Spelling suggestions: "subject:"balloon""
61 |
Decomposed network and heuristic approach for rail transport crew scheduling system /Chan, Cheuk-ho. January 1997 (has links)
Thesis (M. Phil.)--University of Hong Kong, 1997. / Includes bibliographical references (leaf 91-95).
|
62 |
Feasibility study for a food court in a Kowloon office and commercial complex /Hoe, York Joo. January 1995 (has links)
Thesis (M.B.A.)--University of Hong Kong, 1995. / Includes bibliographical references (leaves 63-64).
|
63 |
Urban planning for equal opportunity for the blind in Hong Kong : a case study of transportation facilities planning in public mass transits /Tsang, Chiu-chun, Leo. January 1997 (has links)
Thesis (M. Sc.)--University of Hong Kong, 1997. / Includes bibliographical references (leaf 183-202).
|
64 |
Decomposed network and heuristic approach for rail transport crew scheduling systemChan, Cheuk-ho. January 1997 (has links)
Thesis (M.Phil.)--University of Hong Kong, 1997. / Includes bibliographical references (leaf 91-95) Also available in print.
|
65 |
Redevelopment of Kowloon Tong stationSiu, Kit-yee, Catherine. January 1996 (has links)
Thesis (M.Arch.)--University of Hong Kong, 1996. / Includes bibliographical references. Also available in print.
|
66 |
Factory for the blindTse, Cheuk-yin, Samuel., 謝卓然. January 2002 (has links)
published_or_final_version / Architecture / Master / Master of Architecture
|
67 |
West Kowloon ferry terminal尹國富, Wan, Kwok-fu, Colin. January 1994 (has links)
published_or_final_version / Architecture / Master / Master of Architecture
|
68 |
Incident management in the mass transit railwayTang, Chi-chung., 鄧志翀. January 2007 (has links)
published_or_final_version / abstract / Transport Policy and Planning / Master / Master of Arts in Transport Policy and Planning
|
69 |
Project planning systems of air and rail cargo terminals.January 1990 (has links)
by Chiu Wing-cheong, Lui Shu-tim. / Thesis (M.B.A.)--Chinese University of Hong Kong, 1990. / Bibliography: leaves 68-69. / ABSTRACT --- p.ii / TABLE OF CONTENTS --- p.iv / LIST OF ILLUSTRATIONS --- p.vi / LIST OF TABLES --- p.vii / ACKNOWLEDGEMENTS --- p.viii / Chapter / Chapter I. --- INTRODUCTION --- p.1 / Growth of Freight Industry --- p.1 / Objectives of the Project --- p.2 / Hong Kong Air Cargo Terminals Limited --- p.3 / Kowloon-Canton Railway Corporation --- p.4 / Impact of Changes in China --- p.8 / Chapter II. --- PROJECT PLANNING MODELS --- p.11 / Management of Project --- p.11 / Project Life Cycle Model --- p.12 / Project Management Functions --- p.15 / Input-Output System Model --- p.16 / Chapter III. --- RESEARCH METHODS --- p.20 / Chapter IV. --- PROJECT PLANNING SYSTEMS --- p.22 / Definition and Classification of Projects --- p.22 / Project Conception and Budgeting --- p.24 / Organising for Project Planning --- p.27 / Procedures for Project Approval and Authorisation --- p.35 / Implementation and Control of Authorised Projects --- p.39 / Applicability of Theory and Model --- p.42 / Chapter V. --- EVALUATION OF THE TWO PROJECT PLANNING SYSTEMS --- p.50 / Strengths and Weaknesses --- p.50 / Internal and External Limitations --- p.53 / Chapter VI. --- CONCLUSION AND RECOMMENDATION --- p.58 / Hong Kong Air Cargo Terminals Limited --- p.58 / Kowloon-Canton Railway Corporation --- p.60 / Overall Conclusion --- p.63 / APPENDIX --- p.64 / BIBLIOGRAPHY --- p.68
|
70 |
Railway development and colonial governance in Hong Kong since the 1960s. / 一九六零年代起香港的鐡路發展與殖民管治 / Yi jiu liu ling nian dai qi Xianggang de tie lu fa zhan yu zhi min guan zhiJanuary 2009 (has links)
Leung, Yan Cheong. / Thesis (M.Phil.)--Chinese University of Hong Kong, 2009. / Includes bibliographical references (leaves 150-159). / Abstract also in Chinese. / Chapter Chapter 1: --- Introduction --- p.1 / Chapter ■ --- Research Objectives --- p.3 / Chapter ■ --- Literature Review --- p.5 / Chapter ■ --- Use of Primary Sources --- p.9 / Chapter ■ --- Structure --- p.11 / Chapter Chapter 2: --- Governing Objectives behind the Railway Developments --- p.13 / Chapter ■ --- Initial Motives --- p.13 / Chapter ■ --- Political Objectives and Financial Concerns as the Determinative Factors --- p.22 / Chapter ■ --- Railway Developments since the 1970s --- p.33 / Chapter ■ --- Changing Meanings of Success in Railway Development --- p.35 / Chapter ■ --- Summary of Chapter 2 --- p.35 / Chapter Chapter 3: --- Hong Kong-London Relations and the MTR Development (I): Bilateral Negotiation and the Decisions on the MTR --- p.37 / Chapter ■ --- Nature of London-Hong Kong Relations after the WWII --- p.37 / Chapter ■ --- The Contract Approaches --- p.40 / Chapter ■ --- The Process of Bilateral Negotiation --- p.42 / Chapter ■ --- Hong Kong Government´ةs Strategy --- p.43 / Chapter ■ --- London´ةs Strategy --- p.46 / Chapter ■ --- Summary of Chapter 3 --- p.53 / Chapter Chapter 4: --- Hong Kong-London Relations and the MTR Development (II): Negotiation Breakdown and Its Impacts --- p.55 / Chapter ■ --- The Negotiation Breakdown --- p.55 / Chapter ■ --- The Adoption of Multi-contract Approach: a Contingency Plan --- p.59 / Chapter ■ --- Collaborate with London --- p.64 / Chapter ■ --- Summary of Chapter 4 --- p.68 / Chapter Chapter 5: --- Colonial Governance and Major Decisions on the MTR in the 1970s --- p.70 / Chapter ■ --- The Establishment of MTRC --- p.70 / Chapter ■ --- Optimizing the Project --- p.75 / Chapter ■ --- Civil Protests and Crises Management --- p.83 / Chapter ■ --- Summary of Chapter 5 --- p.91 / Chapter Chapter 6: --- A Review on the Modernization of Kowloon-Canton Railway --- p.93 / Chapter ■ --- KCR´ةs Operational Problems before the Modernization --- p.93 / Chapter ■ --- Evolution of KCR Modernization Programme --- p.100 / Chapter ■ --- Bureaucratic and Administrative Concerns behind the Establishment of KCRC --- p.108 / Chapter ■ --- KCRC´ةs Service Provision and Corporate Strategy --- p.111 / Chapter ■ --- Summary of Chapter 6 --- p.115 / Chapter Chapter 7: --- "Railway Development, Transport Policy and the Competitions among Public transport Operators" --- p.118 / Chapter ■ --- Transformation of the Transport Industry in the 1970s --- p.118 / Chapter ■ --- The Changing Role of Railways in the Transport System --- p.121 / Chapter ■ --- Rivalries between the Railways and Other Transport Operators --- p.129 / Chapter ■ --- Summary of Chapter 7 --- p.138 / Chapter Chapter 8: --- Conclusion --- p.140 / Chapter ■ --- Hong Kong-London Relations and Decisions on Railway Developments --- p.141 / Chapter ■ --- Governing Concerns and the Railway Development --- p.144 / Chapter ■ --- Further Studies --- p.148 / Bibliography --- p.150
|
Page generated in 0.0223 seconds