1 |
Problem specific heuristics for group scheduling problems in cellular manufacturingNeufeld, Janis Sebastian 19 July 2016 (has links) (PDF)
The group scheduling problem commonly arises in cellular manufacturing systems, where parts are grouped into part families. It is characterized by a sequencing task on two levels: on the one hand, a sequence of jobs within each part family has to be identified while, on the other hand, a family sequence has to be determined. In order to solve this NP-hard problem usually heuristic solution approaches are used. In this thesis different aspects of group scheduling are discussed and problem specific heuristics are developed to solve group scheduling problems efficiently. Thereby, particularly characteristic properties of flowshop group scheduling problems, such as the structure of a group schedule or missing operations, are identified and exploited. In a simulation study for job shop manufacturing cells several novel dispatching rules are analyzed. Furthermore, a comprehensive review of the existing group scheduling literature is presented, identifying fruitful directions for future research.
|
2 |
Makespan Minimization in Re-entrant Permutation Flow ShopsHinze, Richard 09 April 2018 (has links) (PDF)
Re-entrant permutation flow shop problems occur in practical applications such as wafer manufacturing, paint shops, mold and die processes and textile industry. A re-entrant material flow means that the production jobs need to visit at least one working station multiple times. A comprehensive review gives an overview of the literature on re-entrant scheduling. The influence of missing operations received just little attention so far and splitting the jobs into sublots was not examined in re-entrant permutation flow shops before. The computational complexity of makespan minimization in re-entrant permutation flow shop problems requires heuristic solution approaches for large problem sizes. The problem provides promising structural properties for the application of a variable neighborhood search because of the repeated processing of jobs on several machines. Furthermore the different characteristics of lot streaming and their impact on the makespan of a schedule are examined in this thesis and the heuristic solution methods are adjusted to manage the problem’s extension.
|
Page generated in 0.0129 seconds