• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 293
  • 1
  • Tagged with
  • 294
  • 253
  • 198
  • 183
  • 168
  • 153
  • 142
  • 138
  • 135
  • 112
  • 89
  • 71
  • 70
  • 68
  • 65
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
271

Využití a obnova průmyslových objektů u Baťova kanálu / Design and operation of the coworking space

Koňariková, Lenka January 2022 (has links)
The diploma thesis solves the new utilization and renovation of an industrial building near the Baťa canal in the village of Huštěnovice which was used as former pumping station for agricultural purposes. The aim was to find such uses that will support the development of the adjacent area and at the same time will also refer to the original usage of the building. New community centre „PŘÍLIV“ with aquaponics connects both of them and what is more, it offers modern connection of people with nature. The construction plan is solved as a complex project form architectural study, through the project for the building permit to the design of the aquaponics technology itself. Project of the community centre and aquaponics is designed as off-grid building with minimal environmental impact.
272

Obecní dům, Lhota / Municipal house, Lhota

Šenovský, Jan January 2022 (has links)
The aim of the diploma thesis is to develop the design documentation for the construction of the object of civic amenities. It is a multifunctional building, there are municipal office, library and cultural hall. It is detached building, which consists of two dilated parts, part A – Cultural hall and part B – Administration. Part A is single-storey with internal gallery accessible from the second floor of part B. Part B has a basement and three floors. Part A has external and internal reinforcing walls proposed as cast-in-place reinforced structure from fair-faced concrete. Part B is proposed as traditional masonry building made of brick blocks, the external walls in the basement are from concrete blocks of permanent formwork. The floor-structures will be made of hollow prestressed panels supplemented by reinforced cast-in-place structures. The roof structures are designed as warm flat green roofs. The facade of part A is proposed as ventilated, external wall finish is timber horizontal cladding. The facade of part B will be contact, external wall finish is made of brick facing tapes.
273

Kraví hora - rodinné stříbro VUT / Kraví hora - BUT Family silver

Davčíková, Gabriela January 2019 (has links)
The subject matter of the Master's Thesis deals with the design of the Brno University of Technology (BUT) compound on Kraví hora and comes as a follow-up to the work done in the previous academic term. The aim was to combine the interests of the city of Brno and that of the Brno University of Technology (BUT); to create a common zone which would incorporate attractive park areas for the general public and a representational space for the promotion of BUT and other activities that the university has been lacking to date. The primary objective was to make the compound more accessible to the public as there are currently community gardens which stand as a barrier. The entire BUT compound is thus integrated with the neighbourhood, providing numerous public areas that are ideal for relaxation and leisure activities where people may enjoy their free time. The new buildings will offer visitors an introduction to the history and current state of the University of Technology, mainly via exhibitions and entertainment. The faculty buildings, designed as a recruitment centre and used to present student work, will perform additional functions. The current facilities will be utilized as areas for graduates in creative disciplines who will be able to rent their first art studios there. The new buildings are set in the terrain so as not to disrupt the natural aspect of the park, seamlessly blending into the surrounding landscape. Another interesting feature is an observation tower, designed to further utilize the location's potential and provide visitors with a wide view of the area, far into its surroundings.
274

Výrobní hala v Černé Hoře - vybrané části stavebně technologického projektu / Production Hall in Černá Hora – Selected Parts of Construction-technological Project

Různar, Daniel Unknown Date (has links)
The topic of my master's thesis are selected parts of the construction technology project Production Hall in Černá Hora with administrative part. Thesis contains engineering report, construction budget, time schedule for the whole construction, deployment of mechanisms and staff, project of construction site, study of the implementation of the main technological stages, the most appropriate construction mechanisms, routes of mechanisms, ranges and travels of mechanisms, financial and time schedule of the main building, technological specification for established pilots and montages of prefabricated skeleton, control and test plan, implementation of pilots, proposals of design of movement mechanisms, comparison of cladding of ventilated facades, skeleton assembly procedure diagrams and noise study of the construction site.
275

Stavebně technologický projekt bytového domu ve Velké Bíteši / Construction technology project of the apartment building in Velká Bíteš

Sotolář, Václav Unknown Date (has links)
The subject of this final thesis is the construction technology project of an apartment building in Velká Bíteš. The thesis contains a technical reports, construction technology study, coordination situation, time schedule and financial plan of the building in the structure of individual construction object, time schedule of the main building, solution of transport routes, technological regulation for the ventilated facade, control and test plan of the ventilated facade. Furthermore, a design of the construction site equipment is prepared, including a technical report, Occupational Health and Safety on the construction site for the superstructure construction phase, budget for the superstructure construction phase and a comparison of variants of the ceiling structure. Finally, a comparison of lifting mechanisms, LEED certification and assessment of photovoltaic facades is processed.
276

Obvodní oddělení policie ČR, Brno-Černovice / Police district department of the Czech Republic, Brno-Černovice

Vaníček, Marek Unknown Date (has links)
The subject of the master thesis is design of a new detached office building for public administration of Czech Republic Police as a district department in Brno-Černovice. It is presented as a form part of project documentation for a building construction. The building has a cellar and two above-ground floors. It is founded on a strip foundation and pads. The building is roofed by green roof. There are office rooms, sanitary facilities, archives, interrogation rooms, pre-trial detention cells, garages, storage rooms and dog cages in the above-ground part. In the basement, there are technical facilities and shooting range backround. Structural system of the building is wall longitudinal masonry system from clay blocks. The ceiling structure is from cast-in-place reinforced concrete. The part of the building is with ventilated facade a nd rest is insulated with contact thermal insulation.
277

Sportovní centrum Polička / Sports centre Polička

Svoboda, Jan January 2016 (has links)
This thesis deals with the design and elaboration process of a project documentation of a sports centre. The designed sports centre building is situated in the southern part of the town of Polička, in the area determined for sports and free time activities complexes and areas. It is a two-floor, non-cellar, flat-roof building. It is based on plain concrete strip foundations and reinforced concrete foundation footing. The bearing, peripheral and partition walls are designed from POROTHERM hollow clay blocks. Reinforced concrete columns are designated in open disposition areas. The ceiling construction is made from SPIROLL pre-stressed concrete floor slabs and point-supported reinforced concrete slabs. The peripheral walls of the first aboveground floor are insulated with external thermal insulation system with a protective gabion facade. The peripheral wall thermal insulation in a bowling restaurant and gym halls extension is designed from a ventilated facade with CEMBRIT METRO facade cladding panels. The building is functionally divided into two main parts with a shared entrance. The sports centre with gyms and other sports facilities form the first part. Three squash courts, a mini-football piste, a special room for spinning and alpinning, a room for group exercising and cloakrooms with sanitary facilities are designed within one part of the sports centre. A restaurant with a bowling area and a kitchen with storerooms and other facilities for employees form the second part. The designed complex is barrier-free. There is aimed to be a car park for fifty cars, four motorbikes and a bus in front of the building. Three parking places are for disabled people.
278

Fitness a Wellness centrum / Fitness and Wellness center

Pospíchal, Pavel January 2018 (has links)
The diploma thesis is about design and project documentation of fitness and wellness center. The designed object is situated in the outskirts of Havlíčkův Brod in a quiet environment and with direct connection to the city dam. The object is a three-storey partially-basement building with a flat green roof in three levels. The building is based on the base passages of plain concrete, reinforced concrete slabs and beads. The supporting, peripheral and partition walls are designed from the VELOX system. The outer casing consists of cement slab, reinforced concrete core and thermal insulation. In open-plan areas there are designed reinforced concrete columns. The ceiling structure is predominantly designed from reinforced concrete slabs to lost formwork. Part of the facade is plastered, the other part is ventilated. Individual architectural elements divide the object into units and fit into the natural landscape. The object is divided into several tracts where each has its own purpose and specification. In the 1st floor there is a gym, room for trainers and coordinating training room. In the center there is atrium, reception, cloakroom, buffet and public toilets. Vertical communication is possible using a suspended staircase or a hydraulic lift. On the 1st underground floor there is a reception desk and cloakroom for disabled people. In the western part of the tract there is an indoor pool with whirlpool, of course there are cloakrooms divided for men and women. The eastern part of the tract is used as a technical room of air-conditioning, there are also 3 saunas, including a relaxation room and dressing room. All facilities on the 1st underground floor have access to an outdoor park, including a dam and outdoor whirlpools. In the 2nd floor there is a staffing facility, an area for manegement, technical rooms and an outdoor green terrace. The designed object is designed for disabled people. Around the object there is designed a car park for 33 cars.
279

Sportovní centrum Hodonín / Sports centre Hodonín

Svatek, Michal January 2018 (has links)
The content of this thesis is elaboration of technical documentation for realization of a sports centre. The building is situated in Hodonín in flattened terrain. It is a building with two floors, non-cellar, flat vegetation roof and sloping roof of the wooden glued laminated trusses. The building is based on plain concrete strip foundations and concrete foundations footing. Both peripheral and internal walls are made of ceramic blocks Porotherm. In open spaces, reinforced concrete columns are designed. The ceiling structure is designed from pre-stressed Spiroll ceiling panels. The peripheral walls are insulated with the ETICS external thermal insulation system in the western part of the building. On the rest of the building there is a ventilated facade with a cladding made of wood and Cetris tiles. The building is functionally divided into two parts with a common entrance. On the north and south side there are sports grounds. The rest consists of a restaurant, a kitchen with facilities, a hygienic background for employees and visitors. The whole building is barrier-free.
280

Kraví hora - rodinné stříbro VUT / Kraví hora - BUT Family silver

Peštálová, Lucie Unknown Date (has links)
The subject of the diploma thesis is to design a project study and a building program that would become a compromise between the requirements of the city of Brno and BUT in the area of Kraví hora in the Brno city center. The city of Brno would like to transform the area into a public park. But BUT considers it as its "family silver" because they realize its extraordinary value. Options of a constructions are really limited because of many area regulations. My proposal counts on the demolition of all existing buildings in the area, respects property area relations , protection zone, continuity with existing traffic roads, height regulation, imaginary raster of surrounding buildings, slope of terrain and orientation to the cardinal points. My suggest represents a study of five groups of objects which creating a rectangular raster. As a compromise solution, I chose the presentation and promotional areas of the individual faculties of BUT for the content of the buildings. Faculties have spaces for hobby groups for the public comprise all age groups included. I also designed the BUT Museum of History, a multimedia hall, a cafeteria, studios, a student leisure center and an observation tower with a climbing wall.

Page generated in 0.0525 seconds