• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • Tagged with
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Metodval i projekteringsfasen : Bostadshus Ljusbojen 1

Eklund, Johan, Larsson, Emil January 2007 (has links)
<p>This major project in Building Engineering has its focus on inquiring into what methods has been used in the planning process of the residential building</p><p>Ljusbojen 1. This project has been conducted in cooperation with Kadesjös Ingenjörsbyrå AB, an engineering contractor firm which also acts as the property developer. Initially several different general methods for planning residential buildings have been presented. After the methods from the process of building Ljusbojen 1 has been analyzed compared to the general methods presented in part 1. This shows what the determining factors are during the planning process; factors such as cost, quality, time management, know-how and environmental issues. Ljusbojen 1 has been a good building to study as it has a quite rare architecture and is meant to be perceived as a luxurious resident. The building has been divided into several different parts as this is how they are in the presented in offers, also the different parts are more easily analyzed; the parts are: foundation preparation, framework, exterior, rooming complements and installations. The basis of information has been extracted from relevant literature, planning project reports and in-person interviews. As the scope of this project covers a large field work has been concentrated on the most interesting methods. As a general result it can be determined that the building industry has been pressured to develop and try new methods mainly because of new and daring architectures. However, many existing and well known methods are still in use as the companies know that they work and can offer lower price from these.</p>
2

Metodval i projekteringsfasen : Bostadshus Ljusbojen 1

Eklund, Johan, Larsson, Emil January 2007 (has links)
This major project in Building Engineering has its focus on inquiring into what methods has been used in the planning process of the residential building Ljusbojen 1. This project has been conducted in cooperation with Kadesjös Ingenjörsbyrå AB, an engineering contractor firm which also acts as the property developer. Initially several different general methods for planning residential buildings have been presented. After the methods from the process of building Ljusbojen 1 has been analyzed compared to the general methods presented in part 1. This shows what the determining factors are during the planning process; factors such as cost, quality, time management, know-how and environmental issues. Ljusbojen 1 has been a good building to study as it has a quite rare architecture and is meant to be perceived as a luxurious resident. The building has been divided into several different parts as this is how they are in the presented in offers, also the different parts are more easily analyzed; the parts are: foundation preparation, framework, exterior, rooming complements and installations. The basis of information has been extracted from relevant literature, planning project reports and in-person interviews. As the scope of this project covers a large field work has been concentrated on the most interesting methods. As a general result it can be determined that the building industry has been pressured to develop and try new methods mainly because of new and daring architectures. However, many existing and well known methods are still in use as the companies know that they work and can offer lower price from these.