• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 81
  • 3
  • Tagged with
  • 82
  • 40
  • 34
  • 34
  • 28
  • 28
  • 26
  • 23
  • 23
  • 16
  • 13
  • 12
  • 12
  • 11
  • 9
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
61

Decomposed network and heuristic approach for rail transport crew scheduling system /

Chan, Cheuk-ho. January 1997 (has links)
Thesis (M. Phil.)--University of Hong Kong, 1997. / Includes bibliographical references (leaf 91-95).
62

Feasibility study for a food court in a Kowloon office and commercial complex /

Hoe, York Joo. January 1995 (has links)
Thesis (M.B.A.)--University of Hong Kong, 1995. / Includes bibliographical references (leaves 63-64).
63

Urban planning for equal opportunity for the blind in Hong Kong : a case study of transportation facilities planning in public mass transits /

Tsang, Chiu-chun, Leo. January 1997 (has links)
Thesis (M. Sc.)--University of Hong Kong, 1997. / Includes bibliographical references (leaf 183-202).
64

Decomposed network and heuristic approach for rail transport crew scheduling system

Chan, Cheuk-ho. January 1997 (has links)
Thesis (M.Phil.)--University of Hong Kong, 1997. / Includes bibliographical references (leaf 91-95) Also available in print.
65

Redevelopment of Kowloon Tong station

Siu, Kit-yee, Catherine. January 1996 (has links)
Thesis (M.Arch.)--University of Hong Kong, 1996. / Includes bibliographical references. Also available in print.
66

Factory for the blind

Tse, Cheuk-yin, Samuel., 謝卓然. January 2002 (has links)
published_or_final_version / Architecture / Master / Master of Architecture
67

West Kowloon ferry terminal

尹國富, Wan, Kwok-fu, Colin. January 1994 (has links)
published_or_final_version / Architecture / Master / Master of Architecture
68

Incident management in the mass transit railway

Tang, Chi-chung., 鄧志翀. January 2007 (has links)
published_or_final_version / abstract / Transport Policy and Planning / Master / Master of Arts in Transport Policy and Planning
69

Project planning systems of air and rail cargo terminals.

January 1990 (has links)
by Chiu Wing-cheong, Lui Shu-tim. / Thesis (M.B.A.)--Chinese University of Hong Kong, 1990. / Bibliography: leaves 68-69. / ABSTRACT --- p.ii / TABLE OF CONTENTS --- p.iv / LIST OF ILLUSTRATIONS --- p.vi / LIST OF TABLES --- p.vii / ACKNOWLEDGEMENTS --- p.viii / Chapter / Chapter I. --- INTRODUCTION --- p.1 / Growth of Freight Industry --- p.1 / Objectives of the Project --- p.2 / Hong Kong Air Cargo Terminals Limited --- p.3 / Kowloon-Canton Railway Corporation --- p.4 / Impact of Changes in China --- p.8 / Chapter II. --- PROJECT PLANNING MODELS --- p.11 / Management of Project --- p.11 / Project Life Cycle Model --- p.12 / Project Management Functions --- p.15 / Input-Output System Model --- p.16 / Chapter III. --- RESEARCH METHODS --- p.20 / Chapter IV. --- PROJECT PLANNING SYSTEMS --- p.22 / Definition and Classification of Projects --- p.22 / Project Conception and Budgeting --- p.24 / Organising for Project Planning --- p.27 / Procedures for Project Approval and Authorisation --- p.35 / Implementation and Control of Authorised Projects --- p.39 / Applicability of Theory and Model --- p.42 / Chapter V. --- EVALUATION OF THE TWO PROJECT PLANNING SYSTEMS --- p.50 / Strengths and Weaknesses --- p.50 / Internal and External Limitations --- p.53 / Chapter VI. --- CONCLUSION AND RECOMMENDATION --- p.58 / Hong Kong Air Cargo Terminals Limited --- p.58 / Kowloon-Canton Railway Corporation --- p.60 / Overall Conclusion --- p.63 / APPENDIX --- p.64 / BIBLIOGRAPHY --- p.68
70

Railway development and colonial governance in Hong Kong since the 1960s. / 一九六零年代起香港的鐡路發展與殖民管治 / Yi jiu liu ling nian dai qi Xianggang de tie lu fa zhan yu zhi min guan zhi

January 2009 (has links)
Leung, Yan Cheong. / Thesis (M.Phil.)--Chinese University of Hong Kong, 2009. / Includes bibliographical references (leaves 150-159). / Abstract also in Chinese. / Chapter Chapter 1: --- Introduction --- p.1 / Chapter ■ --- Research Objectives --- p.3 / Chapter ■ --- Literature Review --- p.5 / Chapter ■ --- Use of Primary Sources --- p.9 / Chapter ■ --- Structure --- p.11 / Chapter Chapter 2: --- Governing Objectives behind the Railway Developments --- p.13 / Chapter ■ --- Initial Motives --- p.13 / Chapter ■ --- Political Objectives and Financial Concerns as the Determinative Factors --- p.22 / Chapter ■ --- Railway Developments since the 1970s --- p.33 / Chapter ■ --- Changing Meanings of Success in Railway Development --- p.35 / Chapter ■ --- Summary of Chapter 2 --- p.35 / Chapter Chapter 3: --- Hong Kong-London Relations and the MTR Development (I): Bilateral Negotiation and the Decisions on the MTR --- p.37 / Chapter ■ --- Nature of London-Hong Kong Relations after the WWII --- p.37 / Chapter ■ --- The Contract Approaches --- p.40 / Chapter ■ --- The Process of Bilateral Negotiation --- p.42 / Chapter ■ --- Hong Kong Government´ةs Strategy --- p.43 / Chapter ■ --- London´ةs Strategy --- p.46 / Chapter ■ --- Summary of Chapter 3 --- p.53 / Chapter Chapter 4: --- Hong Kong-London Relations and the MTR Development (II): Negotiation Breakdown and Its Impacts --- p.55 / Chapter ■ --- The Negotiation Breakdown --- p.55 / Chapter ■ --- The Adoption of Multi-contract Approach: a Contingency Plan --- p.59 / Chapter ■ --- Collaborate with London --- p.64 / Chapter ■ --- Summary of Chapter 4 --- p.68 / Chapter Chapter 5: --- Colonial Governance and Major Decisions on the MTR in the 1970s --- p.70 / Chapter ■ --- The Establishment of MTRC --- p.70 / Chapter ■ --- Optimizing the Project --- p.75 / Chapter ■ --- Civil Protests and Crises Management --- p.83 / Chapter ■ --- Summary of Chapter 5 --- p.91 / Chapter Chapter 6: --- A Review on the Modernization of Kowloon-Canton Railway --- p.93 / Chapter ■ --- KCR´ةs Operational Problems before the Modernization --- p.93 / Chapter ■ --- Evolution of KCR Modernization Programme --- p.100 / Chapter ■ --- Bureaucratic and Administrative Concerns behind the Establishment of KCRC --- p.108 / Chapter ■ --- KCRC´ةs Service Provision and Corporate Strategy --- p.111 / Chapter ■ --- Summary of Chapter 6 --- p.115 / Chapter Chapter 7: --- "Railway Development, Transport Policy and the Competitions among Public transport Operators" --- p.118 / Chapter ■ --- Transformation of the Transport Industry in the 1970s --- p.118 / Chapter ■ --- The Changing Role of Railways in the Transport System --- p.121 / Chapter ■ --- Rivalries between the Railways and Other Transport Operators --- p.129 / Chapter ■ --- Summary of Chapter 7 --- p.138 / Chapter Chapter 8: --- Conclusion --- p.140 / Chapter ■ --- Hong Kong-London Relations and Decisions on Railway Developments --- p.141 / Chapter ■ --- Governing Concerns and the Railway Development --- p.144 / Chapter ■ --- Further Studies --- p.148 / Bibliography --- p.150

Page generated in 0.0223 seconds