Analytic Evaluation of the Expectation and Variance of Different Performance Measures of a Schedule under Processing Time VariabilityNagarajan, Balaji 27 February 2004 (has links)
The realm of manufacturing is replete with instances of uncertainties in job processing times, machine statuses (up or down), demand fluctuations, due dates of jobs and job priorities. These uncertainties stem from the inability to gather accurate information about the various parameters (e.g., processing times, product demand) or to gain complete control over the different manufacturing processes that are involved. Hence, it becomes imperative on the part of a production manager to take into account the impact of uncertainty on the performance of the system on hand. This uncertainty, or variability, is of considerable importance in the scheduling of production tasks. A scheduling problem is primarily to allocate the jobs and determine their start times for processing on a single or multiple machines (resources) for the objective of optimizing a performance measure of interest. If the problem parameters of interest e.g., processing times, due dates, release dates are deterministic, the scheduling problem is relatively easier to solve than for the case when the information is uncertain about these parameters. From a practical point of view, the knowledge of these parameters is, most often than not, uncertain and it becomes necessary to develop a stochastic model of the scheduling system in order to analyze its performance.
Investigation of the stochastic scheduling literature reveals that the preponderance of the work reported has dealt with optimizing the expected value of the performance measure. By focusing only on the expected value and ignoring the variance of the measure used, the scheduling problem becomes purely deterministic and the significant ramifications of schedule variability are essentially neglected. In many a practical cases, a scheduler would prefer to have a stable schedule with minimum variance than a schedule that has lower expected value and unknown (and possibly high) variance. Hence, it becomes apparent to define schedule efficiencies in terms of both the expectation and variance of the performance measure used. It could be easily perceived that the primary reasons for neglecting variance are the complications arising out of variance considerations and the difficulty of solving the underlying optimization problem. Moreover, research work to develop closed-form expressions or methodologies to determine the variance of the performance measures is very limited in the literature. However, conceivably, such an evaluation or analysis can only help a scheduler in making appropriate decisions in the face of uncertain environment. Additionally, these expressions and methodologies can be incorporated in various scheduling algorithms to determine efficient schedules in terms of both the expectation and variance.
In our research work, we develop such analytic expressions and methodologies to determine the expectation and variance of different performance measures of a schedule. The performance measures considered are both completion time and tardiness based measures. The scheduling environments considered in our analysis involve a single machine, parallel machines, flow shops and job shops. The processing times of the jobs are modeled as independent random variables with known probability density functions. With the schedule given a priori, we develop closed-form expressions or devise methodologies to determine the expectation and variance of the performance measures of interest. We also describe in detail the approaches that we used for the various scheduling environments mentioned earlier. The developed expressions and methodologies were programmed in MATLAB R12 and illustrated with a few sample problems. It is our understanding that knowing the variance of the performance measure in addition to its expected value would aid in determining the appropriate schedule to use in practice. A scheduler would be in a better position to base his/her decisions having known the variability of the schedules and, consequently, can strike a balance between the expected value and variance. / Master of Science
|
2 |
Supervisión y control de obras de edificación bajo los enfoques de Lean Construction y del PMI / Supervision and control of works in building construction under the Lean Construction and PMI approachesCary Teves, Walter Melvin 17 November 2018 (has links)
El propósito de esta investigación consistió en la realización de una propuesta para la implementación de un sistema de gestión para la apropiada supervisión y control de obras de edificación con base en el trabajo colaborativo. El caso de estudio se basó en la construcción de un hotel en el departamento de Cusco. Para ello fue necesario establecer lineamientos para el desarrollo de la propuesta, luego se describió la metodología de gestión y control utilizado por la supervisión de obra. Se realizó la definición de herramientas de gestión y técnicas de control más convenientes para este propósito.
Esta investigación se fundamenta en que la mayor parte de proyectos de edificación son ejecutados descuidando el tiempo, costo, alcance y calidad establecidos; debido a procedimientos inadecuados de supervisión y control. Por otro lado, las controversias y relaciones adversas que se producen entre la supervisión de obra, constructor y cliente, son aspectos que pueden causar impactos significativos en las variables mencionadas.
Esta propuesta permite que la supervisión de obra pueda efectuar la entrega integrada del proyecto mediante el trabajo colaborativo, utilizando la metodología del Valor Ganado para una adecuada gestión, y aplicando la técnica del Last Planner para el apropiado control y monitoreo del cronograma y de las actividades en ejecución. Finalmente, se concluye que la aplicación de las herramientas y metodologías expuestas, posibilitan a la supervisión de obra gestionar y controlar apropiadamente el alcance, el cronograma, los costos y la correcta ejecución de todos los trabajos que se realizan en obra. / The purpose of this investigation was to make a proposal for the implementation of a management system for the proper supervision and control of works in building construction based on collaborative work. The case study focuses on the construction of a hotel located in the Cusco department. This required the establishment of guidelines for the development of the proposal, and then it was described the management and control methodology used by the site supervisors. The most convenient management tools and control techniques for this purpose were defined.
This research is based on the fact that the majority of building projects are executed neglecting the established time, cost, scope and quality due to inadequate supervision and control procedures. On the other hand, controversies and adverse relationships that occur between supervisors, constructor and owner are aspects that can cause significant impacts on the variables mentioned above.
This proposal allows the site supervisors to carry out the integrated project delivery through collaborative work, using the Earned Value Methodology for proper management, and applying the Last Planner technique for proper control and monitoring of the progress of the production activities and protect the stipulated deadline in the project's general schedule. Finally, it is concluded that the application of the exposed tools and methodologies enable the site supervisors properly manage and control the scope, schedule, costs and the correct execution of all the works that are carried out on site. / Trabajo de investigación
|
3 |
Achieving Agile Quality : An Action Research StudyGislén, Mikael January 2016 (has links)