• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1069
  • 816
  • 560
  • 227
  • 227
  • 32
  • 30
  • 22
  • 14
  • 13
  • 10
  • 9
  • 6
  • 6
  • 5
  • Tagged with
  • 3280
  • 914
  • 802
  • 732
  • 685
  • 393
  • 359
  • 338
  • 308
  • 308
  • 307
  • 272
  • 264
  • 229
  • 215
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
231

Value in lean product development

Siyam, Ghadir Ibrahim January 2014 (has links)
No description available.
232

A study of a collaborative framework arrangement for highways renewals schemes

Ansell, Mary January 2009 (has links)
In 2001, the Highways Agency (HA) published a procurement strategy in response to a succession of studies during the 1990s, including Sir Michael Latham's "Constructing the Team" report, Sir John Egan's "Rethinking Construction" report, and the National Audit Office report "Modernising Construction". The strategy covers the full range of the HA's activities, with a focus on its delivery of services to road users as the operator of England's motorway and trunk road network, valued at £60 billion. In this respect, the HA's work is broadly divided into categories based on cost, namely maintenance contracts, regional projects and major projects. Within the regional projects category for works valued between £500k and £5 million, works are packaged together and procured through frameworks, allowing longterm relationships with delivery teams as a means of providing best value. To further promote this, the HA has embarked on a new initiative in Areas 9 and 10 of entering into direct contractual arrangements with specialist trade contractors and suppliers to form the Construction Management Framework (CMF). The contract commenced in July 2002 for a four year term, with an option, year on year, to extend to seven years, and covers the delivery of road renewals, structures renewals and improvement schemes. In addition, lean thinking has been identified as a means of providing improvement, and a lean construction trial has been planned on a road renewals project in Area 9, with the opportunity for developing lean as best practice within the CMF. The research aims to assess the performance of the CMF in highways renewals schemes. There are two objectives of the research: to assess the delivery of best value in highways renewals and improvements schemes using construction management, in particular through the establishment of a framework community; and to demonstrate how lean thinking can be used to provide continuous improvement within the framework community arrangement. The research methods used have included: questionnaires; surveys; longitudinal and crossAbstract iii sectional data comparison; and case studies. The main outputs of the research are: the development of a measurement agenda to address the value definitions defined in the research; the development of a lean procedure to be used in the CMF based on the outcomes of the lean trial; and recommendations for improving the CMF. The research has contributed to knowledge by providing a practical application of a collaborative framework arrangement, and identifying its strengths and weaknesses as a working model in the highways renewals and maintenance sector. It contributes to theory by providing a practical framework for initiatives, including lean thinking; for industry, it identifies implementation of those initiatives, and suggests improvements to overcome barriers to establishing and operating collaborative frameworks.
233

La Filosofía Lean Construction y su incidencia en la productividad de la mano de obra de una empresa constructora de Lima Metropolitana caso: “Constructora y Desarrollo C&F S.A.C.”

Villarreal Galvez, Sergio January 2017 (has links)
Determinar la incidencia de la Filosofía Lean Construction en la productividad de la MO de una empresa constructora de Lima Metropolitana. Determine the impact of the Lean Construction Philosophy on the productivity of the OM of a construction company in Metropolitan Lima.
234

O Lean na produção de quadros de comunicação visual na Bi-silque-Produtos de Comunicação Visual S.A.

Fernandes, Lucia Daniela Gonçalves January 2012 (has links)
Estágio realizado na Bi-silque S.A., e orientado pelo Eng. Abel Maia / Tese de Mestrado Integrado. Engenharia Industrial e Gestão. Faculdade de Engenharia. Universidade do Porto. 2012
235

Redução do custo industrial na Frulact S.A.

Leite, Manuel José Morais Marinho January 2012 (has links)
Tese de mestrado integrado. Engenharia Mecânica. Faculdade de Engenharia. Universidade do Porto. 2012
236

Lean transformation : linha de enchimento de aerossóis A1 na ColepCCL

Pereira, Isabel Maria Martins da Rocha de Sousa January 2008 (has links)
Estágio realizado na ColepCCL e orientado pelo Eng.º José Paulo Paiva / Tese de mestrado integrado. Engenharia Industrial e Gestão. Faculdade de Engenharia. Universidade do Porto. 2008
237

Parametrização de um ERP para implementação Lean na produção

Fonseca, Carlos Manuel de Araújo Abreu da January 2011 (has links)
Tese de mestrado integrado. Engenharia Mecânica. Faculdade de Engenharia. Universidade do Porto. 2010
238

Estudo e implementação de Lean Manufacturing em PMEs

Barros, Luís Miguel Maciel da Silva Araújo January 2010 (has links)
Estágio realizado na XC Consultores e orientado pelo Eng.º António Cruz / Tese de mestrado integrado. Engenharia Mecânica. Faculdade de Engenharia. Universidade do Porto. 2010
239

Desenho de fábricas Lean no Kaizen Institute Consulting Group

Godinho, Luís Henrique de Moreira Magalhães e Lencastre January 2010 (has links)
Estágio realizado na empresa Kaizen Institute e orientado pelo Eng.º Tiago Sanchez / Tese de mestrado integrado. Engenharia Industrial e Gestão. Faculdade de Engenharia. Universidade do Porto. 2010
240

Armazém de expedição : diagnóstico e outsourcing

Barbosa, João Pedro Loureiro January 2009 (has links)
Estágio realizado na Distebe, S.A. e orientado pelo Eng.º Rui Oliveira / Tese de mestrado integrado. Engenharia Industrial e Gestão. Faculdade de Engenharia. Universidade do Porto. 2009

Page generated in 0.0491 seconds