Polyfunkční objekt / Multifunctional buildingProkop, Radek January 2019 (has links)
My diploma thesis deals with project a multifunctional building. My project corresponds to the scope of documentation for the execution of construction. Building hat five floor and construction roof is green roof, single-layer flat roof. Construction systém is cast-in-place concrete frame. In basement is technical facilities and parking place. In ground floor is shop place and parking floor. In first floor is office place. In third and fourth floor are flats. Building foundations are bored cast in place pile – method CFA.
|
22 |
Novostavba mateřské školy ve Velkých Bílovicích / New Building of Kindergarten in Velké BíllovicePříborský, Roman January 2019 (has links)
The subject of my diploma thesis is create a design documentation of new building of the kindergarten which is located in Velké Bílovice. This building is placed in uptown near the elementary school in the area with flat terrain. The kindergarten is designed for education and raising of 48 children and 12 students. There is a large garden behind the property. This object has two above-ground floors and has no cellar. The roof is designed as warm flat roof. The loadbearing masonry is designed from sand-lime blocks. The whole object will have contact thermal insulation system, the floor structures are from reinforced concrete. The staircase is designed as half-turn stair from reinforced concrete. This object is based on the foundation strips.
|
23 |
Hotel v Luhačovicích / Hotel in LuhačoviceTejzr, Martin January 2020 (has links)
The final thesis is focused on a newly-built hotel with wellness in Luhačovice. Luhačovice is a spa town in the region of Zlín. The plot is situated on the outskirts of the town in a mildly built-up area. The terrain is sloping with a view of the town. The building is divided into three operating parts – wellness, restaurant with café and premises for temporary accomodation.The structure is a four-story building with a cellar. The building foundations are based on the reinforced concrete foundation slab. The load-bearing structures of the basement and the ground floor are formed by reinforced concrete walls complemented by reinforced concrete columns. Upper storeys are designed in the system of Porotherm. The floor structure is cast-in-place reinforced concrete. The building is roofed with green roof.
|
24 |
Facelift EDU / Facelift PDURokotianskaia, Kseniia January 2020 (has links)
The subject of the diploma thesis is the elaboration of an architectural study of the reconstruction of the pre-plant zone of the Facelift of the Dukovany power plant. The construction site is an area that belongs to the village of Dukovany and borders the village of Rouchovany. As a whole, this area is in poor technical and architectural condition. However, its location gives potential for new uses. The solved area belongs to the ČEZ nuclear power plant.
|
25 |
Facelift EDU / Facelift PDUZhakupbekova, Rakhil January 2020 (has links)
The subject of the diploma thesis is the elaboration of an architectural study of the reconstruction of the pre-plant zone of the Facelift of the Dukovany power plant. The construction site is an area that belongs to the village of Dukovany and borders the village of Rouchovany. As a whole, this area is in poor technical and architectural condition. However, its location gives potential for new uses. The solved area belongs to the ČEZ nuclear power plant.
|
26 |
Centrum chytré čtvrti Špitálka / Smart District ŠpitalkaSergeeva, Anna January 2021 (has links)
The proposed building is part of a complex of three buildings. The task was to create the dominants of the new territory, which would include functions corresponding to the concept of a smart neighborhood. The building has 19 floors above ground and two underground. The simple shape is complemented by the corrugated roof of the congress center and the curved atrium. The main entrance is towards the new city street, the main facade of the congress center faces the square. The dynamics of the shape of the high-rise building is supported by an irregular grid of windows, the combination of full masonry and leaky lighten the facade of the lower part.
|
27 |
Stavebně technologický projekt pro Domov seniorů / Architectural and technological project for the Senior HomeBartošová, Zlata January 2012 (has links)
This thesis deals with the technological solution building construction project seniors home in Prague. Contains a technical report, technical regulations for monolithic and brick structures, which are documented inspection and test plans, as well as time and financial plans and project construction site.
|
28 |
Sportovně relaxační centrum s ubytováním / Wellness Sports-center with AccomodationBrtníčková, Jitka January 2013 (has links)
The new building of Sport and Relaxation Centre with the possibility of accommodation is situated on the vacant site in Blansko. Under the three storey building partialy runs basement. On the ground floor is located a restaurant with facilities, also rooms for sport and relaxation. On the second and the third floor is the centre’s accommodation with a total capacity of 38 persons. In the basement are mainly storerooms and utility rooms. The building is made of ceramic bricks. The ceiling construction is monolithic and the building has a flat roof. The building is constructed on footing foundations and strip foundations.
|
29 |
Bazén / Swimming poolSívek, Zdeněk January 2013 (has links)
This thesis covers brand new detached indoor pool with one underground and one above ground floor, which is designed for a maximum capacity of 120 people, with two swimming pools, a children's swimming. The building is designed with a flat rectangular roof insulation. Envelopes are ventilated, insulated, bearing part consists of reinforced concrete. The pool hall make up the majority of the building envelope glass facade. Facilities for employees is located on the first basement floor. All technologies for cleaning pool water, air conditioning, boiler, facilities for maintenance are located on the first basement floor. Chimneys are stainless steel, placed on the outside of the building. The finish floors are ceramic tile. Pool bath is designed as a so-called white bathtub. The supporting structure of the ceiling above the pool hall beams are post-tensioned concrete.
|
30 |
Novostavba Přírodovědecké fakulty Jihočeské univerzity v Českých Budějovicích - příprava realizace stavby / New construction of the Faculty of Science University of South Bohemia in the Ceske Budejovice - preparation of the realization constructionNovák, Jiří January 2013 (has links)
This thesis deals with the preparation of construction management, Faculty of Science, University of South Čekých Budějovice. The work includes a technical report on building technological project, coordinating the situation, time and financial plan, a study of the implementation of the main technological stages, the design of construction machines and mechanisms, the schedule of the main building structure, technological prescription for ventilated facade structures, inspection and test quality plan for the object SO 100, itemized budget plan and the main subject of risks arising from the construction and their action.
|