• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1323
  • 75
  • 15
  • 13
  • Tagged with
  • 1430
  • 1147
  • 489
  • 461
  • 461
  • 461
  • 461
  • 461
  • 412
  • 322
  • 302
  • 225
  • 186
  • 161
  • 141
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
271

Análisis de fallas en maquinaria minera

Gómez Hidalgo, Máximo Rodrigo January 2013 (has links)
Ingeniero Civil Electricista / La minería del cobre en Chile ha crecido sostenidamente desde los años 90 y, actualmente, a nivel nacional, es la actividad económica más importante, y a nivel internacional, lidera la producción de este metal. En este contexto, para la industria nacional del cobre es fundamental aumentar la productividad; disminuir costos; y reducir los perjuicios a las personas, al entorno, y a las unidades productivas. En consecuencia, aumentar la continuidad operacional y disminuir los costos de falla de las correas transportadoras en los procesos de conminución contribuye a conseguir las metas establecidas. Por último, a fin de alcanzar las metas relacionadas a las correas transportadoras en estos procesos es necesario estudiar sus modos de falla, con el propósito de generar medidas compensatorias como esquemas de detección y aislación temprana apropiados. El presente trabajo tiene como propósito realizar un análisis de fallas en los equipos y componentes mecánicos más importantes de las correas transportadoras CV-005, CV-006, y CV-007 de Minera Los Pelambres (transporte de mineral grueso del chancado primario a la molienda), con la finalidad de proponer esquemas de detección y aislación temprana destinados a dichos equipos y componentes (el desarrollo de medidas compensatorias se excluye de este trabajo). Particularmente en este análisis, se presentan las principales características de las correas transportadoras. En seguida, se identifican y describen los sub-sistemas de las correas transportadoras, se identifica su instrumentación, y se describen sus modos de operación normal, tanto de forma general como particular. Luego, a partir de la información entregada por CONTAC Ingenieros Ltda., se seleccionan los equipos y componentes mecánicos más importantes de las correas transportadoras escogidas, considerando la frecuencia y duración promedio de las paradas no planificadas (evento relacionado a fallas) de los sub-sistemas identificados. Posteriormente, en base a la información facilitada por Minera Los Pelambres se identifican y describen tanto los modos de falla en los equipos y componentes determinados como sus causas, efectos, y procedimientos de detección. Finalmente, a partir de este análisis y de la investigación centrada en ingeniería, se proponen esquemas de detección y aislación temprana para los modos de falla establecidos. Los esquemas de detección y aislación temprana propuestos para los equipos y componentes determinados presentan diferentes niveles de desarrollo. En el caso de los polines, generalmente se basan en la captura de termografías; pero en las correas transportadoras escogidas, este esquema de inspección es impracticable, a causa de la distribución espacial de los polines (en otros sistemas distribuidos se han usado vehículos aéreos no tripulados para este fin). En el caso de la banda, generalmente se sustentan en la captura de imágenes superficiales y de rayos X. En el caso de los motores eléctricos, se basan en la medición de vibraciones y de la corriente en el estator. En el caso de los frenos de disco, no se encontraron esquemas específicos para la liberación fallida de las pastillas de freno; pero se podrían desarrollar a partir del procesamiento digital de imágenes y, por otra parte, la pérdida de eficiencia del resorte del sistema hidráulico cuenta con medidas compensatorias a implementar por parte de la empresa. Por último, en el caso de los reductores, se sustentan en la medición de vibraciones y en el análisis de aceites. Como trabajo futuro se sugiere principalmente estudiar la (pre)factibilidad técnica y económica de los esquemas de detección y aislación temprana propuestos.
272

Evaluación de metodologías de estimación de tiempos de ciclo en Minera Escondida

Carvajal Irribarren, Diego Ignacio January 2015 (has links)
Ingeniero Civil de Minas / El presente trabajo tiene por objetivo evaluar las dos metodologías de estimación de tiempos de ciclo de transporte utilizadas en el área de Planificación Corto Plazo en Minera Escondida. La primera metodología estima los tiempos de manera estocástica, basándose en la utilización de un simulador de eventos discretos llamado MineDES. La segunda, estima los tiempos de manera determinística utilizando un software llamado MineHaul 2. Para evaluar las metodologías se modela el sistema de trasporte de Minera Escondida al mes de Septiembre de 2014 usando ambos softwares. La calibración de los modelos se lleva a cabo mediante la utilización de datos obtenidos tanto en terreno como a través de un software que reproduce la información emitida por despacho llamado Dispatch Analyser, con el cual se pueden estimar los tiempos de viaje. Una vez obtenidos los resultados de cada modelo, se realiza una evaluación del desempeño de cada software mediante la aplicación de criterios tales como la calidad del ajuste obtenido, la incorporación de congestión y colas en la estimación, dinamismo del modelo, optimización de las rutas evaluadas y el tiempo invertido para conseguir los resultados. Los resultados obtenidos se evalúan en función de los tiempos de viaje del sistema. En comparación con los datos reales de la operación, para el caso de MineDES se obtiene un error del 7.72% en los viajes cargados y un error del 10.17% en los viajes vacíos, mientras que para el caso de MineHaul 2 los errores en los viajes cargados y vacíos son 11.78% y 14.14%, respectivamente. El caso base, que es la estimación realizada por el área de Planificación Corto Plazo, entrega errores para los viajes cargados y vacíos de un 12.52% y 18.95% respectivamente. Respecto a la magnitud del error, los dos modelamientos realizados entregan un mejor ajuste que el modelo creado por Planificación Corto Plazo. De los modelos, MineDES presenta una mayor calidad de ajuste y además es el único que incorpora en su estimación la congestión y las colas. Sin embargo, MineHaul 2 tiene la ventaja de ser un software dinámico, estimar el tiempo de ciclo de la ruta óptima y ser un software mucho más rápido. Finalmente, en función de los intereses del área de Planificación Corto Plazo, los criterios que más ponderan al momento de elegir un software son el dinamismo, la optimización y el tiempo invertido en la estimación, por lo tanto, se recomienda seguir utilizando el software MineHaul 2 para la estimación de tiempos de ciclo de transporte en el área.
273

Optimización de parámetros de tronadura en función de explosivos de alta energía en sociedad contractual minera El Alba

Aguirre García, Andrés Alejandro January 2016 (has links)
Ingeniero Civil de Minas / Dentro del proceso minero, se tiene que los costos operacionales alcanzan una relevancia significativa, por lo tanto, para reducir estos costos primero se deben visualizar los procesos involucrados a ellos. Se tiene que los procesos de perforación y tronadura son las primeras operaciones unitarias que resultan del diagrama de flujos en la extracción del material, implicando que un buen comienzo podría generar mejoras en los procesos posteriores. En consecuencia, el presente trabajo busca encontrar la rentabilidad técnico-económica de aplicar explosivos de alta energía en la tronadura mediante análisis de fragmentación, análisis de pérdidas por cargas redireccionadas por fragmentación gruesa, costos y rendimiento de chancador, con el objetivo de optimizar la operación mediante la reducción de costos y granulometría con el propósito de estandarizar la tronadura en un sector particular de la minera. Se comienza con un análisis granulométrico tanto de propuestas simuladas como de pruebas en terreno mediante los software Split Desktop y Online, luego, a las distintas pruebas se les realiza análisis técnico-económico a partir de los distintos parámetros y configuraciones impuestas en cuanto a los diseños de la malla de tronadura y carguío de la malla, y en conjunto analizar la manera en que afectan al chancado en temas energéticos. De los resultados obtenidos, se tiene que utilizando un explosivo de alta energía se logra un proceso exitoso en términos de optimización, ya que logra reducir la granulometría (P80), sin embargo, los costos del proceso de perforación y tronadura aumentan. Esto último se vé compensado en el flujo de caja, ya que se obtienen resultados más favorables en cuanto a las pérdidas por cargas redireccionadas por fragmentación gruesa las cuales se redujeron en sobremanera con la utilización del explosivo de alta energía, obteniéndose un balance global positivo en cuanto al uso de esta nueva alternativa. Estas nuevas medidas incrementan la rentabilidad del proceso total de minería, ya que se traducen en beneficios posteriores a la tronadura en sí, logrando cumplir con los objetivos impuestos en un comienzo, por lo que la utilización de explosivos de alta energía contribuye en gran manera a mejorar la fragmentación y el rendimiento del chancador, y en consecuencia hacer rentable el negocio desde una visión global.
274

Estudio de perfil para la explotación de Recursos Sur Codelco División El Teniente

Oyanader Willson, Joaquín Alfonso January 2016 (has links)
Autor no autoriza el acceso a texto completo de su documento hasta el 30/5/2021. / Ingeniero Civil de Minas / En el actual escenario de atraso de la puesta en marcha del Proyecto Nuevo Nivel Mina (PNNM), la División El Teniente se encuentra en la necesidad de evaluar diversos proyectos de contingencia que permitan mitigar el déficit de mineral que deberá enfrentar la División durante los próximos años hasta la puesta en marcha y ramp-up del PNNM Uno de los prospectos de mayor interés se encuentra al sur de la mina Esmeralda, dado que su ubicación permite explotar los recursos mediante la extensión de operaciones cercanas y a su vez a las campañas de sondajes ofrecen un 90% de reservas probadas, suficientes para realizar estudios a nivel de ingeniería de prefactibilidad. Dentro de este margen, se evalua la factibilidad técnica y económica de la explotación de Recursos Sur para así determinar la conveniencia de continuar los estudios del proyecto en etapas de ingeniería posteriores. Se recopilaron los antecedentes geológicos para identificar las reservas in situ, la litología presente, principales estructuras y el ambiente geotécnico del sector. Junto con esto se analizó la geomecánica del sector, determinándose que el proyecto se encuentra emplazado en un ambiente de esfuerzos similar al del sector de Diablo Regimiento. Utilizando como base los estándares para estudios de perfil, se analizó la explotación de los recursos mediante Rajo Abierto y Panel Caving. El resultado preliminar determinó que la explotación subterránea posee un mayor potencial económico por lo que se continuó el estudio enfocado el método subterráneo. Se generaron 4 opciones de explotación en función de la envolvente económica de las cuales, en función de su potencial técnico y económico, se eligieron 2; acoplada a Esmeralda denominada Continuidad de Bloques 4 y 5, y desacoplada explotando los recursos como un Caving Virgen. Dadas las alternativas de explotación, se generó el diseño minero para ambas opciones, el cual se utilizó para realizar un modelo de constructibilidad del sector, con objetivo de entregar la temporalidad del inicio y fin de los desarrollos, obras y construcciones junto con la puesta en marcha para cada estrategia. A su vez el modelo entregó las estimaciones de CAPEX requeridos para cada periodo de desarrollo del proyecto. Finalmente se realizó una evaluación económica del proyecto, obteniéndose resultados positivos de VAN para ambas estrategias analizadas entregando valores de 284,7 y 235,5 MUS$ para las opciones de Continuidad de Bloques y Caving Virgen respectivamente. En función de los antecedentes geológicos y geomecánicos, junto con la planificación, diseño, constructibilidad y análisis económico realizado a lo largo del estudio, se concluyó que la explotación subterránea del proyecto Recursos Sur presenta suficiente robustez técnica y económica para continuar sus estudios en la etapa de ingeniería de prefactibilidad. Se sugiere continuar los estudios de la opción de Continuidad de Bloques puesto que presenta mayor potencial económico y sinergias de constructibilidad extendiendo la vida de Esmeralda en 17 años. Se recomienda analizar el ambiente de esfuerzos esperado del acople de las cavidades de Esmeralda y Diablo Regimiento y junto con esto realizar campañas de sondajes para la etapa de ingeniería de factibilidad.
275

Diagnóstico productivo en las operaciones unitarias de transporte y planta de chancado de Minera Antucoya mediante simulación dinámica de eventos discretos

López Solar, Felipe Alberto January 2016 (has links)
Ingeniero Civil de Minas / En la gran minería a cielo abierto, los sistemas pala-camión son ampliamente usados para realizar la labor de carguío y transporte. Actualmente este ítem abarca cerca del 50% de los costos de operación y en donde las principales mejoras se logran a través de una gestión óptima de la disponibilidad, confiabilidad y mantenimiento del sistema. En el caso de la minera en estudio, el costo Planta asciende al 48% del costo de caja, y el 25% de este último corresponde al costo del chancado. El principal objetivo de este estudio es determinar el ritmo de producción de Minera Antucoya en plena operación, en base a las variables y supuestos determinados en la fase de proyecto y construcción, incluyendo en cada uno de los equipos del procesamiento de mineral, sus tiempos de reparación y entre fallas, aplicados en base a distribuciones de probabilidad. La metodología aplicada a este trabajo consta del desarrollo de un modelo de simulación basado en un modelo conceptual, que detalla supuestos, parámetros, variables, criterios de diseño y operación utilizados, que permiten una comprensión del sistema modelado. La codificación el modelo en la plataforma ProModel® obtiene como resultado una producción anual de 30,77 Mt. Luego de calcular la simulación terminante, se comprueba que con sólo una corrida es suficiente. El paso siguiente fue calibrar el modelo para generar un sistema que soporte capacidades de emergencia en caso de déficit de producción. Luego de esto se validaron por partes y verificaron los indicadores para equipos principales de las tres etapas de chancado. Su resultado fue una producción de 32,76 Mtpa, lo que equivale a un beneficio marginal de US$ 27,4 MM. Se recomienda continuar este estudio, de manera de poder replicar las condiciones de la operación con una base de datos actualizada, considerando al menos aumentar el límite de batería hasta las pilas de lixiviación, para de esta forma obtener estimaciones más cercanas a su real desempeño. / In large scale open pit mining, shovel-truck system are widely used for loading and haulage labors. Actually, this item represents nearly 50% of operating costs, where main improvements are achieved through optimal management of availability, reliability and maintenance of the system. In this particular study case, processing costs reach 48% of cash costs, where 25% of this given cost comes into the crushing step. Main purpose of this study is to determine the production rate of Antucoya Mining in full operation, based on variables and suppositions determined during the project and construction phases, including for each processing unit, its maintenance times between malfunctions applied on probabilistic distributions. The methodology applied for this study includes the development of a simulation model based on a conceptual model, which specifies suppositions, parameters, variables, design and operation criterion that allow a comprehensive patterned system. The code lines of the model used in ProModel® platform delivers an annual production rate of 30.77 Mt. After calculating the finishing simulation, it is proven that a single run is enough. The next step is to calibrate the model to generate a system that supports emergency capacities in case of a lacking production. After this, the indicators for the 3 main crushing stages were validated and verified individually. With this, a new production of 32.76 Mtpa is achieved which represent a marginal profit of US$ 27.4M. It is advised to further continue this study in order to replicate the operating conditions using updated data and increasing at least the battery limit to leaching piles, allowing the model to obtain more realistic estimations. / 28/7/2021
276

Desarrollo plataforma de monitoreo y control de indicador de calidad de producción

Espinoza Durán, Carlos Alberto January 2015 (has links)
Magíster en Gestión y Dirección de Empresas / La Gerencia de Operaciones de Minera Esperanza, responsable del cumplimiento del plan de producción anual, y que éste se cumpla con los mejores estándares de seguridad y dentro del presupuesto asignado, ha apoyado la generación de este estudio para la construcción de un indicador que permita evaluar la calidad del cumplimiento del plan de producción y entregue herramientas para la toma oportuna de decisiones y que permita resumir el desempeño de las actividades principales del área. La implementación del indicador de calidad de Producción (ICP) se realizó en una plataforma de panel de control basado en herramientas de inteligencia de negocios (Microstrategy), que permitió la correcta visualización del indicador sintético creado. Para la construcción del indicador ICP se utilizó la metodología propuesta por la OCDE (Organización para la Cooperación y el Desarrollo Económico). Este indicador agregó componentes o sub-indicadores, tales como Costo Directo Producción (C1) (aspecto costos), Cumplimiento Producción % (aspecto producción) e Índice Gravedad (seguridad). El indicador compuesto resultante, denominado ICP (Índice Calidad de Producción) permitió evaluar el desempeño mensual del área de producción, poder efectuar comparaciones entre periodos y relevar tendencias que permitan tomar decisiones y ejecutar acciones de mejora continua y cumplimiento de directivas estratégicas de la compañía. Aspectos relevantes del indicador tiene que ver con la posibilidad de mostrar el impacto en la calidad del cumplimiento, cada vez que el proceso productivo se ve afectado por accidentes graves o fatales y mostrar que la afectación es relevante y que toma meses de recuperación. Producto de lo anterior se logró definir rangos de operación del indicador para facilitar la toma de decisión temprana para el cambio de tendencia. Para la implementación de este indicador compuesto (ICP), se diseñó y construyó un panel de control, mediante la utilización de la herramienta de Inteligencia de Negocios Microstrategy, empleando como almacén central de información una base de datos denominada Datawarehouse . Este almacén permite disponer de los datos requeridos para la obtención de los atributos (conceptos de información) y métricas (valores numéricos) relevantes para el diseño del panel. Esta herramienta, permite adicionalmente, desplegar información más detallada de los variables claves que componen el indicador o de nivel aún más inferiores. Los beneficios esperados de su implementación provienen de la difusión clara de un valor de desempeño (ICP), que permita comprender claramente el desempeño global del área en el tiempo (junto a su tendencia), con el objeto de tomar las acciones adecuadas para la remediación de las condiciones y desempeños no deseados.
277

Mejoramiento del proceso y control de inversiones en Minera Collahuasi

González Cuello, Marco Antonio January 2015 (has links)
Autor no autoriza el acceso a texto completo de su documento hasta el 4/9/2020. / Magíster en Gestión y Dirección de Empresas / Minera Collahuasi es una mina de cobre la cual está ubicada en la región de Tarapacá al interior de la comuna de Pica a 4200 msnm. Actualmente tiene 3 accionistas Genclore-Xstrata 44%, Angloamerican 44% y Mitsui con un 12%. La producción de cobre anual de Collahuasi es de 440 Kton de cobre fino. Collahuasi, realiza un proceso de inversión en su totalidad manual, sin análisis de riesgos y con muy poca información respecto a la necesidad de aprobar un proyecto específico. Esto ha generado una serie de demoras como proyectos con carga de costos cruzadas, poco conocimiento de los procesos internos de creación y activación de proyectos, doble provisionamiento, sin reportabilidad, proyectos con gastos superiores al Budget aprobado, etc. Como consecuencia de todas estas malas prácticas y la mala forma de proceder se detectaron montos no aprobados por US$ 233.271.000; y bienes en curso y no activados por US$ 1.018.000.000 al año 2012. Debido a lo mencionado anteriormente es que se determina que existen demasiadas barreras que son fácilmente vulneradas y no controladas, las cuales atentan contra el manual de autoridad de la compañía. Por lo tanto, se decide realizar un análisis de los procesos del sistema de inversiones. Por lo que el objetivo principal de este trabajo es Generar y proponer mejoras en el proceso y control de inversiones en compañía minera Collahuasi. Se realizó una revisión de los procesos actuales de las inversiones de capital de Minera Collahuasi. Se realiza un workshop con consultores externos y todas las áreas de la compañía que tienen relación con las inversiones. Además se trabajó con una empresa que nos ayudó a gestionar el cambio incorporando a todos los usuarios directos en la estructuración de los nuevos procesos. Para identificar las mejores prácticas, se realizó un Benchmarking con mineras con producción y tamaño similares a minera Collahuasi. Estas fueron Antamina de Perú y Angloamerican división los Bronces en Chile. Las conclusiones más relevantes y concretas de la revisión e implementación de las mejoras han sido; disminución de los montos de bienes en tránsito, overrun cero en los proyectos lo que antes de las mejoras ascendían a US$233.271.000, se libera a un ingeniero para que revise las SFI y las cree en Ellipse, Optimización de tiempo en la creación de las SFI (de meses a 1 semana en promedio) y aprobación de Board Papers (de 1 año a 1 mes en promedio). En los procesos de Budget y Forecast, la consolidación de la información disminuyó de 2 días a 1 hora en promedio. Las propuestas que se han generado nos permiten gestionar los proyectos en forma más eficiente bajando los tiempos de aprobación, teniendo un mayor control de los gastos de inversiones. Esto se ve reflejado con el seguimiento que podemos hacer en el sistema y con los KPI que obtenemos desde que se ingresa hasta que se prueba un proyecto. Hoy podemos decir que contamos con un proceso de inversión estructurado para toda la compañía, el cual se encuentra en mejoramiento continuo buscando buenas prácticas de otras compañías.
278

Secuenciamiento óptimo de caserones en minería subterránea selectiva

Rojas Canales, Valentina Javiera January 2017 (has links)
Ingeniera Civil de Minas / La planificación minera es un proceso iterativo, costoso en términos de tiempo y requiere de equipos de trabajo especializados. Tradicionalmente, el proceso de planificación es un proceso secuencial, es decir, se elabora un plan de producción el cual va siendo modificado o adaptado posteriormente, según los requerimientos de la operación. Esto se traduce en que las metas de producción originales no se cumplen, y el VAN final es menor al planificado. El objetivo principal de este trabajo es comparar y cuantificar el impacto que tiene la dilución no planificada, a través de dos modelos, sobre el plan de producción, la secuencia de extracción y en el VAN de la operación. Para esto, se realiza la planificación de una mina explotada por el método selectivo Bench & Fill, a través de un enfoque tradicional y un enfoque integrado, el cual incorpora un modelo de dilución. El impacto que tiene la dilución sobre el proceso de planificación puede ser observado a través de la comparación de ambos enfoques. Para la realización de este trabajo se utilizó el software agendador de actividades UDESS (Universal Delphos Sequencer and Scheduler), dado que es una herramienta robusta, flexible y que, además, posee la ventaja, por sobre otras herramientas, de entregar resultados optimizados. El secuenciamiento realizado por UDESS entregó las secuencias óptimas de extracción y los respectivos planes de producción para cada uno de los escenarios estudiados. En el proceso de planificación se incluyeron restricciones operacionales, tales como tasa de producción y movimiento de relleno, en conjunto con la valorización de ciertas actividades (desarrollos horizontales, extracción y relleno). Estas fueron utilizadas para determinar las restricciones de precedencia y el orden de la secuencia de extracción. Al comparar los resultados obtenidos se observó que incluir la dilución dentro del proceso de planificación produce un impacto directo sobre la secuencia de extracción, el VAN de la operación disminuye aproximadamente un 2% y, por ende, el plan de producción cambia. Finalmente, se concluye que la incorporación de los modelos de dilución como parámetro geomecánico al proceso de planificación impacta de manera directa los planes de producción, la secuencia de extracción y, de manera negativa, el VAN de la operación, sin embargo, la optimización del secuenciamiento realizado por el software permite que este impacto sea poco significativo. Además, la ventaja que tiene la incorporación de la dilución al proceso, es que permite obtener resultados más cercanos a la realidad operacional y menos susceptibles a cambios en etapas posteriores de la planificación minera. / 12/05/2020
279

Diseño de la planificación diaria de operaciones en Minera Escondida Ltda.

Garrido Montenegro, Leopoldo Ariel January 2013 (has links)
Magíster en Gestión y Dirección de Empresas / Minera Escondida Ltda. es la mayor mina de cobre a nivel mundial ubicada en la II Región de Chile. En 2011 su producción fue cercana al 5% de la producción mundial de cobre y un 16% de la producción nacional, cuenta con una de las mayores reservas de cobre en el mundo, lo que le entrega sustentabilidad al negocio. Actualmente los cumplimientos mensuales de movimientos mina y de alimentación a chancados se están logrando de manera muy satisfactoria llegando al 100% o sobre este valor, sin embargo, en la secuencia del plan minero, trabajos de desarrollo críticos o trabajos de infraestructura el cumplimiento llega a valores que no superan el 60% lo que genera costos mayores a los estimados producto de que se tienen que realizar tareas no contempladas. Teniendo en cuenta lo mencionado en el párrafo anterior y reconociendo que en la actualidad existe un proceso productivo muy variable en cuanto al cumplimiento de los planes mensuales, surge la necesidad de generar una planificación diaria que incorpore tanto los movimientos de todas las áreas productivas (producción, desarrollos, perforación y tronadura) como los imprevistos que ocurren día a día, teniendo una componente de seguridad (HSEC) que indique los principales riesgos asociados, considerando además el incorporar tecnología a la visualización de estos planes, para facilitar así el entendimiento en la ejecución. Con esto se busca minimizar el impacto en el plan mensual que tienen los imprevistos en el día a día, mientras por otra parte, en el mediano plazo, se busca la estabilidad en el proceso de producción. Se observó que existe una clara correlación entre el cumplimiento del plan diario y el cumplimiento de plan mensual. Para un promedio de cumplimiento del 85% del plan diario se pueden lograr valores aproximados del 66% del cumplimiento del plan mensual. Siendo el objetivo de la compañía estar sobre el 75%-80% del cumplimiento del plan mensual, se recomienda, debido a la relación existente entre la planificación diaria y mensual, llevar el cumplimiento del plan diario a valores sobre el 90%-95% que está asociado principalmente a la disciplina operacional y a minimizar los imprevistos, lo que implicará estar dentro de rango de cumplimiento del plan mensual que pide la compañía. Dentro de todos los impactos mencionados en el estudio, el que fue evaluado tiene que ver con el aumento de remanejo de mineral producto del no cumplimento de la secuencia mina. Esto genera un gasto adicional que representa el 2.21% del total mensual de la Gerencia de Operaciones versus un gasto de implementación que tiene este plan diario que representa el 0.1% del gasto total mensual y que está asociado aumento de dotación de planificadores. Si se logra capturar esta diferencia, se obtendría una reducción del costo para la Gerencia de un 0.3%. Por lo que se concluye, que si bien, el impacto no es de gran magnitud, es un impacto positivo para el negocio.
280

Sistema de gestión para optimizar el consumo de agua en Quebrada Blanca

Castagno Arancibia, Rodrigo Damián January 2019 (has links)
Tesis para optar al grado de Magíster en Gestión y Dirección de Empresas / El propósito del presente informe es desarrollar un sistema de gestión sobre el consumo del agua en dos de los procesos internos de Quebrada Blanca, que permita optimizar el uso del recurso hídrico. El sistema de gestión se basa en un conjunto de acciones, técnicas y procedimientos que tienen por objeto optimizar procesos a través de cuatro pilares que se relacionan entre sí formando un círculo virtuoso que se alimenta y fortalece con la incorporación del aprendizaje de incidentes a la planificación. Los cuatro pilares que se desarrollan son la Planificación, que incluye las subetapas de Matriz de Riesgos y Planes de Mitigación & Control, siguiendo el ciclo con Ejecución, Verificación y Aprendizaje. El sistema de gestión opera mediante acciones concretas durante su implementación enfocadas principalmente en los temas de revisión y modificación de procesos actuales, capacitación de personal, identificación de riesgos, planes de acción, implementación de planes de acción en los parámetros claves con verificación, aprendizaje de pérdidas, análisis estadístico de registros y gestión de personas. Adicionalmente, un objetivo importante de este modelo es la incorporación del personal a la gestión eficiente creando una cultura de aprendizaje a partir de la aplicación sistemática del sistema de gestión. Si se considera a las personas como capital humano clave para la mejora de productividad, la gestión de personas estimula las competencias mediante el entrenamiento y la capacitación permanente como estrategia de mejoramiento continuo que se suma al enfoque tradicional basado en la rentabilidad del negocio. De esta manera se espera aumentar la utilidad de la empresa. Para la prueba y aplicación del proyecto se selecciona dos de los procesos que consumen más agua fresca en la operación de lixiviación como son la Aglomeración y el Riego donde se recorren ambos procesos aplicando experimentalmente cada una de los cuatro pilares del sistema de gestión. Para el proceso de Aglomeración, se concluye que la gestión se debe enfocar en los parámetros que inciden en la correcta formación del glómero. Se pudo verificar también que la humedad óptima es un parámetro relevante en el control y adición de agua que puede ser determinado operacionalmente para su control, por lo tanto es un proceso que tiene oportunidades de optimización y, por ende, se justifica la aplicación del sistema de gestión. De la misma manera se pudo verificar para el proceso Riego que en la etapa de apilamiento, es muy importante generar una superficie horizontal y pareja en la pila de lixiviación. La evaluación económica del proyecto, expresada en cifras referenciales según datos obtenidos entre los años 2016 y 2017, permite concluir que la reducción de un 5 % anual en el consumo de agua dulce produce un ahorro significativo de 42 millones de dólares a un costo de realización del proyecto mucho menor, expresado principalmente en remuneraciones de personal dedicado exclusivamente a la implementación del sistema de gestión y se calcula cercano al millón de dólares. Se concluye que la aplicación del sistema de gestión es válido y permite optimizar procesos, por lo que constituye una poderosa herramienta de gestión para apoyar el futuro de los proyectos en la mina Quebrada Blanca.

Page generated in 0.0371 seconds