• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 227
  • 67
  • 33
  • 22
  • 12
  • 8
  • 8
  • 4
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • Tagged with
  • 417
  • 151
  • 127
  • 123
  • 107
  • 97
  • 96
  • 92
  • 92
  • 87
  • 84
  • 79
  • 78
  • 76
  • 74
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
241

Městské centrum kultury a vzdělávání / City Center of Culture and Education

Hlavatý, Pavel January 2014 (has links)
Master’s thesis includes building documentation of new building of city center of culture and education. Ground plan is in „L“ shape and it is placed in a hillside. There will be a library, multipurpose class, exhibition area, reading room and café. Building has three floor in one part and in second part two floor with partially imbedded basement. The roof is flat. It’s a detached building in the centre of town Dvůr Králové nad Labem.
242

Založení železobetonové budovy / Foundation of reinforced building

Prokop, Lukáš January 2014 (has links)
Master´s thesis describes foundation of reinforced concrete framed building and preliminary design of upper construction. Calculation of internal forces was performed by computer program SCIA Engineer like 3D model. This substructure is designed as water resistant construction that is supported by deep foundations.
243

Bytový dům v Uherském Hradišti / The apartment house in Uherské Hradiště

Kročová, Romana January 2014 (has links)
The topic of the thesis is the design of new residential building in Uherské Hradiště. The aim is to develop detailed documentation for construction. The work includes studies, drawings, text and part of the calculation. It is a detached residential building with ground plan dimensions of approximately 16,5 x 26,5m. The building has 4 floors and a flat roof. The building is made of ceramic bricks, ceilings are monolithic reinforced concrete. Roofing is made up of single shell flat roof. The building is located on undeveloped land in housing estates on flat terrain. Residential building contains 16 apartments. Part of the 1st floor is also 6 separate garage.
244

Bytový dům v Tišnově / The apartment house in Tišnov

Egerová, Tereza January 2014 (has links)
The topic of the thesis is the design of new residential building in Tišnově. The aim is to develop detailed documentation for construction. The work includes studies, drawings, text and part of the calculation. It is a detached residential building with ground plan dimensions of approximately 13.5 x 37 m. The building has 4 floors and a flat roof. The building is made of ceramic bricks, ceilings are monolithic reinforced concrete. Roofing is made up of single shell flat roof. The building is located on undeveloped land in housing estates on flat terrain. Residential building contains 12 apartments, one of which is completely wheelchair. There are also 6 separate garages on the first floor.
245

ČOV Kostelec u Jihlavy - stavebně technologický projekt / WWTP Kostelec u Jihlavy - constructive-technological project

Rotrekl, Ivo January 2014 (has links)
This master’s thesis deals with the constructive-technological solutions of waste water treatment plant. This thesis consists of a comprehensive elaborate project of implementation including the time schedule, financial plan with usage of employments and technological prescriptions. Deals with design of main mechanisms and monitoring and testing plan. Logistics of resources, concept of building ground and procedures needed for realization are processed as well, risks of realization.
246

Obchodní dům "Centrum" v Brně / "Centrum" Department Store in Brno

Hanychová, Hana January 2014 (has links)
The subject of the diploma thesis is the architectural study of the reconstruction and extension of the department store “Centrum“ by an architect Vladimír Karfík, which is situated between the Jánská and Kobližná streets in Brno. This object should have been the highest building in the whole of Europe at its time, but due to the problems, which occurred during the construction, finally only eight storeys out of the original twenty eight were realized. The new object will be a fifteen storey building. Original eight ground floors, from which the last two were subsided, is aligned to a seven storey whole in a new design, and on this unit there is the extension of eight shorter floors, which are on the south side retreating and which are converging to one point like an unfolding fan in the direction to a new extension block with communication and installation cores in the western part. This creates the southern facade of small terraces, and an architectural expression from the perspective of pedestrians acts dynamically and less mighty. The functional utilization is combined, there is a passage with shops, two cafés, services, administration, and on the last floors there is housing. From an architectural point of view the building fits into the structure of urban conservation and the height does not exceed the spires of the church.
247

Závislost ceny a lhůty výstavby vybraného stavebního objektu na použité technologii / Dependence of a price and a building period of selected construction on the technology

Jandová, Renáta January 2015 (has links)
The thesis focuses on the dependence of price and building period of selected construction on the technology of the certain object. Three different technologies are being compared regarding the supporting structure of the bridge. The first two technologies consider girder prefabs and the third technology involves a monolithic support plate. The technological method no. 1 is implemented through assembling of the girders via conveyor line with the assistance of mobile cranes; the method no. 2, on the other hand, implies the whole assembly from below the bridge also using mobile cranes. The method no. 3 is monolithic – the wooden basis is covered with concrete layer. The dependence of construction time and price is carried out by the comparison of methodologies through budgets, schedules, multi-criteria ratings and economic ratings.
248

Železobetonová skeletová konstrukce / Reinforced concrete frame construction

Hons, Filip January 2015 (has links)
Master´s thesis focuses on the design of monolithic reinforced concrete structures storey hose which consist of 2 underground and 6 floors. This project deals whit two different boards, board over ground floor and over second floor, as well as three pillars supporting board, separate staircase placed in a reinforced core, base plate. All calculations are done according to applicable standards, mainly according to ČSN EN 1992-1-1.
249

Monolitický vícepodlažní stěnový objekt / Monolithic multi-storey wall building

Vymazal, Jakub January 2015 (has links)
Final thesis with tittle: "Monolithic multi-storey wall building" is processeed as a project documentation according to valid assesment. The object is located in the city of Boskovice, 35 Hybešova street. Its ground plan dimensions are 52,8m x 12,5m. Total height of object is 22,3m including roof-wall, measured from the level of base chink. There are enclosed balconies on the south direction. Movement between floors is ensured by 2-flighted stairs. Object is It is made of reinforced concrete. It is designed as 6-floor bulding with a flat roof. The main supporting construction is created by system of walls and reciprocally asigned ceilings, which are sticked together. Walls are designed as pillars. The building is assigned to a belt bases. Module dimensions are 8,7m in longitudinal direction and 5,2m in transversal direction. Height dimension is 3,0m. The thesis is dealing with the 1st upper floor.
250

Polyfunkční dům / Multifunctional building

Růžička, Antonín January 2015 (has links)
Diploma thesis Multifunctional building is compiled in the form of project documentation. The building is located in Brno, Vinařská street. It´s a building with four overground floors designed primarily to housing and one underground floor, which is mainly used as collective garage. The building will be made from POROTHERM blocks with the mineral heat insulation. The ceilings will be made of reinforced concrete. The building has a single-layer flat roof.

Page generated in 0.0584 seconds