective of evaluating the behavior of these variables over the crops, as well as observe the trends outlined by the data. The adjustment regression allow us to infer the degree of adherence data collected mathematical models, and from these, check the performance of two industries in terms of productivity and viability of producing electricity surplus. The results show that the two plants studied, The Plant remained practically stable production levels throughout the study period, while Plant B showed a growth in industrial production order of 45% between the initial and final harvests of the study.
168

Condições Operacionais para o Desenvolvimento do Mercado de Eficiência Energética do Setor Residencial de Lima Metropolitana / Operating Conditions for the Development of Market Efficiency in the Residential Sector of Metropolitan Lima

Albújar, Borsi Félix Romero 22 August 1996 (has links)
No setor elétrico do Peru, o setor residencial de Lima Metropolirana apresenta um grande potencial de conservação de energia, principalmente no serviço de iluminação, além da refrigeração e o aquecimento de água, proporcionalmente pequenos, porém signicativo. Neste trabalho, estima-se o potencial acumulada de conservação de energia elétrica igual a 8:456.9 GWh, no período 1995-2005, como resultado da utilização de tecnologias eficientes no serviços de iluminação, conservação de alimentos e aquecimento de água. Os custos de energia conservada sio inferiores a US$ 0,04/kWh, ou seja, equivalem a 36% do preço de energia elétrica que paga o consumidor residencial (US$ 0,11/kWh). Com a finalidade de superar as barreiras ao uso eciente da energia elétrica no Peru, neste trabalho propõe-se diversas condições que devem estabelecer-se para desenvolver um mercado de tecnologias eficientes com o objetivo de acelerar e aumentar a penetração destas tecnologias no mercado de usos nais de energia elétrica no setor residencial de Lima metropolitana. Analisam-se condições operacionais ao nível de governo, dos fabricantes, das concessionárias e tarifas elétricas, e dos consumidores. / The residential sector in the city of Lima, Peru has a large potential for energy conservation, mainly, for lighting, refrigeration and water heating. While relatively small, savings obtained for these energy services are meaningful. In this work, we assessed a cumulated potential of 8,456.9 GWh for electricity conservation in the period 1995-2005, that might be developed through efficient technologies for residential lighting, food storage and water heatin g. The energy conservation costs are below US$ 0.04/kWh, which is equivalent to 36 percent of the residential electricity rate in Lima (US$ 0.11/kWh). In this work, we discussed some operational conditions for development of a market for energy efficient technologies and equipments that may increase the penetration of those devices for the residential electricity end-use consumption in Lima. The operational conditions for development of such a market have been considered for its four main components, i.e., the power distribution utility, the consumers, the electricity rates, the equipment manufacturers and the governments.
169

Análise da qualidade de energia eléctrica em instalações de grande complexidade

Fernandes, Tiago Daniel Moreno January 2012 (has links)
Tese de mestrado integrado. Engenharia Electrotécnica e de Computadores - Energia. Faculdade de Engenharia. Universidade do Porto. 2012
170

Avaliação da adequação da rede de transporte de energia eléctrica em ambiente liberalizado

Gouveia, Eduardo Miguel Teixeira Mendonça January 2009 (has links)
Tese de doutoramento. Engenharia Electrotécnica e de Computadores. Faculdade de Engenharia. Universidade do Porto. 2009

Page generated in 0.0414 seconds