• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 11
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 23
  • 23
  • 23
  • 7
  • 6
  • 6
  • 6
  • 4
  • 4
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
21

Έρευνα, σχεδιασμός και μοντελοποίηση ενός ολοκληρωμένου συστήματος ελέγχου και προγραμματισμού παραγωγής στη βάση ενός πρωτότυπου συστήματος αντίστροφου Προγραμματισμού Απαιτήσεων Υλικών (reverse MRP) / Modelling and development of an integrated production planning and control system for discrete manufacturing environments (r-MRP)

Λάλας, Χριστόδουλος 30 September 2008 (has links)
Αντικείμενο της διατριβής αποτελεί το πρόβλημα του προγραμματισμού παραγωγής και ελέγχου των αποθεμάτων των συστημάτων διακριτής παραγωγής. Στόχος της είναι να προτείνει ένα νέο σύστημα PPC (r-MRP) που θα ξεπερνά ορισμένους βασικούς περιορισμούς των MRP-based συστημάτων. Το σύστημα αυτό αναπτύχθηκε πάνω σε μία νέα μέθοδο που ενοποιεί τις λειτουργίες διαχείρισης αποθεμάτων και λεπτομερούς χρονοπρογραμματισμού σε μία ενιαία παράλληλη υπολογιστική διαδικασία (reverse MRP). Ο σχεδιασμός του προτεινόμενου συστήματος ξεπερνάει βασικές αδυναμίες των MRP-based συστημάτων, λαμβάνοντας υπόψη τους περιορισμούς δυναμικότητας των παραγωγικών πόρων, τη διακύμανση των χρόνων υστέρησης των εργασιών σε αυτούς και τις σχετικές προτεραιότητες των παραγγελιών, μέσα σε ένα περιβάλλον συνεχούς χρόνου. Επιπλέον εισάγει ένα εργαλείο αξιολόγησης και επιλογής ενός αποδοτικού συνδυασμού χρονοπρογράμματος εργοστασίου και πλάνου αποθεμάτων μέσα από ένα σύνολο διαθέσιμων και εφικτών εναλλακτικών σεναρίων. Η διαμόρφωση των εναλλακτικών αυτών σεναρίων γίνεται λαμβάνοντας κάθε φορά υπόψη τους υφιστάμενους περιορισμούς δυναμικότητας της επιχείρησης και των υλικών, καθώς και ένα σύνολο κριτηρίων, ενίοτε αλληλοσυγκρουόμενων. Τα εναλλακτικά σενάρια που σχηματίζονται αξιολογούνται μέσα από ένα σύνολο δεικτών απόδοσης τόσο χρονοπρογραμματισμού, όσο και διαχείρισης αποθεμάτων. Το προτεινόμενο σύστημα υλοποιήθηκε υπό τη μορφή πειραματικού λογισμικού, μέσα σε περιβάλλον προσομοίωσης διακριτών συμβάντων (discrete-event simulation). Η απόδοση του μελετήθηκε μέσα από την πιλοτική εφαρμογή του σε μία τυπική κλωστοϋφαντουργική μονάδα και βρέθηκε να υπερτερεί σε συγκεκριμένες περιπτώσεις της υπολογιστικής διαδικασίας ενός τυπικού συστήματος MRPII, όσον αφορά ένα σύνολο δεικτών απόδοσης χρονοπρογραμματισμού και διαχείρισης αποθεμάτων. Το προτεινόμενο σύστημα r-MRP θα μπορούσε να ενσωματωθεί σε ένα MRP-based σύστημα ως ένα διασυνδεόμενο υποσύστημα (module) υποστήριξης της λειτουργίας προγραμματισμού παραγωγής και ελέγχου αποθεμάτων. / This thesis discusses the design of a production planning and control system (PPC) for discrete manufacturing environments, referred to as r-MRP. The proposed approach operates under the framework of hierarchical finite capacity shop-floor modelling and discrete-event simulation. It overcomes some of the main deficiencies of MRP-based systems by considering capacity constraints, lead times fluctuations, lot sizing and priority control in a ‘bucket-less’ environment. The r-MRP system was developed based on a new method that integrates shop scheduling and material planning in a simultaneous computational process (reverse MRP). Under this methodology, material and capacity constraints are considered, together with a number of conflicting planning criteria, in a continuous time environment. Lead times are dynamically calculated variables, based on actual loads in each workcenter. A number of alternative feasible shop schedule and material plan combinations are formed in real time. The r-MRP system was implemented as an experimental software tool. Its performance has been evaluated in a case study of a textile company with ‘real life’ data. When studied through a set of simulation experiments it has been found to outperform standard MRPII system in cases of short production times, high value inventory items and frequent, small deliveries by suppliers, in terms of a number of scheduling and inventory performance indicators. The r-MRP tool can be incorporated in legacy IT systems as an interfaced functional module.
22

A Framework to Incorporate Industry 4.0 into SME to Enhance Resource Planning

Ganta, Sathvik January 2020 (has links)
Small and Medium-sized Enterprises (SMEs) have grown steadily in recent years.  SMEs generate 59.7 % of value-added and 65.5 % of employment in the ‘non-financial business economy’ in Sweden. It's important for the success of SMEs to be ready to provide high product availability to customers at minimal operation costs. The challenges faced by SMEs are tougher in global competition. There is a rapid growth in the industrial revolution to deal with the challenges as well as competition. This work mainly focuses on implementing resource planning (RP) and adapting to the latest technologies of Industry 4.0 into SMEs to face the challenges. But incorporating Industry 4.0 in a major struggle in the SMEs.  The thesis provides a view of Resource Planning implementation. The authors describe the resource planning implementation techniques and define the requirements for its successful implementation. Resource Planning (RP) adoption factors have been studied quite extensively over the years. However, this master thesis tries to investigate the less explored area of resource planning. Relatively a smaller amount of research has been conducted, when it comes to implementation of Industry 4.0 technologies especially in Small and Medium-sized Enterprises (SMEs).  Industry 4.0 provides new paradigms for the industrial management of SMEs. Supported by a growing number of new technologies, this concept appears more flexible and less expensive than traditional enterprise information systems. This paper presents a literature review of existing applied research covering different Industry 4.0 issues about SMEs. Furthermore, the analysis is done to understand the correlation between the identified factors of Industry 4.0 technologies. The research findings indicate that the use of IoT and Cloud computing are major advantages for resource planning in an SME. The results from the analysis are presented in a framework designed for the future adaptation of these technologies. Despite the research limitations, the findings show a high advantage. Finally, the author suggests a future scope of research.
23

Δενδρικές δομές διαχείρισης πληροφορίας και βιομηχανικές εφαρμογές / Tree structures for information management and industrial applications

Σοφοτάσιος, Δημήτριος 06 February 2008 (has links)
H διατριβή διερευνά προβλήματα αποδοτικής οργάνωσης χωροταξικών δεδομένων, προτείνει συγκεκριμένες δενδρικές δομές για τη διαχείρισή τους και, τέλος, δίνει παραδείγματα χρήσης τους σε ειδικές περιοχές εφαρμογών. Το πρώτο κεφάλαιο ασχολείται με το γεωμετρικό πρόβλημα της εύρεσης των ισo-προσανατολισμένων ορθογωνίων που περικλείουν ένα query αντικείμενο που μπορεί να είναι ένα ισο-προσανατολισμένο ορθογώνιο είτε σημείο ή κάθετο / οριζόντιο ευθύγραμμο τμήμα. Για την επίλυσή του προτείνεται μια πολυεπίπεδη δενδρική δομή που βελτιώνει τις πολυπλοκότητες των προηγούμενων καλύτερων λύσεων. Το δεύτερο κεφάλαιο εξετάζει το πρόβλημα της ανάκτησης σημείων σε πολύγωνα. H προτεινόμενη γεωμετρική δομή είναι επίσης πολυεπίπεδη και αποδοτική όταν το query πολύγωνο έχει συγκεκριμένες ιδιότητες. Το τρίτο κεφάλαιο ασχολείται με την εφαρμογή δενδρικών δομών σε δύο βιομηχανικά προβλήματα. Το πρώτο αφορά στη μείωση της πολυπλοκότητας ανίχνευσης συγκρούσεων κατά την κίνηση ενός ρομποτικού βραχίονα σε μια επίπεδη σκηνή με εμπόδια. Ο αλγόριθμος επίλυσης κάνει χρήση μιας ουράς προτεραιότητας και μιας UNION-FIND δομής ενώ αξιοποιεί γνωστές δομές και αλγόριθμους της Υπολογιστικής Γεωμετρίας όπως υπολογισμός κυρτών καλυμμάτων, έλεγχος polygon inclusion, κλπ. Το δεύτερο πρόβλημα ασχολείται με το σχεδιασμό απαιτήσεων υλικών (MRP) σε ένα βιομηχανικό σύστημα παραγωγής. Για το σκοπό αυτό αναπτύχθηκε ένας MRP επεξεργαστής που χρησιμοποιεί διασυνδεμένες λίστες και εκτελείται στην κύρια μνήμη για να είναι αποδοτικός. Το τελευταίο κεφάλαιο εξετάζει το πρόβλημα του ελέγχου της παραγωγής και συγκεκριμένα της δρομολόγησης εργασιών. Στο πλαίσιο αυτό σχεδιάστηκε και υλοποιήθηκε ένα ευφυές σύστημα δρομολόγησης σε περιβάλλον ροής που συνδυάζει γνωσιακή τεχνολογία και προσομοίωση με on-line έλεγχο προκειμένου να υποστηρίξει το διευθυντή παραγωγής στη λήψη αποφάσεων. / Τhe dissertation examines problems of efficient organization of spatial data, proposes specific tree structures for their management, and finally, gives examples of their use in specific application areas. The first chapter is about the problem of finding the iso-oriented rectangles that enclose a query object which can be an iso-oriented rectangle either a point or a vertical / horizontal line segment. A multilevel tree structure is proposed to solve the problem which improves the complexities of the best previous known solutions. The second chapter examines the problem of point retrieval on polygons. The proposed geometric structure is also multileveled and efficient when the query polygon has specific properties. The third chapter is about the application of tree structures in two manufacturing problems. The first one concerns the reduction in the complexity of collision detection as a robotic arm moves on a planar scene with obstacles. For the solution a priority queue and a UNION-FIND structure are used, whereas known data structures and algorithms of Computational Geometry such as construction of convex hulls, polygon inclusion testing, etc. are applied. The second problem is about material requirements planning (MRP) in a manufacturing production system. To this end an MRP processor was developed, which uses linked lists and runs in main memory to retain efficiency. The last chapter examines the production control problem, and more specifically the job scheduling problem. In this context, an intelligent scheduling system was designed and developed for flow shop production control which combines knowledge-based technology and simulation with on-line control in order to support the production manager in decision making.

Page generated in 0.5648 seconds