71 |
Stavebně technologický projekt bytového komplexu Vila Park v Olomouci / Construction technology project of the apartment building Vila Park in OlomoucBartošek, Radim Unknown Date (has links)
In diploma thesis describes structurally technical project of the object A9 of the apartment building Vila Park in Olomouc. The parts of the thesis are technical report of the construction-technological project, assessment of trasnport routes, design of site equipment and design of main machines. The thesis also deals with technological regulation of external thermal insulation composite and his control and test plan. There is also schedule and itemized budget. In the end of the work is safety and healt protection on the construction site and economic deployment evaluation lifting mechanism.
|
72 |
Stavebně technologický projekt pro Domov seniorů / Architectural and technological project for the Senior HomeBartošová, Zlata January 2012 (has links)
This thesis deals with the technological solution building construction project seniors home in Prague. Contains a technical report, technical regulations for monolithic and brick structures, which are documented inspection and test plans, as well as time and financial plans and project construction site.
|
73 |
Sportovně relaxační areál Nový Lískovec - vybraná část STP / SPORTS RELAXING CENTRUM Nový Lískovec-SELECTED PARTS OF THE CTPVenkrbec, Václav January 2012 (has links)
The master's thesis is solving a build-up technology of a polyfunctional building construction with a badminton hall. It is a prefabricated skeleton in combination with ceramic walls.
|
74 |
Novostavba Přírodovědecké fakulty Jihočeské univerzity v Českých Budějovicích - příprava realizace stavby / New construction of the Faculty of Science University of South Bohemia in the Ceske Budejovice - preparation of the realization constructionNovák, Jiří January 2013 (has links)
This thesis deals with the preparation of construction management, Faculty of Science, University of South Čekých Budějovice. The work includes a technical report on building technological project, coordinating the situation, time and financial plan, a study of the implementation of the main technological stages, the design of construction machines and mechanisms, the schedule of the main building structure, technological prescription for ventilated facade structures, inspection and test quality plan for the object SO 100, itemized budget plan and the main subject of risks arising from the construction and their action.
|
75 |
Bytový dům Nové Pitkovice,objekt T+S - stavebně technologický projekt / Residential House Nové Pitkovice, building T + S - Building Technology ProjectKolář, Jan January 2013 (has links)
Master's thesis deals with the processing of building technology project for construction of residential house T + S in Praha Nové Pitkovice. Main focus is to develop a technical report on the project of building technology, processing technology and regulations for insulation of flat roof design and inspection test plans. Important part of the solution is the project construction site, design of the main building machines and time schedule during construction.
|
76 |
Stacionář Ropice- stavebně technologický projekt / Ropice-care facility construction and technological projectRylko, Dominik January 2013 (has links)
The master‘s thesis deals with the constructive – technological project of day care centre in Ropice. The project includes a technical report, time and financial schedule, building site, quality and safety requirement, an operating regulativ for implementation of concrete cailing above the 1-st floor of a main building object. The work is based on the project for implementation.
|
77 |
Apartmány Farské lúky, Čeladná - příprava a realizace stavby. / Apartments Farské lúky, Čeladná - preparation and realization construction.Stach, Jakub January 2013 (has links)
The object of the diploma thesis is preparation and realization of the gross superstructure of apartment houses Farske luky in Celadna. Diploma thesis deals with facility of the building site, project of machines, technological rules of monolithic constructions, plans of quality controls, time and financial plan, works contract, schedule and work safety.
|
78 |
Středisko vědeckých informací a vstupní hala Masarykovy university v Brně - stavebně technologický projekt / Scientific information center and the entrance hall of Masaryk University in BrnoKovařík, Jan January 2013 (has links)
This thesis addresses the construction and technological renovation project ESF MU in Brno. The building will be solved in three main stages. The first phase is the demolition work, the second is the renovation of interier and the third is the inovation of skylight. Reconstruction will take place in the 1st floor and 2nd floor especially in the hall and library. The building is a reinforced concrete skeleton with monolithic reinforced concrete ceiling.
|
79 |
Bytový dům Brno,Vídeňská- příprava a realizace stavby. / Apartment building Brno,Vídeňská - preparation and realization construction.Hlušičková, Lenka January 2013 (has links)
This Master’s thesis deals with the technological project of the new building apartment house in Brno. This work includes technical reports, site equipment, wider transport relations,budget calculation, time planning, inspection and test plan, mechanical assembly, contract for work, safety plan and risks on the building.
|
80 |
Stavebně technologický projekt polyfunkčního souboru EASTGATE / Architectural and technological project the polyfunctional file EASTGATEPlaček, Michal January 2013 (has links)
The aim of this master's thesis is the architectural and technological project of office building the polyfunctional file EASTGATE. It deals with a solution of the developing process in term of time, financial and material requirements based on client and designer requirements. Architectural and technological project of the master's thesis contains technological regulations, building equipment, schedule, itemized budget, design mechanical assembly, inspection and test plan, health and safety, etc.
|
Page generated in 0.0259 seconds