Spelling suggestions: "subject:"los costs""
1 |
Sensitivity and Uncertainty Analysis of Expected Loss Costs in Hurricane ModelsHudson, Antonio R 18 June 2012 (has links)
The Public Hurricane Model developed at FIU by a team of scientists has to be certified by the Florida Commission on Hurricane Loss Projection Methodology. The commission ensures that all hurricane loss models meet certain standards, as models are used extensively by regulators and insurance firms to produce inputs used in the homeowner insurance rate making process. The focus of this thesis is to conduct sensitivity and uncertainty analysis through the calculation of standardized regression coefficients and expected percentage reductions in expected loss costs in order to meet the commission standards.
The commission approved the model after very extensive and rigorous review by a panel of experts. The results generated for sensitivity and uncertainty, form S-6, showed the importance of the Holland B parameter regardless of hurricane category, with the radius of maximum winds increasing in importance for stronger hurricanes.
|
2 |
Možnosti snížení nákladů za energie pro RD / Possible decrease of energy consumption in residencePalkovič, Peter January 2015 (has links)
Thesis deals with the possibility of reducing the energy costs of a typical family house located in Brno. In the first part is a detailed calculation of heat loss of the building, considering heat gain and subsequent quantification of costs for heating, hot water and total annual costs. In other sections provide specific calculation of the economics for the partial implementations of planned procedures leading to a reduction in heating costs (replacing windows, doors, facades and floor ceiling). A calculation for changing the heating method and compared to the existing boiler. A possible reduction in the energy required when using energy from the Sun. In the penultimate section briefly review the options for what you get a subsidy from the grant program "New Green Savings Programme" and reduce the initial investment. Finally the comprehensive proposals of different options exchanges boiler insulation, replacing windows and doors, and the subsequent evaluation of the best solution when investing 350 000 CZK.
|
Page generated in 0.0647 seconds