391 |
Study on renovation of old industrial zone: renovation of Nanyou industrial zone Shenzhen, ChinaLi, Rui, 李蕊 January 2008 (has links)
published_or_final_version / Urban Design / Master / Master of Urban Design
|
392 |
Reprogramming historic industrial area as urban catalyst: a design strategy for Hanyang steel works in WuhancityLee, Sophia January 2008 (has links)
published_or_final_version / Urban Design / Master / Master of Urban Design
|
393 |
Impacts of urban renewal on the local community of Hong KongLau, Chui-yu, 劉釗如 January 2009 (has links)
published_or_final_version / Housing Management / Master / Master of Housing Management
|
394 |
Urban village reformation study: the Dachong village case, Shenzhen, China劉偉榮, Liu, Weirong. January 2009 (has links)
published_or_final_version / Urban Planning and Design / Master / Master of Urban Design
|
395 |
Urban redevelopment and urban form transformation in Hong Kong: a sustainable development perspective簡嘉露, Kan, Ka-lo. January 2009 (has links)
published_or_final_version / Urban Planning and Design / Master / Master of Science in Urban Planning
|
396 |
Redevelopment of old industry area along grand canal in Hang Zhou: urban design for Gongchen BridgeDistrict牟筱琛, Mou, Xiaochen, Cindy. January 2009 (has links)
published_or_final_version / Urban Planning and Design / Master / Master of Urban Design
|
397 |
The investigation of models to identify and quantitate human epidermal stem cellsHackett, Lucy Ann January 2000 (has links)
No description available.
|
398 |
Accommodating change: the historical centre of inner-city JohannesburgKeeling, Candice 18 June 2009 (has links)
In this thesis, the significance and best use of a site within the historical centre of inner-city Johannesburg is explored.
The site covers a city block and lies across the road from the Square on which the City Hall (housing the offices of the
Gauteng Provincial Legislature) is situated. The ‘Barbican’ - an important heritage building - occupies part of the site,
the remainder being vacant.
Both the site and the Square opposite it are situated within a twenty-four city block precinct which has undergone
considerable change since it first came into being one hundred and twenty-two years ago. These changes (particularly
those within the Square) have become relevant in the history and character of the precinct, and have been examined in
order to place the site into its context and to gain an insight into how and why it may be developed.
Changes that have had a substantial effect on the precinct allow its history to be roughly divided into four ‘Eras’. The
first of these being ‘Market Square’ (1886 – 1935) which relates to the first developments within the precinct - the
changes that made ‘a camp’ into a city. The second era is that of ‘Library Gardens’ (1935 – 1991) which details the
changes that occurred after a library was built on the Western side of the Square and the effect of this on it. The third
era is the ‘Civic Spine’ (1991 – 1994) which illustrates an attempt by the city to reactivate the precinct and the structures
that were built to facilitate this. The fourth era is the ‘Provincial Government Precinct’ (1994 – to date), which
deals with the conversion of the City Hall into the offices of the Gauteng Provincial Legislature and the changes that
are currently occurring in the precinct.
The four eras were used to provide an historical context for three layers of urban interconnection that may be found
within the precinct and include: history, urban space and public place. History explores the ‘past’ of the site; Urban
Space concerns the types of space that were created, being based on the urban theory of the time; and Public Place
involves occupation of the spaces by the public which resulting in these spaces becoming places and therefore destinations.
The results of this investigation were used in the creation of one structure and the conversion of another that will best
utilise the site and benefit the precinct in which it is located.
The programme that is now outlined comprises a convention centre, gallery and a hotel. The convention centre may
be used for both local and provincial government functions, as well as those required by the private sector, given that
few (and inadequate) facilities exist at this time within the inner-city. The gallery will depict the numerous changes that
are described; the hotel to accommodate conference delegates and others.
After the programme has been provided, the results of an exploration of convention centres and their chief components
is related. In addition, the historical building – ‘The Barbican’ is situated (in one corner of the site) and raises the
relevance of historical conservation. Elements in the construction of a new convention centre on the site and ways in
which the Barbican may be used to connect the old with the new are taken into consideration.
|
399 |
Revitalization of Nga Tsin Wai.January 1999 (has links)
Chan Kwok Ho Terence. / "Architecture Department, Chinese University of Hong Kong, Master of Architecture Programme 1998-99, design report." / Includes bibliographical references (p. 69-71 ). / Chapter 1.0 --- Evolution of the Program / Chapter 1.1 --- Urbanization of Hong Kong / Chapter 1.2 --- Nga Tsin Wai Scenario / Chapter 1.3 --- Community Studies and Mode of Change in Neighborhood / Chapter 1.4 --- Deficiencies / Chapter 1.5 --- Hypothesis / Chapter 2.0 --- Research / Chapter 2.1 --- Current approaches in urban renewal / Chapter 2.2 --- Current urban high-rise residential architecture / Chapter 2.3 --- Urban Parasite: Illegal Facade / Chapter 2.4 --- The Old Community Sense / Chapter 2.5 --- Village Studies / Chapter 3.0 --- Background and Contextual Analysis / Chapter 3.1 --- Location and Present Situation / Chapter 3.2 --- History / Chapter 3.3 --- Existing Land Use / Chapter 3.4 --- Demographic Data / Chapter 3.5 --- Layout of the Village / Chapter 3.6 --- Environmental Conditions / Chapter 3.7 --- Buildings of the Village / Chapter 3.8 --- Rituals and Village Festival / Chapter 3.9 --- Nearby Villages / Chapter 3.10 --- Different Lanes Condition / Chapter 3.11 --- Vacant & Tenant Condition / Chapter 4.0 --- Design Program / Chapter 4.1 --- Scenario / Chapter 4.2 --- Planning Elements / Chapter 4.3 --- Schedule of Accommodation / Chapter 4.4 --- Opportunities and Constraints / Chapter 4.5 --- Space Relationship Diagram / Chapter 5.0 --- Process / Chapter 6.0 --- Final Product / Appendix / Chapter A0 --- Precedent Study on Kwong Yuen Estation / Chapter A1 --- Precedent Study on Byker Wall / Chapter A2 --- Program reference (LDC proposed project) / Chapter A3 --- Interview with the Village Heads / Notes and Glossary / Bibliography
|
400 |
Society's playgroundStelli, Jenna Chantal 01 July 2009 (has links)
No abstract
|
Page generated in 0.0514 seconds