Spelling suggestions: "subject:"powerline"" "subject:"poweriline""
141 |
Vzdálené měřicí systémy a jejich praktické využití / Remote measuring systems and its utilization in practiseKukla, Zdeněk January 2008 (has links)
This master’s thesis is dealing with remote measuring systems and their utilization in power engineering. In the first part there are described requirements on an autonomous measuring system and description of AMM and AMR systems. Communicating and data flows working on accurately defined communicating layers are also depicted in this part. The attention is devoted to the possibility of data processing and functions of devices offered by these attributes. In the following part there are described reasons for utilization of remote measuring systems in power engineering and the main advantages of connection of more devices into one unit. After finding of required parametres and functions of systems, a suggestion of terminal device is created in the same way. The suggestion is described in the measuring part with A/D converter, processing in microprocessor, measuring and evaluating alogorithms and attributes of communication of bus used. The last part is devoted to utilization of remote analysis in small power stations in dispersed production. Formation of deformation of voltage, harmonic analysis of signal and its application for data processing are described there. Described analysis was tested on data acquired from a cogeneration unit.
|
142 |
Analýza vyvedení elektrického výkonu v městské zástavbě / Analysis ofelectrical output from the power plat working in the middle of townHrubý, Radek January 2012 (has links)
The work focuses on outlet of the electrical power from power plants operating in urban areas. After a short analysis of the general possibility of leading out electric power from power plants of various types, thesis continues to describe of outlet electrical power from PPC Červený Mlýn. Subsequently, are calculated short-circuit conditions in the main switching station. It follows an analysis of power lines. The last part dealt with the issue of reliability of sources in connection with random transition processes in the electrical network and the light of the operational reliability of electrical power equipment.
|
143 |
Vícevodičový model komunikace po venkovním elektrickém vedení / Multi-Conductor Model of Communication over Outdoor Power LinesFranek, Lešek January 2017 (has links)
PLC - power line communication is not new. It has been known for many years. But It never be used in massive scale. There were only sporadic applications, for example ripple control system HDO used in the Czechoslovakia. PLC currently experiencing a renaissance thanks to the advent of Smart Grid. PLC offering relatively low bit rates and relatively unreliable transmission, but these disadvantages compensates very low costs to build a communication infrastructure and it offers specific functionalities for Smart Grid. The question is whether the declared parameters will be met in the real world. This thesis tries to find an answer.
|
144 |
Ömsesidig koppling mellan parallellgående friledningar / Inductive Coupling Between Parallel Overhead Power LinesOrrevad, Gustav January 2015 (has links)
Parallellgående kraftledningar inducerar spänning i varandra som i sin tur driver en ström. I denna rapport utreds hur osymmetriska kortslut-ningar på en kraftledning påverkar strömmen i en parallellgående kraft-ledning på grund av ömsesidig induktion och vilka faror inducerad spän-ning och den av inducerade spänningen drivna strömmen kan leda till, ur hänsyn till leveranssäkerhet samt underhållsarbetare på parallell kraft-ledning.Målet med examensarbetet är att öka noggrannheten för felströmsberäk-ningar på Vattenfalls elnät samt att öka kunskapen för vattenfallpersonal om fenomenet av ömsesidig koppling och de faror den kan innebära.Rapporten kunde konstatera att ömsesidig koppling kan leda till faror för leveranssäkerheten av elnätet och att det finns ett behov av analys av specifika fall av parallella kraftledningar i Vattenfalls elnät. / Parallel overhead power lines induce voltage in one another, which in turn drives a current. In this report an investigation is made in how asymmetrical short circuits on an overhead power line influence the cur-rent in a parallel overhead power lines due to the inductive coupling be-tween the power lines and which hazards it can cause for the electrical delivery dependability as well as high voltage workers.The aim with this bachelor thesis is to increase the accuracy in fault cur-rent calculation in the Vattenfall electricity grid as well as to increase the knowledge within Vattenfall of the phenomena of inductive coupling and the hazards which comes with it.The report could ascertain that inductive coupling can lead to danger for electrical delivery dependability and that there exists a need of analysis on specific parallel overhead power lines within the Vattenfall electricity grid.
|
145 |
Various resource allocation and optimization strategies for high bit rate communications on power linesSyed Muhammad, Fahad 17 March 2010 (has links) (PDF)
Ces dernières années, le développement des réseaux de communication indoor et outdoor et l'augmentation du nombre d'applications conduisent à un besoin toujours croissant de transmission de données à haut débit. Parmi les nombreuses technologies concurrentes, les communications par courant porteur en ligne (CPL) ont leur place en raison des infrastructures déjà disponibles. La motivation principale de cette thèse est d'augmenter le débit et la robustesse des systèmes CPL à porteuses multiples afin qu'ils puissent être utilisés efficacement dans les réseaux domestiques et pour la domotique. Le thème de ce travail de recherche est d'explorer différentes approches de modulation et de codage de canal en liaison avec plusieurs schémas d'allocation et d'optimisation des ressources. L'objectif est ici d'améliorer les capacités des CPL et d'être concurrent face aux autres solutions de communication à haut débit et de faire face efficacement aux inconvénients inhérents au réseau d'alimentation. Un certain nombre de stratégies d'allocation des ressources et d'optimisation sont étudiées pour améliorer les performances globales des systèmes CPL. La performance d'un système de communication est généralement mesurée en termes de débit, de marge de bruit et de taux d'erreur binaire (TEB) de la liaison. La maximisation de débit (RM) est étudiée pour les systèmes OFDM (en anglais orthogonal frequency division multiplexing) et LP-OFDM (en anglais linear precoded OFDM) sous la contrainte de densité spectrale de puissance (DSP). Deux contraintes différentes de taux d'erreur ont été appliquées au problème RM. La première contrainte est la contrainte de TEB crête où toutes les sous-porteuses ou séquences de précodage doivent respecter le TEB cible. Avec la deuxième contrainte, contrainte de TEB moyen, différentes sous-porteuses ou séquences de précodage sont affectées par des valeurs différentes de TEB et une contrainte de TEB moyen est imposée sur le symbole complet OFDM ou LP-OFDM. Les algorithmes d'allocation sont également proposés en prenant en compte les gains de codage de canal dans le processus d'allocation des ressources. En outre, un nouveau schéma de minimisation de TEB moyen est introduit qui minimise le TEB moyen de systèmes pour un débit donné et un masque imposé de DSP. Pour l'allocation des ressources dans un système à porteuses multiples, il est généralement supposé que l'état du canal (CSI) est parfaitement connu par l'émetteur. En réalité, les informations de CSI disponibles au point d'émission sont imparfaites. Aussi, nous avons également étudié des schémas d'allocation des ressources dans le cas de systèmes OFDM et LP-OFDM en prenant compte, et de manière efficace, les impacts des estimations bruitées. Plusieurs chaînes de communication sont aussi développées pour les systèmes OFDM et LP-OFDM.
|
Page generated in 0.0441 seconds