11 |
Projektový management / Project managementKollmann, Ladislav January 2017 (has links)
The master thesis is focused on the topic Project Management. In the theoretical part the literary research is elaborated. The practical part of the thesis provides an analysis of the current state of the project company ZETOR TRACTORS a.s.. On the basis of knowledge of the system, the arrangements are proposed to improve it.
|
12 |
Shop floor management / Shop Floor ManagementHalamíček, Matěj January 2020 (has links)
This thesis focuses on analysis and improvement of the process of production order. The solution is implementation of Shop floor management system in a production workshop. It is presented as a project based on analysis of the company and the order process. The project consists of a draft of implementation during continuous operations and costs calculation for implementation of the system.
|
13 |
Posouzení informačního systému firmy a návrh změn / Assessment of Information System for a Company and Proposal for AmendmentsGajdoš, David January 2010 (has links)
This dissertation is aimed to analyze current status of the company information system, to reveal it's weak points, then to explore theoretical possibilities of a solution and finally to design a new solution of information system.
|
14 |
Řízení projektů výrobních zakázek / Project Management of Production OrdersFiala, Ivo January 2016 (has links)
The Diploma thesis deals with process improvements in project management in Alstom Power s.r.o.. The thesis is divided into three basic parts - theoretical, analytical and proposal part. The theoretical part focuses on the description of the analytical methods for examining the business environment, which will afterwards be used to analyse the current state of a company's position in the second part, analytical part, of this work. In the analytical part are identified the same errors during the project implementation. In the last part of the own proposals are presented measures that could eliminate errors and streamline process of the project implementation.
|
15 |
Řízení projektů výrobních zakázek / Project Management of Production OrdersFiala, Ivo January 2016 (has links)
The Diploma thesis deals with process improvements in project management in Alstom Power s.r.o.. The thesis is divided into three basic parts - theoretical, analytical and proposal part. The theoretical part focuses on the description of the analytical methods for examining the business environment, which will afterwards be used to analyse the current state of a company's position in the second part, analytical part, of this work. In the analytical part are identified the same errors during the project implementation. In the last part of the own proposals are presented measures that could eliminate errors.
|
16 |
Návrh změny podnikového procesu / Proposal for Change in the Company ProcessNováková, Johana January 2017 (has links)
This thesis deals with problems of process management in a field of savings identification with the goal of an analysis of a chosen process and creation of a proposal for current status improvement from a point of effectivity. It describes process management, process modeling and improvement and project management. Further it presents a current status of the process, project logic frame, net analyzis and risk identification. Finally it shows a map of future proces with an identification of weak points and suggestions for improvement for an organization to improve state of the field of savings identification.
|
17 |
Aperfeiçoamento de um mecanismo sulcador para plantio direto de mandioca / Improvement of the furrow opener device of cassava planters to no-tillageFey, Emerson 23 October 2010 (has links)
In the cassava production the conventional tillage, characterized by soil preparation with intensive mobilization, is commonly used. However, when this practice results in the maintenance of small quantities of straw on the soil surface, the erosion becomes imminent, and it is exacerbated by the spacing and slow initial development of this culture, especially until four months after planting. An alternative is the no-tillage system, a type of conservation tillage, in which only the owing/planting furrow is prepared for the deployment of culture, and is widely used in soybean, corn, wheat,
beans, and others crops. For cassava, the adoption of this system has raised many questions on the basis of the soil physical properties recommended, according to which the crop requires well-drained and loose soils to allow the proper root development, where the carbohydrates produced by the plant are stored. It is believed that the deployment of a larger soil area in furrow may facilitate the proper development of cassava in no-tillage system and promote the soil protection due the maintenance of straw on the surface. In this context, the objective is improve the furrow opener device of cassava planters using the precepts of the agricultural machinery development process, with the intent of provide the cultivation of cassava in no-tillage system. For the furrow opener development it were implemented the informational, preliminary and detailed design phases of the product development process. It where formulated for the task of preparing the planting furrow, 31 needs of customers who were deployed in 30 customer requirements and then in 27 design requirements. From these requirements and the solutions available on other agricultural machines and implements, the winged tines where selected as a potential
solution. So, a layout study where conducted and resulted in the construction of prototypes with different geometries to experimentation with cassava crop and tests
of forces. The use of the reference model for the development process of agricultural machinery allowed the development of furrow opener device for the cultivation of
cassava in no-tillage system, that have low cost, small number of components, simple manufacturing process and smooth operation. The yield obtained with the cassava crop in conventional tillage and no-tillage was similar, showing that this technique can be used to grow without com / No sistema de produção da mandioca o preparo convencional do solo (intenso revolvimento) é comumente utilizado. Quando esta prática resulta na manutenção de pequenas quantidades de palha sobre o solo, o problema da erosão se torna
eminente e é agravado pelo espaçamento entre linhas e o lento desenvolvimento inicial desta cultura, principalmente até os quatro meses após o plantio. Uma alternativa é o sistema plantio direto, em que apenas o sulco de semeadura/plantio é
preparado durante a implantação da cultura, e é largamente utilizado nas culturas de soja, milho, trigo, feijão, entre outras. Para a mandioca, a adoção deste sistema tem
gerado muitas dúvidas em função das condições físicas do solo recomendadas, segundo as quais a cultura requer solos bem drenados e soltos para possibilitar o adequado desenvolvimento das raízes. Acredita-se que a mobilização de uma maior área de solo no sulco de plantio possa viabilizar o adequado desenvolvimento da mandioca em sistema plantio direto e favorecer a proteção do solo pela manutenção
da palha sobre superfície. Nesse contexto, objetivou-se aperfeiçoar o mecanismo sulcador de plantadoras de mandioca utilizando os preceitos do processo de desenvolvimento de máquinas agrícolas, com o intento de viabilizar o cultivo de
mandioca em sistema plantio direto. Para o desenvolvimento do mecanismo foram executadas as fases de projeto informacional, preliminar e detalhado. Formularam-se,
para a função de preparar o sulco de plantio, 31 necessidades de clientes que foram desdobradas em 30 requisitos de clientes e posteriormente em 27 requisitos de projeto. A partir destes requisitos e das soluções disponíveis em outras máquinas e implementos, selecionou-se a haste sulcadora alada como potencial solução. Desta forma, realizou-se um estudo de leiautes que culminou na construção de
protótipos com diferentes geometrias para testes, experimentação com a cultura da mandioca e ensaio de esforços. A utilização do modelo de referência para o
processo de desenvolvimento de máquinas agrícolas permitiu o desenvolvimento de uma haste sulcadora alada de baixo custo, pequeno número de componentes, processo de fabricação simples e bom funcionamento. A produtividade obtida com a cultura da mandioca em preparo convencional e sistema plantio direto foi semelhante, evidenciando que esta técnica pode ser utilizada para o cultivo sem comprometer a produtividade e ainda melhorar a sustentabilidade do sistema.
|
18 |
Posouzení informačního systému firmy a návrh změn / Information System Assessment and Proposal of ICT ModificationHruška, Milan January 2018 (has links)
The content of this diploma thesis is an analysis of the current information system and a proposal for possible system efficiency. The work is divided into three parts. The first is focused on the theoretical starting points explaining the basic concepts used in the diploma thesis. The second part includes company introduction and the analysis of the information system. Based on the analysis of the information system is the last part, which contains the proposal for improving the information system of UXA spol. s r.o.
|
19 |
Nástroj pro podporu managementu zainteresovaných stran / Tool for Project Stakeholder Management SupportHypský, Roman January 2014 (has links)
This master's thesis describes a tool supporting management stakeholders. Opening chapters of the thesis describe the theoretical background of the work. There are explained knowledge-based areas of the stakeholder management, human resource management and communications management. Following chapters of the work are devoted to the proposed system. At first there are specified the system requirements generally and then also from the perspective of several major users. Subsequently, the system is designed. The system consists of three main blocks - the identification of stakeholders, the stakeholder analysis using the questionnaire surveys and the setting of the communication strategy. The implementation environment (Java EE) is chosen and the system is implemented in it. Then its functionality is checked up on the pattern of data. In conclusion, the results achieved are evaluated and the outputs of processes in the field of management stakeholders are also discussed. At the end the future development of this master´s thesis is delineated.
|
20 |
Zhodnocení projektu centralizace vybraných procesů v podniku / Project Evaluation of Centralisation of Chosen Processes in OrganisationVeselý, Jiří January 2011 (has links)
The diploma thesis focuses on project controls in the company Veolia Voda Česká republika a.s. It analyses and evaluates specific project, which is already running in the company and on the basis of acquired data it is seeking to optimalise the preparation of another project. It contents many of comparisions and evaluations, which should be helpful for the company´s management.
|
Page generated in 0.0725 seconds