• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • 1
  • Tagged with
  • 3
  • 3
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Cellplastisolering i fasader : Kan kostnadseffektivitet och brandsäkerhet kombineras?

Lindholm, Lars January 2015 (has links)
From a fire perspective EPS insulation has characteristics that makes it inflammable and can cause fast fire spread which is aggravating for the fire and rescue services. Reports from fire and rescue operations related to both EPS insulation and construction sites of buildings, show that fires most often are related to faults in protecting combustible materials during hot works such as welding. A case study was performed with the purpose to investigate flaws during handling and installation of EPS insulation at four construction sites. The project consisted of field studies with interviews with respective site managers and a supplier of façade systems. Interviews were also conducted with the fire and rescue services to obtain a deeper understanding for the problems of fire rescue operations during fires with large quantities of EPS insulation and the risks from using combustible insulation in modern building technology. The study showed that fire safety measurements were not taken during handling and installation of EPS insulation in particular. EPS insulation was only looked at from an economical perspective which resulted in large quantities of insulation stored at the construction sites and in scaffolds prior to installation. It was concluded that handling and installation of EPS insulation was inadequate from a construction site fire safety point of view. Furthermore irregularities and lack of thoroughly made inspections of insulation of façade installations show that there are a lot of uncertainty regarding the fire safety of a façade with combustible insulation. Suggestions to limit fires in combustible insulations, increase quality of the construction of facades as well as raise awareness of fire hazards during planning and construction of buildings were made.
2

Vliv provedení zateplení bytového domu na výdaje spojené s provozem této nemovitosti / The impact of executing new thermal insulation on a apartment building on the expenses associated with its operation

Machová, Petra Unknown Date (has links)
The topic of the diploma thesis „The impact of executing new thermal insulation on a apartment building on the expenses associated with its operation “ is a draft and appraisal of four variants of thermal insulation of the building. The thesis deals with the assessment of the current proposal for apartment building envelopes along with proposing alternative plans with emphasis on reducing heating costs. The first section describes the types of buildings according to heating demand and a list of different variants of thermal insulation materials. The second part is devoted to a specific apartment building in the Ústí nad Labem for which there are designed in four variants of insulation. The work includes thermal assessment in original condition and the assessment of new condition modified by adding thermal insulation. Through research will bedetermined price of implementation of proposed insulation options together with the costs of operation of the apartment building. In conclusion, the diploma thesis evaluates the payback period of insulation.
3

Penzion / Apartment hotel

Prívara, Marek January 2013 (has links)
The subject of this thesis was to develop project documentation for building construction. It is a new four-storey house with restaurant, situated on the outskirts of the village Bridges at Jablunkova. The building is brick, has a two-level gable and shed roof, consisting of wood roof system. Slope of the parcel on which the house is located, allows the building of the plant into the ground. Because of this it is possible to enter it, either the main entrance to the first floor or building around and over the summer terrace come directly to the restaurant on the second floor. Above it are two more floors for hotel guests only, a total of 10 accommodation units with its own bathroom.

Page generated in 0.1292 seconds