Spelling suggestions: "subject:"monolitický"" "subject:"politická""
121 |
Příprava realizace rozhledny Kelčský Javorník, Rajnochovice / Preparation of the implementation of Kelčský Javorník Lookout Tower, RajnochoviceVokurek, Kamil Unknown Date (has links)
This diploma thesis is based on preparation of the implementation of Kelčský Javorník Lookout Tower in Rajnochovice. The main idea of the lookout tower constructing is to increase the local tourism. Diploma thesis assesses the whole project and it is focused on the foundation of the rough lower construction and also on assembly of the higher construction. Planning was assessed in terms of time, finance and in terms of the use of material resources. The quality of construction will be ensured by created inspection and test plans. To increase the overall service life of the structures, a scheduled maintenance schedule was designed. A variant solution of electricity supply was proposed, which will shorten the construction time, reduce the total construction costs and the overall maintenance of the building during its lifetime.
|
122 |
Stavebně technologický projekt bytového domu Meandr v Brně / Constructive technological project of block of flats Meandr in BrnoSchauer, Martin January 2015 (has links)
This diploma thesis deals with the construction technological project of block of flats residence Meandr in Brno - Komín. On the given topic are processed and all necessary supporting documents that enhances the clarity and orientation in matters large building for the preparation of the construction process. Given the scale, complexity and location of the building is structurally location technology project addresses the only earthworks and construction site of the main building object SO-01 only. Furthermore, nine small objects that are closely tied this main object within the premises of a residential building. Between integral part of this work include the project site facilities including a time of economic evaluation studies of major technological stages realization, design of main machinery and mechanisms itemized budgets volume of important buildings and budgets by THU volume, less important objects, further technological specification for the implementation of monolithic concrete construction as this topic linked inspection and test plan, risk and crisis measures. For the entire building housing residence is prepared detailed timetable and a lot of additional documents.
|
123 |
Příprava realizace stavby Biology Park Brno / Preparation for construction management Biology Park BrnoŠťastná, Ludmila January 2016 (has links)
The thesis deals with the preparation of construction works Biology Park Brno . The goal is to determine the time, financial and material demands of the building and determine the appropriate method of construction technology . The work is focused on the main building object SO 01 - Building laboratories and offices , but some parts are addressed to the whole building. It is elaborated construction technology study , which followed closely solved the selected part of building technology project dealing with the given structures. Part of the work is devoted to the design optimization of the amount of formwork , which is necessary for construction.
|
124 |
Stavebně technologická příprava dopravního terminálu v Peci pod Sněžkou / Construction and Technological Preparation of the Transport Terminal in Pec pod SněžkouČerný, Jiří January 2022 (has links)
The diploma thesis solves construction and technological preparation of the transport terminal in Pec pod Sněžkou. The content of the diploma thesis is a techical report on the construction technology project, the coordination situation, the time and financial schedule, the project of building site, selection of machines, time schedule for the main building object, plan for securing material resources for the main building of the transport terminal, technological prescription and inspection and test plan for monolithic ceiling structures. Another assignment part contains a plan for safety and health protection at work on the construction site and specialized topic is a noise study.
|
Page generated in 0.0577 seconds