Spelling suggestions: "subject:"kablagemontage"" "subject:"ablagemuster""
1 |
Konstruktion och design av arbetsplats - för kablagemontörJosefin, Aronsson January 2008 (has links)
<p>This degree project has been performed with Mega Teknik AB in Landskrona. The project has resulted in a workplace for the cable installers of Mega Teknik. The workplace contains a workbench and a cart.</p><p>The first stage in this project was to make an analysis of the current workplace to identify the needs the installers had.</p><p>The different principle construction proposals of how the workbench would look like and which functions it would have was made during brainstorming, in groups and alone. These proposals were compared against each other using a functional analysis that has been put up to get the principle construction that fulfilled most points in this analysis.</p><p>The proposal chose for further work was a cart and a bench with a module intends, the table got a formulation that creates a better reach for the installers.</p><p>This proposal was generated in Catia V5 to get a better overview of the suggested proposal.</p><p>During the primary structure phase drawings over all the products were made and the components were chosen. </p><p>Calculations were made and the product got the dimension required. </p><p>The final step was to build a full scaled model. The cart was sent to a company and the other parts were made in the university’s workshop by the student with help from others when needed. </p><p>The chosen components were bought and installed. </p><p>The project resulted in a fully functioning prototype and a complete series of drawings in order to produce the workplace.</p><p>In the conclusion discussion about future work and pros and cons with the chosen product were made.</p>
|
2 |
Konstruktion och design av arbetsplats - för kablagemontörJosefin, Aronsson January 2008 (has links)
This degree project has been performed with Mega Teknik AB in Landskrona. The project has resulted in a workplace for the cable installers of Mega Teknik. The workplace contains a workbench and a cart. The first stage in this project was to make an analysis of the current workplace to identify the needs the installers had. The different principle construction proposals of how the workbench would look like and which functions it would have was made during brainstorming, in groups and alone. These proposals were compared against each other using a functional analysis that has been put up to get the principle construction that fulfilled most points in this analysis. The proposal chose for further work was a cart and a bench with a module intends, the table got a formulation that creates a better reach for the installers. This proposal was generated in Catia V5 to get a better overview of the suggested proposal. During the primary structure phase drawings over all the products were made and the components were chosen. Calculations were made and the product got the dimension required. The final step was to build a full scaled model. The cart was sent to a company and the other parts were made in the university’s workshop by the student with help from others when needed. The chosen components were bought and installed. The project resulted in a fully functioning prototype and a complete series of drawings in order to produce the workplace. In the conclusion discussion about future work and pros and cons with the chosen product were made.
|
Page generated in 0.252 seconds