• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • 1
  • Tagged with
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Research on the Financial Model That Promotes Participation in Public Works by the Private Sector ¡V Taking Kaohsiung International Youth Hostel as an Example

- Guey, Mei 22 August 2005 (has links)
Abstract According to the idea held by the government, ¡§government has limited resources but the private sector has limitless power,¡¨ the Executive Yuan established and promulgated the enactment, ¡§Promoting the Participation by the Private Sector in Public Works,¡¨ in February 2000. This is a policy that depends on the vitality and capital funds of the private sector to be incorporated for use in a timely manner. This has brought positive meanings and benefits in enhancing government performance, reducing government financial burdens, speeding up the construction of public works, improving the quality of public works and services, and promoting economic growth. The scope and target of this dissertation is the process of planning to regard Kaohsiung International Youth Hostel as a dormitory facility of Kaohsiung Chung-Hwa School of Arts. It is expected, with the investigation of this case, to study how to harmony with related existing laws and regulations, analyze the burdens and favors taken by the participants under various situations, and examine the feasibility of its¡¦ cooperation so that unused government assets, in agreement with the original purpose of such assets, can be fully utilized, enthusiastic artists can have a comfortable housing environment and field where they can exchange art, facilitate the art prosperity in the Fine Arts Museum neighborhood, and then bring in commercial opportunity to help local economic development. Moreover, through this case study, it aims to provide government offices concerned with valuable figures when they conduct related operations so that when executing plans of the same essence, the office-in-charge can achieve more economic benefits and policy objectives. This dissertation used ROT mode to introduce the resources of the private sector into the operation of public works, which will effectively solve the difficulty that government has no choice but to implement the operation of public works even under financial deficits. As a consequence, public works would not fall idle in the wake of short government finances and lack of professional operation, and the public would be encouraged to advocate the plan to recycle and to reuse the unused public works so as to achieve energy conservation and the prospect for the sustainable development of Earth. Through sensitivity analysis on the changes in key parameters, this dissertation has clearly noticed the increase and decrease in various hypotheses and parameters, and will present different effects and evaluate the variable effects of all the parameters. Before it is executed, the effects and impact that may be caused by government, chartered companies, students, and banks should be considered. Before the plan is implemented, risk control measures should be formulated according to the results of sensitivity analysis.
2

Research on the System Safety Management in Urban Railway

Luong, Tuan Anh 12 January 2023 (has links)
Nowadays, rail transport has become one of the most widely utilised forms of transport thanks to its high safety level, large capacity, and cost-effectiveness. With the railway network's continuous development, including urban rail transit, one of the major areas of increasing attention and demand is ensuring safety or risk management in operation long-term remains for the whole life cycle by scientific tools, management of railway operation (Martani 2017), specifically in developed and developing countries like Vietnam. The situation in Vietnam demonstrates that the national mainline railway network has been built and operated entirely in a single narrow gauge (1000mm) since the previous century, with very few updates of manual operating technology. This significantly highlights that up to now, the conventional technique for managing the safety operation in general, and collision in particular, of the current Vietnamese railway system, including its subsystems, is only accident statistics which is not a scientific-based tool as the others like risk identify and analyse methods, risk mitigation…, that are already available in many countries. Accident management of Vietnam Railways is limited and responsible for accident statistics analysis to avoid and minimise the harm caused by phenomena that occur only after an accident. Statistical analysis of train accident case studies in Vietnam railway demonstrates that, because hazards and failures that could result in serious system occurrences (accidents and incidents) have not been identified, recorded, and evaluated to conduct safety-driven risk analysis using a well-suited assessment methodology, risk prevention and control cannot be achieved. Not only is it hard to forecast and avoid events, but it may also raise the chance and amount of danger, as well as the severity of the later effects. As a result, Vietnam's railway system has a high number of accidents and failure rates. For example, Vietnam Rail-ways' mainline network accounted for approximately 200 railway accidents in 2018, a 3% increase over the previous year, including 163 collisions between trains and road vehicles/persons, resulting in more than 100 fatalities and more than 150 casualties; 16 accidents, including almost derailments, the signal passed at danger… without fatality or casual-ty, but significant damage to rolling stock and track infrastructure (VR 2021). Focusing and developing a new standardised framework for safety management and availability of railway operation in Vietnam is required in view of the rapid development of rail urban transport in the country in recent years (VmoT 2016; VmoT 2018). UMRT Line HN2A in southwest Hanoi is the country's first elevated light rail transit line, which was completed and officially put into revenue service in November 2021. This greatly highlights that up to the current date, the UMRT Line HN2A is the first and only railway line in Vietnam with operational safety assessment launched for the first time and long-term remains for the whole life cycle. The fact that the UMRT Hanoi has a large capacity, more complicated rolling stock and infrastructure equipment, as well as a modern communica-tion-based train control (CBTC) signalling system and automatic train driving without the need for operator intervention (Lindqvist 2006), are all advantages. Developing a compatible and integrated safety management system (SMS) for adaption to the safety operating requirements of this UMRT is an important major point of concern, and this should be proven. In actuality, the system acceptance and safety certification phase for Metro Line HN2A prolonged up to 2.5 years owing to the identification of difficulties with noncompliance to safety requirements resulting from inadequate SMS documents and risk assessment. These faults and hazards have developed during the manufacturing and execution of the project; it is impossible to go back in time to correct them, and it is also impossible to ignore the project without assuming responsibility for its management. At the time of completion, the HN2A metro line will have required an expenditure of up to $868 million, thus it is vital to create measures to prevent system failure and assure passenger safety. This dissertation has reviewed the methods to solve the aforementioned challenges and presented a solution blueprint to attain the European standard level of system safety in three-phase as in the following: • Phase 1: applicable for lines that are currently in operation, such as Metro Line HN2A. Focused on operational and maintenance procedures, as well as a training plan for railway personnel, in order to enhance human performance. Complete and update the risk assessment framework for Metro Line HN2A. The dissertation's findings are described in these applications. • Phase 2: applicable for lines that are currently in construction and manufacturing, such as Metro Line HN3, Line HN2, HCMC Line 1 and Line 2. Continue refining and enhancing engineering management methods introduced during Phase 1. On the basis of the risk assessment by manufacturers (Line HN3, HCMC Line 2 with European manufacturers) and the risk assessment framework described in Chapter 4, a risk management plan for each line will be developed. Building Accident database for risk assessment research and development. • Phase 3: applicable for lines that are currently in planning. Enhance safety requirements and life-cycle management. Building a proactive Safety Culture step by step for the railway industry. This material is implemented gradually throughout all three phases, beginning with the creation of the concept and concluding with an improvement in the attitude of railway personnel on the HN2A line. In addition to this overview, Chapters 4 through Chapter 9 of the dissertation include particular solutions for Risk assessment, Vehicle and Infrastructure Maintenance methods, Inci-dent Management procedures, and Safety Culture installation. This document focuses on constructing a system safety concept for railway personnel, providing stringent and scientific management practises to assure proper engineering conditions, to manage effectively the metro line system, and ensuring passenger safety in Hanoi's metro operation

Page generated in 0.1488 seconds