• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • Tagged with
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Utvärdering av den biologiska reningen av processavloppsvattnet vid GE Healthcare i Uppsala / An evaluation of the biological wastewater treatment at GE Healthcare in Uppsala

Fridlund, Malin January 2005 (has links)
<p>GE Healthcare operates in Uppsala (Sweden) and develops systems, equipments and medium to purify medical substances. Discussions with the local authority concerning planed far-reaching changes and upgrades of the biological process techniques for sewage management, aroused the question about revising the terms of permit for the activity. Therefore it seemed necessary to evaluate a newly installed biological process technique, which is the background of this thesis. The evaluated biological treatment process was built in 2003 and consists of a biological reactor filled with moving bed carriers with a high surface area for biological growth. At the time of the project the biological wastewater treatment plant consisted of a flow equalization facility and two following parallel biological processes; a biological reactor with moving bed carriers and a tower trickling filter.</p><p>The aim of this thesis was to survey the function of the biological reactor with respect to the reduction of organic matter. Further to clarify which circumstances that have a negative effect on the organic reduction. During the three forthcoming years, an extensive reconstruction of the biological wastewater treatment facility will be accomplished. During the construction period the flow equalization will be very limited. Therefore an emission forecast with respect to organic matter was performed comprising the construction period during the years 2005, 2006 and 2007. This to estimate the safety margin to the emission standard during the construction period.</p><p>Several parameters were surveyed during the project, water temperature, pH, plural nutrition elements, flow, oxygen concentration, suspended solids, organic load and microbial activity. At two occasions, the parameters were extensively studied during a 24-hour period respectively. Two capacity experiments were performed in order to evaluate the organic reduction at different organic loads. The obtained results together with an estimation regarding the organic load performed by AB Ångpanneföreningen were used for the emission forecast. The forecast considered two cases, operation with and without dosage of a flow with high organic content from the local solvent recycling facility (called T10-dosage).</p><p>According to the forecast, the emission standard will be fulfilled during an average month regarding the organic load. This without T10-dosage and with an average reduction of 55 %. To fulfill the standard during a month with maximum organic load, a reduction of 65 and 75 % will be required in the cases without and with T10-dosage respectively. The organic reduction is negatively effected by lasting loads of 7 kg CODfilt/m3 or higher, or by a great increase of the load in a short period of time. Sporadic peaks regarding the organic load appeared to have temporary or no negative effects on the reduction. Flow variations during evenings, nights and weekends caused variations in the organic load with negative effect of the reduction rate. The oxygen concentration in the biological reactor has a conclusive significance of the reduction rate, a lower concentration than 2 mg/l affects the reduction rate in a negative way. The buffering capacity in the biofilm reactor showed to work excellently, the pH value varied between 6.8 and 8.9. There is an immediate risk of temperatures over 40<sup>o</sup>C during the construction period. This could have a negative influence of the organic reduction. Individual measured temperatures of 38<sup>o</sup>C did not have a negative effect on the reduction rate. The amount of suspended solids varied a lot in the outflow from the biological reactor and will continue to do so during the construction period.</p> / <p>GE Healthcare bedriver sin verksamhet i Uppsala vilken består av att utveckla system, utrustning och media för att rena läkemedelssubstanser. Vid diskussion med Uppsala kommuns VA- och avfallskontor väcktes frågan angående omprövning av tillståndet för verksamheten. Diskussionerna rörde planerade processförändringar och kompletteringar av bolagets biologiska processavloppsvattenrening. Av den anledningen ansågs det nödvändigt att utreda en för företaget ny processteknik för processavloppsvatten, vilket är bakgrunden till detta examensarbete. Den utvärderade processtekniken är en biofilmreaktor innehållande ett rörligt bärarmaterial med en stor skyddad yta för biologisk tillväxt. Biofilmreaktorn togs i drift under hösten år 2003 och därmed bestod det lokala reningsverket förenklat sett av en utjämningsanläggning följd av två parallella biosteg, ett biotorn med konventionell stationär biobädd över vilken processavloppsvatten spreds samt en biofilmreaktor med rörligt bärarmaterial.</p><p>Syftet med examensarbetet var att kartlägga biofilmreaktorns funktion med avseende på reduktion av organiskt material. Vidare att klargöra vid vilka förhållanden reduktionsgraden har påverkats negativt. Under de tre kommande åren skall en stor om- och tillbyggnad av reningsverket genomföras. Förändringen kommer att medföra att utjämningsvolymen blir mycket begränsad under ombyggnadsperioden. Av den anledningen var ytterligare ett syfte med examensarbetet att utföra en utsläppsprognos med avseende på organiskt material för åren 2005 till och med 2007. Detta för att bedöma säkerhetsmarginalen till utsläppsvillkoret under ombyggnadsperioden.</p><p>Examensarbetet realiserades genom att kartlägga parametrarna organisk belastning, organisk reduktion, vattentemperatur, pH, närsalter, flöde, koncentration löst syre, suspenderad substans samt mikrobiell aktivitet. Därutöver utfördes två kapacitetsförsök för att kartlägga den organiska belastningens inverkan på reduktionen. Vid det ena försöket skapades en högre organisk belastning genom att successivt öka flödesbelastningen över biofilmreaktorn. Vid det andra försöket doserades en delström (kallad T10-dosering) innehållande rester från den lokala lösningsmedelsåtervinningen med stort organiskt innehåll. Därtill utfördes två dygnsprovtagningar för att kartlägga ett flertal parametrars dygnsvariationer. Den framtagna utsläppsprognosen baserades på en belastningsprognos utförd av AB Ångpanneföreningen samt den i arbetet kartlagda reduktionen av organiskt material vid olika belastningar. Prognosen omfattar två fall, med eller utan T10-dosering.</p><p>Enligt utsläppsprognosen kommer utsläppsvillkoret inte att överskridas under åren 2005 till och med 2007. Detta gäller vid en för året genomsnittlig månad avseende belastning utan T10-dosering och med en genomsnittlig organisk reduktionsgrad på 55 %. Under en månad med maximal belastning krävs 65 % reduktion och 75 % med T10-dosering. Kapacitetsförsöken visade att reduktionsgraden påverkades negativt vid en varaktig belastning överstigande 7 kg COD<sub>löst</sub>/m3 samt vid kraftiga belastningsökningar. Tillfälliga belastningstoppar hade endast kortvarig eller ingen negativ inverkan på reduktionen. Höga flöden under dagtid och låga flöden under nätter och helger orsakade variationer i den organiska belastningen, vilket hade en negativ inverkan på reduktionen. När koncentrationen löst syre i biofilmreaktorn understeg 2 mg/l påverkades mikroorganismerna negativt och därmed även reduktionen. Buffertkapaciteten i biofilmreaktorn var god under den studerade tidsperioden och pH-värdet varierade mellan 6,5 och 8,8. Under ombyggnadsperioden föreligger en stor risk för att vattentemperaturen kan bli för hög i biofilmreaktorn vid ett flertal tillfällen. Enstaka uppmätta temperaturtoppar på 38°C påverkade dock inte reduktionen negativt. I biofilmreaktorns utgående vatten varierade mängden suspenderad substans kraftigt, vilket även kommer att gälla under ombyggnadsperioden.</p>
2

Utvärdering av den biologiska reningen av processavloppsvattnet vid GE Healthcare i Uppsala / An evaluation of the biological wastewater treatment at GE Healthcare in Uppsala

Fridlund, Malin January 2005 (has links)
GE Healthcare operates in Uppsala (Sweden) and develops systems, equipments and medium to purify medical substances. Discussions with the local authority concerning planed far-reaching changes and upgrades of the biological process techniques for sewage management, aroused the question about revising the terms of permit for the activity. Therefore it seemed necessary to evaluate a newly installed biological process technique, which is the background of this thesis. The evaluated biological treatment process was built in 2003 and consists of a biological reactor filled with moving bed carriers with a high surface area for biological growth. At the time of the project the biological wastewater treatment plant consisted of a flow equalization facility and two following parallel biological processes; a biological reactor with moving bed carriers and a tower trickling filter. The aim of this thesis was to survey the function of the biological reactor with respect to the reduction of organic matter. Further to clarify which circumstances that have a negative effect on the organic reduction. During the three forthcoming years, an extensive reconstruction of the biological wastewater treatment facility will be accomplished. During the construction period the flow equalization will be very limited. Therefore an emission forecast with respect to organic matter was performed comprising the construction period during the years 2005, 2006 and 2007. This to estimate the safety margin to the emission standard during the construction period. Several parameters were surveyed during the project, water temperature, pH, plural nutrition elements, flow, oxygen concentration, suspended solids, organic load and microbial activity. At two occasions, the parameters were extensively studied during a 24-hour period respectively. Two capacity experiments were performed in order to evaluate the organic reduction at different organic loads. The obtained results together with an estimation regarding the organic load performed by AB Ångpanneföreningen were used for the emission forecast. The forecast considered two cases, operation with and without dosage of a flow with high organic content from the local solvent recycling facility (called T10-dosage). According to the forecast, the emission standard will be fulfilled during an average month regarding the organic load. This without T10-dosage and with an average reduction of 55 %. To fulfill the standard during a month with maximum organic load, a reduction of 65 and 75 % will be required in the cases without and with T10-dosage respectively. The organic reduction is negatively effected by lasting loads of 7 kg CODfilt/m3 or higher, or by a great increase of the load in a short period of time. Sporadic peaks regarding the organic load appeared to have temporary or no negative effects on the reduction. Flow variations during evenings, nights and weekends caused variations in the organic load with negative effect of the reduction rate. The oxygen concentration in the biological reactor has a conclusive significance of the reduction rate, a lower concentration than 2 mg/l affects the reduction rate in a negative way. The buffering capacity in the biofilm reactor showed to work excellently, the pH value varied between 6.8 and 8.9. There is an immediate risk of temperatures over 40oC during the construction period. This could have a negative influence of the organic reduction. Individual measured temperatures of 38oC did not have a negative effect on the reduction rate. The amount of suspended solids varied a lot in the outflow from the biological reactor and will continue to do so during the construction period. / GE Healthcare bedriver sin verksamhet i Uppsala vilken består av att utveckla system, utrustning och media för att rena läkemedelssubstanser. Vid diskussion med Uppsala kommuns VA- och avfallskontor väcktes frågan angående omprövning av tillståndet för verksamheten. Diskussionerna rörde planerade processförändringar och kompletteringar av bolagets biologiska processavloppsvattenrening. Av den anledningen ansågs det nödvändigt att utreda en för företaget ny processteknik för processavloppsvatten, vilket är bakgrunden till detta examensarbete. Den utvärderade processtekniken är en biofilmreaktor innehållande ett rörligt bärarmaterial med en stor skyddad yta för biologisk tillväxt. Biofilmreaktorn togs i drift under hösten år 2003 och därmed bestod det lokala reningsverket förenklat sett av en utjämningsanläggning följd av två parallella biosteg, ett biotorn med konventionell stationär biobädd över vilken processavloppsvatten spreds samt en biofilmreaktor med rörligt bärarmaterial. Syftet med examensarbetet var att kartlägga biofilmreaktorns funktion med avseende på reduktion av organiskt material. Vidare att klargöra vid vilka förhållanden reduktionsgraden har påverkats negativt. Under de tre kommande åren skall en stor om- och tillbyggnad av reningsverket genomföras. Förändringen kommer att medföra att utjämningsvolymen blir mycket begränsad under ombyggnadsperioden. Av den anledningen var ytterligare ett syfte med examensarbetet att utföra en utsläppsprognos med avseende på organiskt material för åren 2005 till och med 2007. Detta för att bedöma säkerhetsmarginalen till utsläppsvillkoret under ombyggnadsperioden. Examensarbetet realiserades genom att kartlägga parametrarna organisk belastning, organisk reduktion, vattentemperatur, pH, närsalter, flöde, koncentration löst syre, suspenderad substans samt mikrobiell aktivitet. Därutöver utfördes två kapacitetsförsök för att kartlägga den organiska belastningens inverkan på reduktionen. Vid det ena försöket skapades en högre organisk belastning genom att successivt öka flödesbelastningen över biofilmreaktorn. Vid det andra försöket doserades en delström (kallad T10-dosering) innehållande rester från den lokala lösningsmedelsåtervinningen med stort organiskt innehåll. Därtill utfördes två dygnsprovtagningar för att kartlägga ett flertal parametrars dygnsvariationer. Den framtagna utsläppsprognosen baserades på en belastningsprognos utförd av AB Ångpanneföreningen samt den i arbetet kartlagda reduktionen av organiskt material vid olika belastningar. Prognosen omfattar två fall, med eller utan T10-dosering. Enligt utsläppsprognosen kommer utsläppsvillkoret inte att överskridas under åren 2005 till och med 2007. Detta gäller vid en för året genomsnittlig månad avseende belastning utan T10-dosering och med en genomsnittlig organisk reduktionsgrad på 55 %. Under en månad med maximal belastning krävs 65 % reduktion och 75 % med T10-dosering. Kapacitetsförsöken visade att reduktionsgraden påverkades negativt vid en varaktig belastning överstigande 7 kg CODlöst/m3 samt vid kraftiga belastningsökningar. Tillfälliga belastningstoppar hade endast kortvarig eller ingen negativ inverkan på reduktionen. Höga flöden under dagtid och låga flöden under nätter och helger orsakade variationer i den organiska belastningen, vilket hade en negativ inverkan på reduktionen. När koncentrationen löst syre i biofilmreaktorn understeg 2 mg/l påverkades mikroorganismerna negativt och därmed även reduktionen. Buffertkapaciteten i biofilmreaktorn var god under den studerade tidsperioden och pH-värdet varierade mellan 6,5 och 8,8. Under ombyggnadsperioden föreligger en stor risk för att vattentemperaturen kan bli för hög i biofilmreaktorn vid ett flertal tillfällen. Enstaka uppmätta temperaturtoppar på 38°C påverkade dock inte reduktionen negativt. I biofilmreaktorns utgående vatten varierade mängden suspenderad substans kraftigt, vilket även kommer att gälla under ombyggnadsperioden.

Page generated in 0.106 seconds