• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 89
  • 8
  • 5
  • Tagged with
  • 104
  • 72
  • 53
  • 48
  • 46
  • 44
  • 44
  • 36
  • 30
  • 24
  • 20
  • 17
  • 15
  • 15
  • 14
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
91

Metodologia para coordenação otimizada entre relés de distância e direcionais de sobrecorrente em sistemas de transmissão de energia elétrica / Methodology for optimized coordination of distance and directional overcurrent relays in electrical transmission systems

Vinícius de Cillo Moro 05 September 2014 (has links)
A proteção de sistemas de energia elétrica possui papel extremamente importante no aspecto de garantir o fornecimento de energia de maneira segura e confiável. Assim, a ação indevida ou a não atuação deste sistema de proteção pode causar danos materiais ou econômicos tanto para as concessionárias quanto para os consumidores de energia elétrica. Dessa forma, o sistema de proteção deve estar bem ajustado para que possa garantir suas funções, sendo sensível, seletivo, confiável e rápido. Para tanto, uma boa coordenação entre os relés de proteção deve ser estabelecida. No caso de um sistema de transmissão, o qual costuma ser um sistema malhado, a proteção é comumente realizada por relés de distância aliados a relés de sobrecorrente com unidade direcional, sendo que estes funcionam como elemento de retaguarda daqueles. O processo de ajuste desses relés é um trabalho muito difícil e demorado, que pode ainda estar sujeito a erros do engenheiro de proteção responsável pelo estudo. Neste contexto, este trabalho tem como objetivo desenvolver uma metodologia baseada na otimização por enxame de partículas que obtenha automaticamente os ajustes desses relés de forma a garantir a coordenação e seletividade entre eles, tornando assim o processo de ajuste mais rápido e preciso. Dessa forma, essa metodologia pode constituir uma ferramenta de auxílio muito favorável ao engenheiro de proteção. Além disso, como em todo problema de otimização, a função objetivo e as restrições foram definidas de maneira a retratar o problema de coordenação envolvendo tanto os relés de distância quanto os direcionais de sobrecorrente. A metodologia foi aplicada a dois sistemas, um fictício com 16 relés e um sistema de transmissão real com 44 relés, sendo que em ambos os casos ela apresentou resultados bastante satisfatórios proporcionando ajustes bem coordenados. / Electrical power systems protection has a very important role in the aspect of ensuring energy supply with safety and reliability. Thus, improper action or non-actuation of this protection system can cause materials and/or economics damages to electricity utilities as well as ordinary energy consumers. Therefore the protection system must be well adjusted so it can ensure its functions and thus being sensible, selective, reliable and fast. In order to achieve these characteristics, the protective relays must be well coordinated. In the case of meshed transmission systems, the protection is generally performed by distance relays as primary protection associated with directional overcurrent relays as backup protection. The process of adjusting these relays is very tough, slow and it can even be subject to the protection engineer mistakes. In this context, this work aims to develop a particle swarm optimization based methodology that can automatically obtain these relays adjusts so they can ensure relays coordination and selectivity, and then make this setting process faster and more precise. Thus, this methodology may provide a very favorable tool to aid the protection engineer. Moreover, as in any optimization problem, the objective function and the constraints were defined to represent the coordination problem involving both distance and directional overcurrent relays. The methodology was applied to two systems, a fictitious with 16 relays and a real transmission system with 44 relays, and in both cases it showed satisfactory results providing well-coordinated settings.
92

Algoritmo enxame de partículas discreto para coordenação de relés direcionais de sobrecorrente em sistemas elétricos de potência / Discrete particle swarm algorithm for directional overcurrent relays coordination in electric power system

Bernardes, Wellington Maycon Santos 26 March 2013 (has links)
Este trabalho propõe uma metodologia baseada em técnicas inteligentes capaz de fornecer uma coordenação otimizada de relés direcionais de sobrecorrente instalados em sistemas de energia elétrica. O problema é modelado como um caso de programação não linear inteira mista, em que os relés permitem ajustes discretizados de múltiplos de tempo e/ou múltiplos de corrente. A solução do problema de otimização correspondente é obtida através de uma metaheurística nomeada como Discrete Particle Swarm Optimization. Na literatura técnico-científica esse problema geralmente é linearizado e aplicam-se arredondamentos das variáveis discretas. Na metodologia proposta, as variáveis discretas são tratadas adequadamente para utilização na metaheurística e são apresentados os resultados que foram comparados com os obtidos pelo modelo clássico de otimização implementado no General Algebraic Modeling System (GAMS). Tendo em vista os aspectos observados, o método permite ao engenheiro de proteção ter um subsídio adicional na tarefa da coordenação dos relés direcionais de sobrecorrente, disponibilizando uma técnica eficaz e de fácil aplicabilidade ao sistema elétrico a ser protegido, independentemente da topologia e condição operacional. / This work proposes a methodology that based on intelligent technique to obtain an optimized coordination of directional overcurrent relays in electric power systems. The problem is modeled as a mixed integer nonlinear problem, because the relays allows a discrete setting of time and/or current multipliers. The solution of the proposed optimization problem is obtained from the proposed metaheuristic named as Discrete Particle Swarm Optimization. In scientific and technical literature this problem is usually linearized and discrete variables are rounded off. In the proposed method, the discrete variables are modeled adequately in the metaheuristic and the results are compared to the classical optimization solvers implemented in General Algebraic Modeling System (GAMS). The method provides an important method for helping the engineers in to coordinate directional overcurrent relays in a very optimized way. It has high potential for the application to realistic systems, regardless of topology and operating condition.
93

Análise híbrida numérico-experimental da troca de calor por convecção forçada em aletas planas / Numerical-experimental hybrid analysis of heat change by forced convection in plana fins

Silva, Maico Jeremia da 28 July 2015 (has links)
Made available in DSpace on 2016-12-12T20:25:12Z (GMT). No. of bitstreams: 1 Maico Jeremias da Silva.pdf: 5502697 bytes, checksum: 292822b79334828b19d2d99087aae96b (MD5) Previous issue date: 2015-07-28 / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / This work discusses the behaviour of the convection heat transfer coefficient in plane fins with variation of air flow velocity and fin spacing. The differential equation that governs heat transfer in fins is discretized by the finite volume method, which enables computation of the fin thermal characteristics, such as temperature distribution, heat transfer and fin efficiency. The determination of the convection coefficient, important parameter for thermal analysis, is performed by applying a heuristic optimization method, known as Particle Swarm Optimization, which combines data measured from experimental analysis conducted in wind tunnel with the aforementioned heat transfer numerical approximation of fins. / Este trabalho analisa os efeitos da velocidade do escoamento de ar e do espaçamento entre aletas no coeficiente de convecção forçada sobre as superfícies de aletas planas. As equações diferenciais que definem a transferência de calor em aletas são discretizadas pela técnica de volumes finitos possibilitando a determinação das características térmicas da aleta, tais como perfil de temperatura, calor transferido e eficiência térmica. A determinação do coeficiente de convecção, parâmetro fundamental para análises térmicas, é realizada mediante a aplicação de um método de otimização heurístico, conhecido como Método do Enxame de Partículas, que combina os dados obtidos da análise experimental realizada em túnel de vento com a aproximação numérica da troca de calor na aleta descrita acima
94

Aplicação da otimização por enxame de partículas com topologia "multi-ring" na estimação de parâmetros de linhas de transmissão / Aplication of particle swarm optimization with “multi-ring” topology in the estimation of transmission line parameters

Arruda, Sérgio Alexandre Martins 03 November 2015 (has links)
Submitted by Luciana Ferreira (lucgeral@gmail.com) on 2016-01-29T07:12:20Z No. of bitstreams: 2 Dissertação - Sérgio Alexandre Martins Arruda - 2015.pdf: 11515850 bytes, checksum: 6831ad6e25385ed4aa78a841d7afba67 (MD5) license_rdf: 23148 bytes, checksum: 9da0b6dfac957114c6a7714714b86306 (MD5) / Approved for entry into archive by Luciana Ferreira (lucgeral@gmail.com) on 2016-01-29T07:13:48Z (GMT) No. of bitstreams: 2 Dissertação - Sérgio Alexandre Martins Arruda - 2015.pdf: 11515850 bytes, checksum: 6831ad6e25385ed4aa78a841d7afba67 (MD5) license_rdf: 23148 bytes, checksum: 9da0b6dfac957114c6a7714714b86306 (MD5) / Made available in DSpace on 2016-01-29T07:13:48Z (GMT). No. of bitstreams: 2 Dissertação - Sérgio Alexandre Martins Arruda - 2015.pdf: 11515850 bytes, checksum: 6831ad6e25385ed4aa78a841d7afba67 (MD5) license_rdf: 23148 bytes, checksum: 9da0b6dfac957114c6a7714714b86306 (MD5) Previous issue date: 2015-11-03 / Present world demands high availability of electricity for various equipment, in a context in which dominates the intensive use of technology. The electricity is transported from generation centers to consumers through Transmission Lines (TLs), which in Brazil have significant dimensions, given the continental size of the country, his predominantly hydro power plant generation, located long distances from major centers consumption. To ensure compliance of this high demand, often the electric power companies overload these TLs, generating undesirable effects, such as the formation of arrow in the conductors, for example. Monitoring of TL operating conditions is key part, therefore, to ensure system availability and security. This work aims in this context to present a method to assist in the monitoring of three-phase TLs of simple circuit based on measurement of electric and magnetic fields of the line and in application of an optimization procedure based on Particle Swarm Optimization metaheuristic, with a topology denominated Multi-Ring, to estimate simultaneously the values of current, voltage, cable-ground clearance of conductors and distance between phases, in a cross section of the line, assisting electric power companies and the National Electric System Operator (ONS) in the monitoring task. The good results achieved, combined with its simplicity of implementation compared to other methods and its robustness, indicate their suitability for estimating these parameters. Associated with this, the reasonably low times obtained in the execution make it promising for use by the electric power company and by the system operator as an auxiliary tool in monitoring TLs. / O mundo atual demanda alta disponibilidade de energia elétrica para equipamentos diversos, em um contexto em que predomina o uso intensivo de tecnologia. A energia elétrica é transportada dos centros de geração até os consumidores por meio de Linhas de Transmissão (LTs), que no Brasil possuem significativas dimensões, dados o tamanho continental do país e a matriz de geração predominantemente hídrica e localizada a longas distâncias dos grandes centros de consumo. Para assegurar o atendimento dessa alta demanda, muitas vezes as concessionárias do sistema elétrico sobrecarregam essas LTs, gerando efeitos indesejáveis como a formação de flecha nos condutores, por exemplo. O monitoramento das condições de operação da LT é peça chave, portanto, para garantir a disponibilidade e segurança do sistema. Este trabalho visa, nesse contexto, apresentar um método que auxilie no monitoramento de LTs trifásicas de circuito simples, com base na medição dos campos elétrico e magnético gerados pela linha e na aplicação de um procedimento de otimização baseado na metaheurística de Otimização por Enxame de Partículas (do inglês, Particle Swarm Optimization), com uma topologia denominada Multi-Ring, para estimar simultaneamente os valores da corrente, tensão, altura cabo-solo dos condutores e distância entre fases, em uma seção transversal da linha, podendo auxiliar as concessionárias e o Operador Nacional do Sistema Elétrico (ONS) na tarefa de monitoramento. Os bons resultados alcançados, aliados à maior simplicidade de implementação em relação a outros métodos e à sua robustez, indicam sua adequação para a estimação desses parâmetros. Associado a isso, os tempos razoavelmente baixos obtidos na execução o tornam promissor para aplicação por concessionárias e pelo operador do sistema como ferramenta auxiliar no monitoramento de LTs.
95

Comparação de abordagens MOPSO no planejamento da operação de sistemas hidrotérmicos / Comparing MOPSO approaches for hydrothermal systems operation planning

Silva, Jonathan Cardoso 26 February 2014 (has links)
Submitted by Luciana Ferreira (lucgeral@gmail.com) on 2015-01-27T14:37:37Z No. of bitstreams: 2 license_rdf: 23148 bytes, checksum: 9da0b6dfac957114c6a7714714b86306 (MD5) Dissertação - Jonathan Cardoso Silva - 2014.pdf: 3627934 bytes, checksum: 4b576bd42a95d94493a78b1e54c2d64a (MD5) / Approved for entry into archive by Luciana Ferreira (lucgeral@gmail.com) on 2015-01-28T12:39:13Z (GMT) No. of bitstreams: 2 license_rdf: 23148 bytes, checksum: 9da0b6dfac957114c6a7714714b86306 (MD5) Dissertação - Jonathan Cardoso Silva - 2014.pdf: 3627934 bytes, checksum: 4b576bd42a95d94493a78b1e54c2d64a (MD5) / Made available in DSpace on 2015-01-28T12:39:13Z (GMT). No. of bitstreams: 2 license_rdf: 23148 bytes, checksum: 9da0b6dfac957114c6a7714714b86306 (MD5) Dissertação - Jonathan Cardoso Silva - 2014.pdf: 3627934 bytes, checksum: 4b576bd42a95d94493a78b1e54c2d64a (MD5) Previous issue date: 2014-02-26 / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior - CAPES / The operation planning of hydrothermal systems is a complex, dynamic, stochastic, nonlinear and interconnected problem. In this study, we consider that this problem must tackle two objectives simultaneously: minimize thermoelectric generation (by maximizing the use of hydroelectric plants) and maximize water reservoirs’ level of hydroelectric plants. This dissertation presents the application of some multiobjective meta-heuristics, using a set of eight actual plants from Brazilian interconnected system in three periods of medium-term planning. The algorithms used were of two types: those based on particle swarms (MOPSO , MOPSO-TVAC , SMPSO, MOPSO-CDR and MOPSO-DFR) and evolutionary algorithms (SPEA2 and MOEAD/DRA). The results from previous studies, made with single objective techniques, were inserted in the initial population of the algorithms and compared with those simulations with normal initialization. We observed that MOPSO-CDR outperformed the other algorithms in the test scenarios while, in some cases, MOPSO has also generated competitive results. / O problema do planejamento da operação de sistemas hidrotérmicos é complexo, dinâmico, estocástico, interconectado e não linear. Este problema é tratado de modo atender a dois objetivos simultaneamente: maximizar a geração elétrica nas usinas hidrelétricas (ou minimizar o custo com a complementação da geração por termelétricas) e maximizar o nível dos reservatórios de água das hidrelétricas. Este trabalho apresenta a aplicação de algumas meta-heurísticas multiobjetivo a este problema, utilizando um conjunto de oito usinas reais do Sistema Interligado Nacional em três períodos de planejamento de médio prazo. Os algoritmos utilizados foram de dois tipos: os baseadas em enxames de partículas (MOPSO, MOPSO-TVAC,SMPSO, MOPSO-CDR e MOPSO-DFR) e os algoritmos evolucionários (SPEA2 e MOEAD/DRA). Foram realizados testes com a inserção de resultados de estudos anteriores com técnicas de único objetivo na população inicial dos algoritmos e comparados com os testes com inicialização normal. Observou-se que o algoritmo MOPSO-CDR obtém os melhores resultados nos cenários de testes utilizados, competindo em alguns casos com os resultados do MOPSO.
96

Agrupamento nebuloso de dados baseado em enxame de partículas: seleção por métodos evolutivos e combinação via relação nebulosa do tipo-2

Szabo, Alexandre 29 October 2014 (has links)
Made available in DSpace on 2016-03-15T19:38:52Z (GMT). No. of bitstreams: 1 Alexandre Szabo.pdf: 2177168 bytes, checksum: 8b503cd1beb4c700f1905e07a0b08362 (MD5) Previous issue date: 2014-10-29 / Fundação de Amparo a Pesquisa do Estado de São Paulo / Clustering usually treats objects as belonging to mutually exclusive clusters, what is usually im-precise, because an object may belong to more than one cluster simultaneously with different membership degrees. The clustering algorithms, both crisp and fuzzy, have a number of parameters to be adjusted so that they present the best performance for a given database. Furthermore, it is known that no single algorithm is better than all the others for all problem classes, and the combi-nation of solutions found by various algorithms (or the same algorithm with different parameters) may lead to a global solution that is better than those found by individual algorithms, including the best one. It is within this context that the present thesis proposes a new fuzzy clustering algo-rithm inspired by the behavior of particle swarms and, then, introduces a new form of combining the clustering algorithms using concepts from Type-2 fuzzy sets. / Da maneira tradicional o agrupamento trata os objetos que compõem a base como pertencentes a grupos mutuamente exclusivos, o que nem sempre é verdade, pois um objeto pode pertencer a mais de um grupo com diferentes graus de pertinência. Os algoritmos de agrupamento, sejam eles convencionais ou nebulosos (capazes de tratar múltiplas pertinências simultaneamente), possuem diversos parâmetros a serem ajustados de tal forma que ofereçam o melhor desempenho para uma base de dados. Além disso, é sabido que nenhum algoritmo é superior a todos os outros para todas as classes de problemas e que combinar soluções fornecidas por diferentes algoritmos pode levar a uma solução global superior a todas as soluções individuais, inclusive à melhor. É nesse contexto que a presente tese propõe um novo algoritmo de agrupamento nebuloso de dados inspirado no comportamento de enxames de partículas e, em seguida, propõe uma nova forma de realizar combinações (ensembles) de algoritmos de agrupamento usando conceitos da teoria de conjuntos nebulosos do Tipo-2.
97

Controle pid fuzzy adaptativo com estabilidade robusta por enxame de partículas multiobjetivo

Costa, Edson Bruno Marques 22 February 2016 (has links)
Made available in DSpace on 2016-08-17T14:52:41Z (GMT). No. of bitstreams: 1 Dissertacao-EdsonBrunoMarquesCosta.pdf: 6213037 bytes, checksum: a95446ec89758c52cc2add52c4965e82 (MD5) Previous issue date: 2016-02-22 / Conselho Nacional de Desenvolvimento Científico e Tecnológico / An adaptive fuzzy digital PID controller design methodology via multiobjective particle swarm optimization (MOPSO) based on robust stability criterion, is proposed. The plant to be controlled is modelled considering a Takagi-Sugeno (TS) fuzzy structure from input-output experimental data, by using the fuzzy C-Means clustering algorithm (antecedent parameters estimation) and fuzzy recursive least squares algorithm (consequent parameters estimation), respectively. An adaptation mechanism was formulated as a MOPSO problem for online tuning of the fuzzy digital PID controller parameters based on the fuzzy model parameters obtained recursively and the gain and phase margins specifications. Computational results for adaptive fuzzy digital PID control of a thermal plant with time varying delay is presented to illustrate the efficiency and applicability of the proposed methodology. / Nesta dissertação é proposta uma metodologia para controle PID fuzzy adaptativo com estabilidade robusta por enxame de partículas multiobjetivo, para sistemas dinâmicos não-lineares, com atraso puro de tempo. Uma estrutura de modelo fuzzy Takagi-Sugeno é definida para representação de sistemas dinâmicos não-lineares, com atraso puro de tempo, no domínio do tempo discreto. Os parâmetros do modelo fuzzy são estimados recursivamente a partir de dados experimentais, utilizando a técnica de agrupamento fuzzy C-Means (estimação do antecedente) e mínimos quadrados recursivos fuzzy (estimação do consequente). Uma estrutura de controle PID digital fuzzy Takagi-Sugeno é definida utilizando a estratégia de compensação paralela e distribuída. Um mecanismo de adaptação é formulado como um problema de otimização por enxame de partículas multiobjetivo, para ajuste online dos parâmetros do controlador fuzzy Takagi-Sugeno baseado em critério de estabilidade robusta (especificações de margem de ganho e fase). Resultados experimentais para controle PID fuzzy adaptativo baseado em critério de estabilidade robusta de um sistema térmico com atraso puro de tempo variante é apresentado para ilustrar a eficiência e aplicabilidade da metodologia proposta.
98

SISTEMA DE DETECÇÃO DE INTRUSOS EM ATAQUES ORIUNDOS DE BOTNETS UTILIZANDO MÉTODO DE DETECÇÃO HÍBRIDO / Intrusion Detection System in Attacks Coming from Botnets Using Method Hybrid Detection

CUNHA NETO, Raimundo Pereira da 28 July 2011 (has links)
Made available in DSpace on 2016-08-17T14:53:19Z (GMT). No. of bitstreams: 1 dissertacao Raimundo.pdf: 3146531 bytes, checksum: 40d7a999c6dda565c6701f7cc4a171aa (MD5) Previous issue date: 2011-07-28 / The defense mechanisms expansion for cyber-attacks combat led to the malware evolution, which have become more structured to break these new safety barriers. Among the numerous malware, Botnet has become the biggest cyber threat due to its ability of controlling, the potentiality of making distributed attacks and because of the existing structure of control. The intrusion detection and prevention has had an increasingly important role in network computer security. In an intrusion detection system, information about the current situation and knowledge about the attacks contribute to the effectiveness of security process against this new cyber threat. The proposed solution presents an Intrusion Detection System (IDS) model which aims to expand Botnet detectors through active objects system by proposing a technology with collect by sensors, preprocessing filter and detection based on signature and anomaly, supported by the artificial intelligence method Particle Swarm Optimization (PSO) and Artificial Neural Networks. / A ampliação dos mecanismos de defesas no uso do combate de ataques ocasionou a evolução dos malwares, que se tornaram cada vez mais estruturados para o rompimento destas novas barreiras de segurança. Dentre os inúmeros malwares, a Botnet tornou-se uma grande ameaça cibernética, pela capacidade de controle e da potencialidade de ataques distribuídos e da estrutura de controle existente. A detecção e a prevenção de intrusão desempenham um papel cada vez mais importante na segurança de redes de computadores. Em um sistema de detecção de intrusão, as informações sobre a situação atual e os conhecimentos sobre os ataques tornam mais eficazes o processo de segurança diante desta nova ameaça cibernética. A solução proposta apresenta um modelo de Sistema de Detecção de Intrusos (IDS) que visa na ampliação de detectores de Botnet através da utilização de sistemas objetos ativos, propondo uma tecnologia de coleta por sensores, filtro de pré-processamento e detecção baseada em assinatura e anomalia, auxiliado pelo método de inteligência artificial Otimização de Enxame da Partícula (PSO) e Redes Neurais Artificiais.
99

Diques mesozoicos subalcalinos de baixo titânio da Região dos Lagos (RJ): geoquímica e geocronologia 40Ar/39Ar / Subalkaline low-Ti Mesozoic dykes from Região dos Lagos (RJ): geochemistry and 40Ar/39Ar geochronology

Karine Zuccolan Carvas 14 December 2016 (has links)
Os diques da Região dos Lagos, localizados entre os municípios de Arraial do Cabo, Cabo Frio e Armação dos Búzios (RJ), integram o Enxame de Diques da Serra do Mar (ESM) e apresentam particularidades geoquímicas e geocronológicas que fazem com que seu papel na abertura do Atlântico Sul ainda seja pouco compreendido. Este estudo apresenta os resultados da investigação detalhada sobre a gênese e a idade dessas intrusões, através novas análises de elementos maiores, menores, traços, razões isotópicas (Sr, Nd e Pb) e datações 40Ar/39Ar. Os diques são quimicamente representados por basaltos toleíticos, andesibasaltos toleíticos e basaltos transicionais, com teores de TiO2, em sua maioria, inferiores a 2% (BTi). Os dados de geoquímica elemental permitem identificar dois grupos, um mais primitivo e empobrecido em elementos incompatíveis (grupo A), e outro mais evoluído e enriquecido nesses elementos (grupo B). Os dados sugerem pouca ou nenhuma influência de contaminação crustal durante a evolução e apontam semelhanças do grupo A com os basaltos BTi (Esmeralda) da Província Magmática do Paraná (PMP). O grupo B, por sua vez, apresenta características distintas dos derrames BTi da PMP. O grupo A possui composições isotópicas pouco radiogênicas em Sr e mais radiogênicas em Pb que o grupo B, assemelhando-se àquelas dos diques Horingbaai da Namíbia. As razões isotópicas de Pb sugerem que os dois grupos foram originados por fontes mantélicas distintas, as quais são também menos radiogênicas que os derrames BTi da PMP. Os dados não se adequam à diferenciação por cristalização fracionada com assimilação concomitante ou por mistura envolvendo os reservatórios mantélicos clássicos. Este comportamento pode estar relacionado a heterogeneidades do manto litosférico, causadas por longos processos de subducção durante a amalgamação do Gondwana ocidental. As análises 40Ar/39Ar mostram que a presença de sericitização e albitização nos plagioclásios pode imprimir as idades desses processos nos espectros. Plagioclásios sericitizados do grupo A forneceram idades de 106-108 Ma, e também um provável evento de albitização em 96 Ma. Tais idades discordam tanto das de plagioclásios frescos (idades máximas de 125-140 Ma), afetados por excesso de Ar em decorrência de inclusões de piroxênio e apatita, como daquelas de 132 Ma obtidas em anfibólio-biotita. Estas últimas devem marcar a intrusão dos diques do grupo A, confirmando sua associação com a PMP. A análise em rocha total de um dique do grupo B apresentou idade máxima de cerca de 108 Ma, sugerindo que a intrusão dos grupos A e B podem não ser contemporâneas. A similaridade entre a idade do grupo B e aquela de soerguimento da costa sudeste sugere que estes diques possam ter sido originados durante esse evento, que também teria causado a alteração (sericitização) dos plagioclásios do grupo A. / The Região dos Lagos tholeiitic dykes, located in Rio de Janeiro State, encompass the Arraial do Cabo, Cabo Frio and Armação de Búzios towns and integrate the Serra do Mar Dyke Swarm. Their role in the South Atlantic opening processes is still poorly defined because of their peculiar geochemical and geochronological features. In this work, the petrogenesis and the geochronology of these intrusions were investigated in detail based on new data of elemental (major, minor and trace elements) and isotope (Sr, Nd and Pb) geochemistry along with a careful 40Ar/39Ar dating. The dykes are chemically represented by tholeiitic basalts, andesi tholeiitic basalts and transitional basalts, usually presenting TiO2 contents lower than 2% (LTi). The elemental geochemistry allows the recognition of two magmatic groups; one of them is more primitive and depleted in incompatible elements (group A), whereas the other one is more evolved and enriched in these elements (group B). The data also indicate that crustal assimilation, if existed, had a small role in the magmatic evolution of both groups, and point out similarities between group A and the LTi flows (Esmeralda) from the Paraná Magmatic Province (PMP). Group B, in turn, displays geochemical features very different from those of the LTi basalts from PMP. The Sr isotope compositions of group A are less radiogenic than those of the B one, but the opposite occurs with Pb, which makes the first group similar to the Horingbaai dykes from Namibia. The Pb isotope ratios indicate that A and B were originated from distinct mantle sources, which also differ from those related to PMP LTi flows. The isotope data are not compatible with assimilation-fractional crystallization processes or simple mixtures involving the classic mantle reservoirs. This behavior suggests origin in heterogeneous lithospheric subcontinental mantle, probably affected by long subduction periods during Western Gondwana amalgamation. The 40Ar/39Ar geochronological data point out that the presence of plagioclase sericitization and albitization in their rims may imprint the age of these events in the age spectra. Sericitized plagioclase grains of group A displayed ages of 106-108 Ma, while the albitized fractions provided ages of 96 Ma. Such results disagree with both the fresh plagioclase grains (maximum ages of 125-140 Ma), very affected by excess Ar due to pyroxene and apatite inclusions, and the 132 Ma age of the amphibole-biotite aliquots. This last result very probably corresponds to the dyke emplacement event, confirming the genetic relationship between group A and the PMP. Whole rock dating in a sericite-free group B dyke provided maximum age of 108 Ma, which would imply that A and B groups are not coeval. The similarity between the last age and the uplifting event of Southwestern Brazilian coast suggests that the dykes of group B could have been generated during such process, which also altered (sericitized) the plagioclases of the group A dykes.
100

Otimização metaheurística de linhas de transmissão pela avaliação do vetor de poynting utilizando o método dos elementos de contorno

Oliveira, Lucas Vitor Fonseca de 30 March 2012 (has links)
Submitted by Renata Lopes (renatasil82@gmail.com) on 2016-05-31T15:07:36Z No. of bitstreams: 1 lucasvitorfonsecadeoliveira.pdf: 1420167 bytes, checksum: b5075b7ccc33c587012a46901a9b21af (MD5) / Approved for entry into archive by Adriana Oliveira (adriana.oliveira@ufjf.edu.br) on 2016-07-02T12:44:37Z (GMT) No. of bitstreams: 1 lucasvitorfonsecadeoliveira.pdf: 1420167 bytes, checksum: b5075b7ccc33c587012a46901a9b21af (MD5) / Made available in DSpace on 2016-07-02T12:44:37Z (GMT). No. of bitstreams: 1 lucasvitorfonsecadeoliveira.pdf: 1420167 bytes, checksum: b5075b7ccc33c587012a46901a9b21af (MD5) Previous issue date: 2012-03-30 / CAPES - Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / Com a abertura legal do setor elétrico brasileiro na década de 90 para investimentos privados, em especial com a implantação sistemática de leilões para definição dos concessionários de transmissão, diversos estudos foram efetuados com o objetivo de viabilizar projetos de linha de transmissão de modo a concorrem nesses leilões. Grandes transmissoras, como Furnas, Chesf e Eletronorte promoveram pesquisas em consórcio com empresas construtoras de linhas e fabricante de ferragens e isoladores, com o objetivo de desenvolverem projetos com baixa relação Reais/MW transmitido. Neste cenário, muitos projetos de linhas de potência natural elevada foram idealizados e implantados, e como fruto desses projetos, publicações foram realizadas descrevendo os resultados obtidos. Todavia, apesar da quantidade, qualidade e riqueza das informações publicadas, a descrição do processo de otimização dos parâmetros elétricos da linha, em especial da impedância característica, não receberam destaque, sendo muita das vezes suprimida nos artigos. Neste sentido, este trabalho propõe a investigação de um método inovador de otimização da capacidade de transmissão de linhas de potência natural elevada, através da análise indireta dos efeitos da variação do posicionamento dos cabos condutores no feixe sobre a impedância característica da linha, por meio de uma abordagem original que utiliza basicamente o vetor de Poynting como função objetivo do Método de Otimização por Enxame de Partículas, sendo os campos elétricos e magnéticos necessários para definição do vetor de Poynting calculados por meio do Método dos Elementos de Contorno. O método foi validado utilizando como exemplos a otimização das configurações de feixes da linha de 500 kV Interligação Norte/SUL III – Trecho 2 e Linha de 500 kV Presidente Dutra / Teresina / Sobral / Fortaleza. Foram encontrados ganhos na capacidade de transmissão de 7% e 22% respectivamente devido à redução da impedância característica calculada após a otimização através da rotina Line Constants do programa ATP/EMTP, e comparando-a com os valores originais. / With the legal opening for private investments in the Brazilian energy sector in the 90's, in particular the systematic implementation of auctions for defining power transmission concessions, several studies were made with the aim of developing transmission line projects in order to compete in these auctions. Major transmission companies such as Furnas, Eletronorte and CHESF promoted consortium research with line builders and hardware and insulators manufacturers, in order to develop projects with low cost/MW transmitted. In this scenario, many projects of high surge-impedance loading lines were developed and implemented, and as a result of these projects, publications were made describing the results. However, despite the quantity, quality and resourcefulness of published information, the descriptions of the optimization process of electrical line parameters, especially regarding characteristic impedance, were not given prominence, being often suppressed from the articles. Thus, this study proposes the investigation of a method for optimizing the transmission capacity of high surge-impedance loading lines, varying the power cables in the bundle, indirectly reducing its characteristic impedance through an original approach that uses basically the Poynting's vector as objective function of the Particle Swarm Optimization method.The electric and magnetic fields needed for defining the Poynting vector were calculated using the Boundary Element Method. The method was validated through the optimization of bundle configuration, using as a model the characteristics of the 500 kV line North / South Interconnection III - Segment 2 and the 500 kV line Presidente Dutra / Teresina / Sobral / Fortaleza. It was found transmission capacity gains of 7% and 22% respectively, by reducing the characteristic impedance, which was calculated after the optimization using the EMTP/ATP Line Constants Program, comparing it with the original values.

Page generated in 0.1194 seconds