• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • Tagged with
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Digital secondary substations with auto-configuration of station monitoring through IEC 61850 and CIM

Wistedt, Johan January 2018 (has links)
This thesis explore the possibility to automate a process for configuration of secondary substations monitoring and control. By using a network information system (NIS), information of secondary substations can be extracted, such as feeder naming, primary equipment type, rating and model. From this information an automated process of configuring the secondary substation is possible, which open up the possibility to cost-efficiently digitalise the distribution grid. In the project, the standard IEC 61850 for configuration of communications of intelligent electrical devices was used to automate and standardize the process. The process starts with a extracted IEC 61970 CIM file from the NIS. The IEC 61970 CIM file is converted into a IEC 61850 SCL file through an system engineering tool. The configuration is based of information from the NIS, where the models and types of the equipments decides what type of functionality that is needed for the secondary substation. With help of the created SCL file hardware and human-machine interface (HMI) was configured, creating a full functional system for the secondary substation monitoring and control equipment. The usage of 400V capable input module together with bus couplers, configured in IEC 61850, lowers the configuration needed for the hardware. The usage of SCL files also helps automate the creation of HMI for the secondary substation through IEC 61850 based tools in SCADA software. Creating views of both single-line diagrams as well as digital representation of the secondary substation outgoing feeders with measured values on display. The result of the project helps show NIS information is sufficient and standards mature enough to allow an almost fully automated system. Lowering the total time spent on each stations configuration to around two hours. Leading the way for future development of automating software for configurations of the secondary substations.

Page generated in 0.129 seconds