• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 39
  • Tagged with
  • 39
  • 29
  • 27
  • 25
  • 24
  • 24
  • 23
  • 22
  • 22
  • 19
  • 17
  • 17
  • 14
  • 14
  • 14
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
21

Modernizace trati Brno – Přerov v okolí Vyškova pro rychlost 200 km/h / Modernization of Brno - Přerov railway line in Vyškov area for speed 200 km/h

Hašek, Jan January 2013 (has links)
The objective of this master´s thesis is a design of modernization of railway line no. 300 Brno – Přerov in Vyškov area and its vicinity for speed 200 km/h. The track section is located between railway station Luleč and Ivanovice na Hané. The track is designed in two variants. The first variant is proposed keeping railway line through Vyškov railway station including necessary modification of the railway station. The second variant suggests keeping track outside Vyškov and a connection with the railway station by bridging is designed.
22

Vyhodnocení geometrických parametrů koleje s podpražcovými podložkami / Assessment of Geometry Parameters of Track with Under Sleeper Pads

Škovranová, Michaela January 2013 (has links)
The diploma thesis applies to under sleeper pads. It researches thein using and benefits in foreign railvway authorities. Further it assesses track geometrical parameters in the trial track section with under sleeper pads in track Havlíčkův Brod - Okrouhlice and in the railway station Planá nad Lužnicí. There were evaluated measurements of vertical alingnment rails by precise leveling and deviations of track geometrical parameters measured by track meusuring car in the diploma thesis.There is expressed an conclusion about the impact of under sleeper pads on track geometric data in the thesis.
23

Rekonstrukce železniční stanice Trutnov hl.n / Upgrading of Trutnov hl.n. Railway Station

Král, Vladimír January 2015 (has links)
The aim of the diploma thesis is a design of the reconstruction railway station Trutnov main station for compliance with current operations and especially with regard to persons with reduced mobility. So it was necessary to design the platform edge with a height of 550 mm above rail level. The design also deals with the drainage of reconstructed tracks and sidings connection.
24

Návrh modernizace železniční stanice Valašské Meziříčí / Design of modernization of Valašské Meziříčí Railway Station

Málek, Jiří January 2016 (has links)
The theme of this thesis is to design modernization of Valašské Meziříčí Railway Station. This thesis includes reconstruction of both station heads and the design of the platforms for the safe movement of persons with reduced mobility with seven platform edges in total. The thesis deals with the construction of the railway superstructure and substructure, including drainage.
25

Rekonstrukce železniční stanice Nedvědice / Upgrading of Nedvědice Railway Station

Rous, Petr January 2016 (has links)
The aim of the thesis is a reconstruction of Nedvědice railway station. The thesis contains modification of track geometry parameters of the railway, reconstruction of the railway superstructure and railway substructure. Platform with the platform edge height of 550 millimetres above the top of rail was designed. Design of a railway crossings according to valid regulations is other part of thesis. The thesis also include drainage system renovation.
26

Rekonstrukce železniční stanice Svitavy / Reconstruction of Railway Station Svitavy

Marek, Josef January 2022 (has links)
The goal of this thesis was to design the reconstruction of the railway station Svitavy. The line speed was rised from the current value to 160 km·h-1. New platforms were designed, therefore the railway substructure and the drainage were adjusted accordingly. Also, the effective length of the main tracks was extended to 740 m.
27

Studie rekonstrukce žst. Letovice / Study of the Letovice railway station upgrading

Dorko, Patrik January 2018 (has links)
The subject of the master’s thesis is to design a reconstruction of the Letovice railway station for access for persons with reduced mobility and orientation. The thesis deals with adjustment to the railway superstructure, substructure and drainage system of the station. Part of the thesis is explore the possibility of building a new railway stop.
28

Bezstyková kolej v obloucích malých poloměrů / Continuous welded rail in tight curves

Peřinová, Kateřina January 2018 (has links)
The diploma thesis deals with the curve radius influence on lateral stability of continuous welded rail. It is presented the overview of present state of knowledge in the field of stability of continuous welded rail. In practical part is created the model of a track section. The influence of some parameters on loss of stability of CWR was studied. The results it are compare with the analytic analysis.
29

Třetí kolej v úseku Blansko - Rájec-Jestřebí / The Third Track in Track Section Blansko - Rájec-Jestřebí

Šíp, Radek January 2019 (has links)
The task of the thesis is to propose the third track in track section Blansko - Rájec-Jestřebí and increasing line speed with maximum use of existing track body and grounds of SŽDC, s.o. Next is the design of the reconstruction of all engineering objects (bridges, runoffs, railway crossings and platforms). Additioning of the third track will cause extensive structural modifications at railway stations Blansko and Rájec-Jestřebí. Within the building will be verified construction of new railway stop Spešov.
30

Studie rekonstrukce železničních stanic Jindřichov na Moravě a Branná / Upgrading of Jindřichov na Moravě and Branná Railway Stations

Kubina, Jiří January 2014 (has links)
The master thesis "Upgrading of Jindřichov na Moravě and Branná Railway Stations" deals with designing new platforms that are suitable for people with reduced mobility in accordance with applicable laws and standards. Platforms with the platform edge height of 550 millimetres above the top of rail were designed. The speed limit was increased from the original 40 km/h up to 50 km/h. Moreover, the thesis design reconstruction of railway superstructure and railway substructure and deal with the drainage system.

Page generated in 0.0291 seconds