Spelling suggestions: "subject:"modularity inn production (MIP)"" "subject:"modularity iin production (MIP)""
1 |
Redesign of the Omnideck platform : With respect to DfA and modularity / Omkostruktion av Omnideck plattformenMed hänsyn : Med hänsyn till DfA och modularitetBrinks, Hanne, Bruins, Mathijs January 2016 (has links)
In this report a product development process is constructed and used to redesign an omnidirectional treadmill, the Omnideck. The current design of the Omnideck platform is designed without regard for assembly. Using modularity and design for assembly theories, incorporated with the product development process, the Omnideck platforms design is improved in respect to assembly time. The original design required 175 labour hours to install. The result is an improved design which requires ten and a half hours to install at a customer. This is achieved by redesigning the Omnideck into individual modules which allow for a faster installation.
|
Page generated in 0.1323 seconds