• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • Tagged with
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Production ramp-down strategy : Optimisation of production ramp-down at Scania Engine Assembly

Otteblad, Gustav, Svensson, Jakob January 2022 (has links)
In the light of the increasing demands and competition in the automotive industry to rapidly introduce new products to the market, management of production ramp-ups and production ramp-downs has become a new decisive competitive factor. For this reason, a well-designed strategy has become essential to succeed. For Scania Engine Assembly, this novel challenge is underway in the form of a ramp-down of the old assembly line (DL) and simultaneous ramp-up of the new assembly line (DW). This is to deliver the new and more sustainable engine platform Super. DL consists of a basic assembly and a final assembly (TMS-line), where the latter was the focus of this thesis project. Since the transition is already put in motion, there is an urgent need for the establishment of a production ramp-down strategy stretching until the complete transition. Therefore, this project was initiated to develop an optimal strategy of the production ramp-down with regard to interconnected projects and functions, as well as to the factors of economics, efficiency, ergonomics, and quality. The project also aimed to establish an ideal project progression regarding the management and implementation of the strategy. Considering that the TMS-line involves 59 workstations, more than 200 personnel daily, 10 engine types with unique variants, different technical systems, and must align with multiple operational functions, a comprehensive and considered strategy was essential. An additional objective was to reduce the gap in research between production ramp-up and production ramp-down. Although, the interest of production ramp-up has increased considerably in the last two decades, that of production ramp-down still remains widely neglected, despite their similar importance. Hence, the project aimed not only to contribute to Scania, but also to contribute with empirical data to future research in production ramp-down. Altogether, the reduction in the research gap can contribute to more sustainable production systems. To achieve the project objective and aims, a substantial literature review was conducted and a wide array of scientific methods were used. The literature review established a basis for the project, and brought theories from multiple languages and standpoints together to culminate in a comprehensive understanding of production ramp-down. The scientific methods were used to gather empirical data and to design the strategy. In addition, relevant expertise was incorporated throughout the project by a continuous cooperation with Scania employees of different roles and specialisations. The project also followed Scania’s change process to facilitate the realisation of the strategy. In total, three distinctive strategy concepts were generated and evaluated, called Alpha, Beta, and Gamma. Then, after a systematic evaluation process, a combination of Alpha and Gamma was designed in detail to form the final strategy. The strategy can be described as a stepwise capacity reduction. The first step is the planning and preparation for the necessary competence shift, organisational changes, and technical solutions. In the second step, a new takt and work standard corresponding to 50% capacity is implemented. Also, a decision regarding the final production years is made to either offshore production, change layout, or continue without change. The third step involves major structural changes in the form of a new organisational structure and the implementation of a technical solution for a permanent 50% capacity reduction. Similarly, in the fourth step, the technical solution is adjusted and a new work standard is implemented to correspond to a 33% capacity need. The fifth step regards the phase-out of the TMS-line, which completes the transition between DL and DW. Finally, the sixth step includes the revitalisation of the freed-up operational area and recycling of production equipment and materials. Altogether, the strategy ensures an optimal production ramp-down of the TMS-line with regard to interconnected projects, functions, and factors. To ensure the success of the strategy, recommendations in management and implementation of the strategy were established based on research and empirical findings. The result is an optimal strategy that fulfils the objective and aims, and contributes with new empirical findings and recommendations for future research in production ramp-down and connected research fields. / Med bakgrunden av det ökande kraven och konkurrensen i fordonsindustrin att snabbt introducera nya produkter till marknaden, har ledning av produktionsupprampningar och produktionsnedrampningar blivit en ny avgörande konkurrensfaktor. För att lyckas med denna ledning krävs en välutvecklad strategi. För Scania motormontering pågår denna nya utmaning i formen av en nedrampning av den gamla monteringslinan (DL) och samtida upprampning av den nya monteringslinan (DW). Detta genomförs för att leverera den nya och mer hållbara motorplattformen Super. DL består av en grundmontering och en slutmontering (TMS-line), där den sistnämnda utgör fokus i detta examensarbete. Eftersom övergången redan är i gång finns det ett brådskande behov för utformningen av en produktionsnedrampningsstrategi som sträcker sig fram till den fullständiga övergången. Därför initierades detta projekt för att utveckla en optimal strategi för produktionsnedrampningen med hänsyn till sammankopplade projekt och funktioner, likväl till ekonomi, effektivitet, ergonomi och kvalitet. Projektet ämnade även till att utforma en idealisk projektprogression gällande styrning och implementering av strategin. Då TMS-line involverar 59 arbetsstationer, över 200 operatörer dagligen, 10 motortyper med unika varianter, olika tekniska system, och måste anpassas till flera operationella funktioner, krävdes en heltäckande och genomtänkt strategi. Ett ytterligare mål var att minska forskningsgapet mellan produktionsupprampning och produktionsnedrampning. Även om intresset för produktionsupprampning har ökat avsevärt de senaste två decennierna, frånses produktionsnedrampning fortfarande trots deras liknande betydelse. Därför ämnade projektet inte bara till att bidra till Scania, men också till att bidra med empirisk data till framtida forskning inom produktionsnedrampning. Sammantaget kan minskningen av forskningsgapet bidra till mer hållbara produktionssystem. För att uppnå projektets syfte och mål utfördes en omfattande litteraturstudie och olika vetenskapliga metoder användes. Litteraturstudien upprättade en grund för projektet, och sammanförde teorier från flera språk och perspektiv för att ge en heltäckande förståelse av produktionsnedrampning. De vetenskapliga metoderna användes till att samla empirisk data och designa strategin. Dessutom integrerades relevant expertis genom hela projektet genom ett kontinuerligt samarbete med anställda på Scania med olika roller och specialiseringar. Projektet följde även Scanias förändringsprocess för att underlätta implementeringen av strategin.  Totalt skapades och utvärderades tre distinkta strategikoncept: Alfa, Beta, och Gamma. Efter en systematisk utvärderingsprocess designades en kombination av Alfa och Gamma i detalj till att utforma den slutliga strategin. Strategin kan beskrivas som en stegvis kapacitetsreducering. Det första steget utgör planeringen och förberedelsen gällande kompetensskifte, organisatoriska förändringar, och tekniska lösningar. I det andra steget implementeras en ny takt och arbetsstandard motsvarande 50 % kapacitet. Dessutom görs ett beslut gällande de sista produktionsåren att antingen flytta produktion utomlands, ändra layout, eller fortsätta utan förändring. Det tredje steget involverar stora strukturella förändringar i formen av en ny organisatorisk struktur och implementeringen av en teknisk lösning för en permanent kapacitetreducering på 50 %. I det fjärde steget justeras den tekniska lösningen och en ny arbetsstandard implementeras motsvarande ett kapacitetsbehov på 33 %. Det femte steget berör utfasningen av TMS-line vilket slutför övergången mellan DL och DW. Slutligen inkluderar det sjätte steget vitaliseringen av den frigjorda operationella ytan och återvinningen av produktionsutrustning och material. Sammantaget säkerställer strategin en optimal produktionsnedrampning av TMS-line med hänsyn till sammankopplade projekt, funktioner och faktorer. För att säkerställa strategins framgång upprättades rekommendationer i styrning och implementering baserat på forskning och empiriska fynd. Resultatet är en optimal strategi som uppfyller syfte och mål, samt bidrar med nya empiriska fynd och rekommendationer till framtida forskning i produktionsnedrampning och relaterade forskningsfält.

Page generated in 0.0983 seconds