Spelling suggestions: "subject:"safety anda health"" "subject:"safety ando health""
141 |
Stavebně technologický projekt kulturního domu / Constructive-technological project of cultural houseBittmannová, Lenka January 2012 (has links)
This thesis deals with the solution of building technological project Žabčice cultural center. Does the project site equipment, technological prescription for floor construction, roof deck flat roofs and cladding panels locking, time and financial plan of the building, mechanical assembly, EMS plan requirements.
|
142 |
Komplex Moravia Thermal Pasohlávky - stavebně technologický projekt / Constructive-technological project of Komplex Moravia Thermal in PasohlávkyMichlovský, Jiří January 2013 (has links)
This thesis deals with the constructive-technological project of the object "Pool Hall" that is a part of newly built recreational complex. The project includes a technical report, time and financial plan, project construction site equipment, technological specification for monolithic construction, safety principles of construction and building envelope assessment in terms of heat transfer.
|
143 |
Stavebně technologický projekt výstavby polyfunkčního domu v ulici Opuštěná, Brno / CONSTRUCTIVE - TECHNOLOGICAL PROJECT OF BUILDING POLYFUNCTIONAL HOUSE IN OPUSTENA STREET, BRNODražilová, Michaela January 2013 (has links)
Project of master thesis solves brand new residential polyfunctional house with bike shop. The main object is a four-storyed, designed as a monolithic skeleton construction. The building is located in Opuštěná Street, Brno. The project is developed on the basis of project documentation and technical data, delivered by the designer in the behalf of investor requirements. Main goal of this project seeks to approach to real solution of the construction site. It is very important to compare also financial aspects, not only the technological. Last but not least, time requirements of construction plan and factual requirements of the customer. Constructive-technological project contains especially: technical report, site facilities, technologic regulation, schedule, financial budget, control and test plan, design of machinery, safety and health protection etc.
|
144 |
Stavebně technologický projekt polyfunkčního domu / Constructive technological project of block of flats in BrnoSzmeková, Michaela January 2015 (has links)
Final thesis deals with the structural and technological project of block of flats in Brno. Deal with division building construction and engineering structures, machineries, project schedule and financial plan. It is further focused on the rough construction of the main building structure, where processing technological study of the construction, project schedule, the project site equipment, budget and other documents that are necessary for the correct realization of construction.
|
145 |
Nemocnice v Pardubicích - příprava a organizace přístavby pavilonu / Hospital in Pardubice - preparation and organization of extension PavilionZáleský, Martin January 2015 (has links)
This thesis discusses the preparation and organization of the extension construction of multi-purpose Pavilion in Pardubice hospital. The thesis contains a summary accompanying technical report, technical regulations for CFA piles and contact insulation system. Those 3 regulations have developed inspection and test plans. Next parts od the work are time schedule and an itemized budget of the pavilion, time and financial plan of the whole building, Occupational safety and health instructions, environmental issues during the construction, design of mechanical set, system of construction site project. There is also noise study made during the implementation of the construction of the pavilion. Finally there is also situation of construction, CFA pilot implementation scheme and contract.
|
146 |
Stavebně technologický projekt bytového domu v Brně / Architectural and technological project of a residential building in BrnoMalaník, Jan January 2015 (has links)
The thesis contains analysis earthworks, foundations, carcass substructure of residential house on the street Kopečná 9 in Brno. The work also includes gradual changes in site equipment, detailed schedule of work for selected works, rough schedule of the whole building, construction budget, site equipment budget and details of construction. Specialization in the work addresses the specific use of roads and traffic signs.
|
147 |
Stavebně technologický projekt polyfunkčního domu v Brně / Construction technological project of multifunctional buildingBravenec, Jan January 2015 (has links)
This thesis deals with the solution of building technological project multifunctional building Smetanova 19, Brno. Does the project site equipment, technological prescriptions for subset construction and financial plan of the building, mechanical assembly, plan ecology and BOZP.
|
148 |
Chráněné bydlení Rajhrad - stavebně technologický projekt / Sheltered housing Rajhrad - construction technology projectKubišová, Jana January 2016 (has links)
The aim of thesis is construction-technology project of sheltered housing in Rajhrad. Parts of the thesis are technical report of site facilities, technological prescription for monolithic ceiling construction, inspection and test plan for monolithic ceiling construction, proposal of mechanical assemblies and transport relations, occupational safety and health, environmental plan, compared of monolithic and prefabricated staircases, the draft contract for work and binding rules for use of the building, financing construction cost, schedule.
|
149 |
Stavebně technologický projekt bytového domu v Boskovicích / Construction technological project of apartment block in BoskoviceProcházková, Šárka January 2016 (has links)
Content of this master‘s thesis is construction technological project of apartment block in Boskovice. The masters’s thesis contains technical report of the building, suggested construction site installations, proposal of suitable machines and mechanisms required for construction, further it solves wider relations of transport lines to construction site, budget and time schedule. Detailed procedure of assembly of the load-bearing roof truss and the roof sheathing is provided in specifications. Safety and health protection, control and test plans are elaborated for stage of the building roofing.
|
150 |
Skladová hala v Šakvicích - stavebně technologický projekt / Warehouse in Šakvice - construction technological projectKnotek, Vít January 2016 (has links)
Main goal of this thesis is effective design and comprehensible description of the assembly of reinforced concrete skeleton warehouse in Šakvice. In several chapters of this thesis is for preparing of this investor´s plan solved supplies prefabricated components. As well as their assembly into construction, equipment of construction site, used technologies, quality control and safety of performed works. There is great emphasis on the construction budget and its chronology. The aim was to use the rapid progress of construction of the supporting skeleton, taking into account the financial coast of the proposed technology.
|
Page generated in 0.0505 seconds