• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 9
  • 2
  • 2
  • 1
  • 1
  • Tagged with
  • 15
  • 15
  • 15
  • 10
  • 9
  • 8
  • 8
  • 8
  • 7
  • 7
  • 7
  • 6
  • 6
  • 6
  • 5
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

The dynamic, resource-constrained shortest path problem on an acyclic graph with application in column generation and literature review on sequence-dependent scheduling

Zhu, Xiaoyan 25 April 2007 (has links)
This dissertation discusses two independent topics: a resource-constrained shortest-path problem (RCSP) and a literature review on scheduling problems involving sequence-dependent setup (SDS) times (costs). RCSP is often used as a subproblem in column generation because it can be used to solve many practical problems. This dissertation studies RCSP with multiple resource constraints on an acyclic graph, because many applications involve this configuration, especially in column genetation formulations. In particular, this research focuses on a dynamic RCSP since, as a subproblem in column generation, objective function coefficients are updated using new values of dual variables at each iteration. This dissertation proposes a pseudo-polynomial solution method for solving the dynamic RCSP by exploiting the special structure of an acyclic graph with the goal of effectively reoptimizing RCSP in the context of column generation. This method uses a one-time “preliminary” phase to transform RCSP into an unconstrained shortest path problem (SPP) and then solves the resulting SPP after new values of dual variables are used to update objective function coefficients (i.e., reduced costs) at each iteration. Network reduction techniques are considered to remove some nodes and/or arcs permanently in the preliminary phase. Specified techniques are explored to reoptimize when only several coefficients change and for dealing with forbidden and prescribed arcs in the context of a column generation/branch-and-bound approach. As a benchmark method, a label-setting algorithm is also proposed. Computational tests are designed to show the effectiveness of the proposed algorithms and procedures. This dissertation also gives a literature review related to the class of scheduling problems that involve SDS times (costs), an important consideration in many practical applications. It focuses on papers published within the last decade, addressing a variety of machine configurations - single machine, parallel machine, flow shop, and job shop - reviewing both optimizing and heuristic solution methods in each category. Since lot-sizing is so intimately related to scheduling, this dissertation reviews work that integrates these issues in relationship to each configuration. This dissertation provides a perspective of this line of research, gives conclusions, and discusses fertile research opportunities posed by this class of scheduling problems. since, as a subproblem in column generation, objective function coefficients are updated using new values of dual variables at each iteration. This dissertation proposes a pseudo-polynomial solution method for solving the dynamic RCSP by exploiting the special structure of an acyclic graph with the goal of effectively reoptimizing RCSP in the context of column generation. This method uses a one-time
2

The international wine supply chain: challenges from bottling to the glass

Mac Cawley, Alejandro F. 27 August 2014 (has links)
Wine companies face two important challenges in their supply chain: the international shipping temperatures and their effect on the perceived quality of the wine and the optimization of the bottling schedule. The wine maker takes special care in producing the best quality product, which is then shipped to the importer/distributor or consumer, generally in non-refrigerated containers at the mercy of the prevailing environmental conditions. The contributions of this work is that it is the first to measure, for a significant period of time, the temperatures along the international wine supply chain and to link them to the specific supply chain processes. This is also the first work that analyzes the effect of shipping temperature on the perceived quality of the product by those who make the purchase decision for importers, restaurants and supermarkets. Results indicate that the wine is very likely to have been exposed to extreme temperatures during shipping. For white wines, tasters are able to detect differences in wines which have been exposed to shipping temperatures and show a preference towards them. For red wines, they are unable to detect differences. Our contribution to the second challenge was the development of a model that produces solutions for the wine bottling lot sizing and scheduling problem with sequence dependent setup times, in an adequate time-frame, which can be implemented by large wineries. We have developed a model and algorithm that produces fast, good and robust solutions for the winery lot sizing and scheduling problem with sequence dependent setup times. We implemented an effective decomposition algorithm that uses the structure of the problem, that can be applied to other families of sequence dependent scheduling and lot sizing problem. Results indicate that the model achieves reductions of 30\% in the total plan costs.
3

Métodos heurísticos construtivos para o problema de programação da produção em sistemas flow shop híbridos com tempos de preparação das máquinas assimétricos e dependentes da seqüência / Construtive heuristic methods for hybrid flow shop scheduling problem with asymmetric sequence dependent setup times

Fuchigami, Hélio Yochihiro 14 February 2005 (has links)
Este trabalho trata do problema de programação de operações no ambiente flow shop com máquinas múltiplas, com seus tempos de preparação (setup) assimétricos e dependentes da seqüência de processamento das tarefas. Este ambiente de produção é comum em indústrias gráficas, químicas, têxteis, de papel e de tinta, caracterizadas por sistemas com amplo mix de produtos. Qualquer processo produtivo requer um gerenciamento eficaz por meio do Planejamento e Controle da Produção (PCP). Esta atividade inclui a programação da produção, ou seja, a alocação de recursos para a execução de tarefas em uma base de tempo. A atividade de programação é uma das tarefas mais complexas no gerenciamento de produção, pois há a necessidade de lidar com diversos tipos diferentes de recursos e atividades simultaneamente. Além disso, o número de soluções possíveis cresce exponencialmente em várias dimensões, de acordo com a quantidade de tarefas, operações ou máquinas, conferindo uma natureza combinatorial ao problema. No ambiente estudado neste trabalho as operações de cada tarefa são executadas em múltiplos estágios de produção, podendo variar a quantidade de máquinas em cada um deles. Cada operação é processada por apenas uma máquina em cada estágio. Os tempos de preparação das máquinas possuem uma variabilidade relevante em função da ordem de execução das tarefas nas máquinas. A função-objetivo considerada é a minimização da duração total da programação (makespan). Foram desenvolvidos quatro métodos heurísticos construtivos com base em algoritmos reportados na literatura para solução de problemas flow shop permutacional e máquinas paralelas no ambiente cujo tempo de setup é dependente da seqüência. Como não foram encontrados na literatura métodos para programação no ambiente tratado neste trabalho, os algoritmos construídos foram comparados entre si. O foco da pesquisa foi o estudo da influência da relação entre as ordens de grandeza dos tempos de processamento e de setup em cada método de solução. Os resultados obtidos na experimentação computacional foram analisados e discutidos com base na porcentagem de sucesso, desvio relativo (%), desvio-padrão do desvio relativo e tempo médio de computação / This work adressess the hybrid flow shop scheduling problem with asymmetric sequence dependent setup times. This environment of production system is common in graphical, chemical, fabric, paper and ink industries. It’s characterized by systems with large mix of products. Any productive process requires an efficient management by means of Production Planning and Control. This activity includes scheduling, i.e., the resources allocation for the execution of jobs in a time base. Scheduling is one of the tasks most complex in production management, since it deals simultaneously with different types of resources and activities. Moreover, the number of possible solutions grows exponentially in some dimensions, in accordance with the number of jobs, operations or machines, conferring a combinatorial nature to the problem. In the environment studied in this work, the operations of each job are processed in multiple production stages. The number of machines in each stage can be different. Each operation is processed by only one machine in each stage. The setup times have a significant variability in function of the sequence of job processing on the machines. The objective is minimizing the total time to complete the schedule (makespan). Four constructive heuristic methods were developed on the basis of algorithms reported in the literature for solving permutation flow shop and parallel machine problems with sequence dependent setup times. The proposed heuristic methods have been compared between themselves, since no constructive heuristics have been found in the literature for the scheduling problem considered in this work. The focus of the research was the study of the influence of the relations among the range of the times processing and setup times in each method. The statistics used in order to evaluate the heuristic performances were the percentage of success (in finding the best solution), relative deviation, standard deviation of relative deviation and average computation time. Results from computational experience are discussed
4

Métodos heurísticos construtivos para redução do estoque em processo em ambientes de produção flow shop híbridos com tempos de setup dependentes da seqüência / Constructive heuristics methods to minimizing work in process in environment production hybrid flow shop with asymmetric sequence dependent setup times

Morais, Márcia de Fátima 28 May 2008 (has links)
A teoria de programação da produção preocupa-se em fornecer diretrizes e métodos eficientes para a utilização dos recursos nas atividades produtivas. Este trabalho investiga o problema de programação da produção em ambientes flow shop com máquinas múltiplas e tempos de preparação das máquinas assimétricos e dependentes da seqüência de execução das tarefas. A atividade de programação da produção constitui uma das várias funções executadas pelo planejamento e controle da produção, que tem como objetivo comandar e gerenciar o processo produtivo, e caracteriza uma das atividades mais complexas no gerenciamento dos sistemas produtivos. A programação da produção preocupa-se com a alocação de recursos sobre o tempo para executar um conjunto de tarefas. No ambiente estudado neste trabalho as operações de cada tarefa são executadas em múltiplos estágios de produção, podendo variar a quantidade de máquinas em cada um deles. Cada operação é processada por apenas uma máquina em cada estágio. Os tempos de preparação das máquinas possuem uma variabilidade relevante em função da ordem de execução das tarefas nas mesmas. A função-objetivo considerada é a minimização do tempo médio de fluxo. Foram desenvolvidos quatro métodos heurísticos construtivos com base em algoritmos reportados na literatura para solução do problema flow shop permutacional e máquinas paralelas cujo tempo de setup é dependente da seqüência de execução das tarefas. Como não foram encontrados na literatura métodos de solução para o problema investigado neste trabalho, os algoritmos propostos foram comparados entre si. Foi efetuado um estudo da influência da relação entre as ordens de grandeza dos tempos de processamento das tarefas e do setup das máquinas em cada método de solução. Os resultados obtidos na experimentação computacional foram analisados e discutidos com base na porcentagem de sucesso, desvio relativo, desvio-padrão do desvio relativo e tempo médio de computação. / Scheduling theory attempts to provide guidelines and efficient methods to the use of the resources in the productive activities. This study investigates the hybrid flow shop problem with asymmetric sequence dependent setup times. The activity of production scheduling constitute is one of the several functions carried by production planning and control, which has as the objective command and management the production system, and characterize is one of the tasks most complex in production management. This activity of the scheduling aims within the allocation of the resources for the execution of jobs in a time base. In the environment studied in this work, the operations of each job are processed in multiple production stages. The number of machines in each stage can be different. Each operation is processed by only one machine in each stage. The setup times have a significant variability in function of the sequence of job processing on the machines. The objective is minimizing the mean flow time. Four constructive heuristic methods were proposed on the basis of algorithms reported in the literature for solving permutation flow shop and parallel machine problems with sequence dependent setup times. The proposed heuristic methods will have compared between themselves, since no constructive heuristics have been found in the literature for the scheduling problem considered in this work. It was carried out the study of the influence of the relations among the range of the times processing and setup times in each method. The statistics used in order to evaluate the heuristic performances were the percentage of success (in finding the best solution), relative deviation, standard deviation of relative deviation and average computation time. Results from computational experience are discussed.
5

Métodos heurísticos construtivos para o problema de programação da produção em sistemas flow shop híbridos com tempos de preparação das máquinas assimétricos e dependentes da seqüência / Construtive heuristic methods for hybrid flow shop scheduling problem with asymmetric sequence dependent setup times

Hélio Yochihiro Fuchigami 14 February 2005 (has links)
Este trabalho trata do problema de programação de operações no ambiente flow shop com máquinas múltiplas, com seus tempos de preparação (setup) assimétricos e dependentes da seqüência de processamento das tarefas. Este ambiente de produção é comum em indústrias gráficas, químicas, têxteis, de papel e de tinta, caracterizadas por sistemas com amplo mix de produtos. Qualquer processo produtivo requer um gerenciamento eficaz por meio do Planejamento e Controle da Produção (PCP). Esta atividade inclui a programação da produção, ou seja, a alocação de recursos para a execução de tarefas em uma base de tempo. A atividade de programação é uma das tarefas mais complexas no gerenciamento de produção, pois há a necessidade de lidar com diversos tipos diferentes de recursos e atividades simultaneamente. Além disso, o número de soluções possíveis cresce exponencialmente em várias dimensões, de acordo com a quantidade de tarefas, operações ou máquinas, conferindo uma natureza combinatorial ao problema. No ambiente estudado neste trabalho as operações de cada tarefa são executadas em múltiplos estágios de produção, podendo variar a quantidade de máquinas em cada um deles. Cada operação é processada por apenas uma máquina em cada estágio. Os tempos de preparação das máquinas possuem uma variabilidade relevante em função da ordem de execução das tarefas nas máquinas. A função-objetivo considerada é a minimização da duração total da programação (makespan). Foram desenvolvidos quatro métodos heurísticos construtivos com base em algoritmos reportados na literatura para solução de problemas flow shop permutacional e máquinas paralelas no ambiente cujo tempo de setup é dependente da seqüência. Como não foram encontrados na literatura métodos para programação no ambiente tratado neste trabalho, os algoritmos construídos foram comparados entre si. O foco da pesquisa foi o estudo da influência da relação entre as ordens de grandeza dos tempos de processamento e de setup em cada método de solução. Os resultados obtidos na experimentação computacional foram analisados e discutidos com base na porcentagem de sucesso, desvio relativo (%), desvio-padrão do desvio relativo e tempo médio de computação / This work adressess the hybrid flow shop scheduling problem with asymmetric sequence dependent setup times. This environment of production system is common in graphical, chemical, fabric, paper and ink industries. It’s characterized by systems with large mix of products. Any productive process requires an efficient management by means of Production Planning and Control. This activity includes scheduling, i.e., the resources allocation for the execution of jobs in a time base. Scheduling is one of the tasks most complex in production management, since it deals simultaneously with different types of resources and activities. Moreover, the number of possible solutions grows exponentially in some dimensions, in accordance with the number of jobs, operations or machines, conferring a combinatorial nature to the problem. In the environment studied in this work, the operations of each job are processed in multiple production stages. The number of machines in each stage can be different. Each operation is processed by only one machine in each stage. The setup times have a significant variability in function of the sequence of job processing on the machines. The objective is minimizing the total time to complete the schedule (makespan). Four constructive heuristic methods were developed on the basis of algorithms reported in the literature for solving permutation flow shop and parallel machine problems with sequence dependent setup times. The proposed heuristic methods have been compared between themselves, since no constructive heuristics have been found in the literature for the scheduling problem considered in this work. The focus of the research was the study of the influence of the relations among the range of the times processing and setup times in each method. The statistics used in order to evaluate the heuristic performances were the percentage of success (in finding the best solution), relative deviation, standard deviation of relative deviation and average computation time. Results from computational experience are discussed
6

Métodos heurísticos construtivos para redução do estoque em processo em ambientes de produção flow shop híbridos com tempos de setup dependentes da seqüência / Constructive heuristics methods to minimizing work in process in environment production hybrid flow shop with asymmetric sequence dependent setup times

Márcia de Fátima Morais 28 May 2008 (has links)
A teoria de programação da produção preocupa-se em fornecer diretrizes e métodos eficientes para a utilização dos recursos nas atividades produtivas. Este trabalho investiga o problema de programação da produção em ambientes flow shop com máquinas múltiplas e tempos de preparação das máquinas assimétricos e dependentes da seqüência de execução das tarefas. A atividade de programação da produção constitui uma das várias funções executadas pelo planejamento e controle da produção, que tem como objetivo comandar e gerenciar o processo produtivo, e caracteriza uma das atividades mais complexas no gerenciamento dos sistemas produtivos. A programação da produção preocupa-se com a alocação de recursos sobre o tempo para executar um conjunto de tarefas. No ambiente estudado neste trabalho as operações de cada tarefa são executadas em múltiplos estágios de produção, podendo variar a quantidade de máquinas em cada um deles. Cada operação é processada por apenas uma máquina em cada estágio. Os tempos de preparação das máquinas possuem uma variabilidade relevante em função da ordem de execução das tarefas nas mesmas. A função-objetivo considerada é a minimização do tempo médio de fluxo. Foram desenvolvidos quatro métodos heurísticos construtivos com base em algoritmos reportados na literatura para solução do problema flow shop permutacional e máquinas paralelas cujo tempo de setup é dependente da seqüência de execução das tarefas. Como não foram encontrados na literatura métodos de solução para o problema investigado neste trabalho, os algoritmos propostos foram comparados entre si. Foi efetuado um estudo da influência da relação entre as ordens de grandeza dos tempos de processamento das tarefas e do setup das máquinas em cada método de solução. Os resultados obtidos na experimentação computacional foram analisados e discutidos com base na porcentagem de sucesso, desvio relativo, desvio-padrão do desvio relativo e tempo médio de computação. / Scheduling theory attempts to provide guidelines and efficient methods to the use of the resources in the productive activities. This study investigates the hybrid flow shop problem with asymmetric sequence dependent setup times. The activity of production scheduling constitute is one of the several functions carried by production planning and control, which has as the objective command and management the production system, and characterize is one of the tasks most complex in production management. This activity of the scheduling aims within the allocation of the resources for the execution of jobs in a time base. In the environment studied in this work, the operations of each job are processed in multiple production stages. The number of machines in each stage can be different. Each operation is processed by only one machine in each stage. The setup times have a significant variability in function of the sequence of job processing on the machines. The objective is minimizing the mean flow time. Four constructive heuristic methods were proposed on the basis of algorithms reported in the literature for solving permutation flow shop and parallel machine problems with sequence dependent setup times. The proposed heuristic methods will have compared between themselves, since no constructive heuristics have been found in the literature for the scheduling problem considered in this work. It was carried out the study of the influence of the relations among the range of the times processing and setup times in each method. The statistics used in order to evaluate the heuristic performances were the percentage of success (in finding the best solution), relative deviation, standard deviation of relative deviation and average computation time. Results from computational experience are discussed.
7

Optimization of Production Scheduling at IKEA Industry Hultsfred

Anemyr, Mattias January 2020 (has links)
IKEA Industry has factories in several locations where one location is in Hultsfred, Småland. IKEA Industry Hultsfred produces IKEA:s wardrobe collection PAX. In 2018, 2.8 million wardrobes were manufactured in Hultsfred. This thesis covers the subject of constructing and developing an optimization model which has the same characteristics as the plinth production at IKEA Industry Hultsfred. This means that the optimization model must consider production sequence; the setup time is different depending on which products that have been produced in the machine earlier. The thesis also covers to investigate how much time that is necessary to produce the plinths to Hultsfred, Portugal, and Germany under different circumstances. This thesis also balances inventory levels and setup time. I.e., how the inventory levels are changed if more emphasis is put into minimizing setup time, and the other way around. The results show that lower inventory levels and setup times are achievable over seven days if the production planning technique is changed.
8

Novos limitantes inferiores para o método branch-and-bound na solução de problemas flowshop permutacional / New lower bounds for the branch-and-bound method for solving permutation flowshop problems

Tomazella, Caio Paziani 15 May 2019 (has links)
Em um contexto industrial, a programação da produção tem como objetivo alocar recursos para operações de forma a aumentar a eficiência operacional do processo de fabricação. Esta programação pode ser modelada na forma de problemas de sequenciamento de tarefas, que são resolvidos visando minimizar um determinado critério de desempenho. A aplicação de métodos exatos nestes problemas possibilita encontrar a solução ótima, tanto para aplicação direta como para a validação de métodos heurísticos e metaheurísticas. Entretanto, a literatura mostra que os métodos exatos, tanto a resolução do problema pela modelagem em programação linear-inteira mista como o branch-and-bound, têm sua aplicação restrita à problemas de menores tamanhos. O objetivo deste trabalho é propor novas formulações de limitantes inferiores para a aplicação do branch-and-bound em problemas de flowshop permutacional visando aumentar sua eficiência e aplicabilidade. Os limitantes propostos são avaliados em problemas de flowshop permutacional com tempos de setup dependente da sequência, tendo como critérios de desempenho o tempo de fluxo total e o atraso total. A avaliação da aplicabilidade de cada limitante é feita através do número de nós explorados e o tempo computacional gasto pelo branch-and-bound para resolver problemas de diversos tamanhos. / In an industrial context, production sequencing aims at allocating resources for job processing while increasing manufacturing efficiency. This task can be modelled in the form of scheduling problems, which are solved by minimizing a pre-determined performance criterion. The use of exact methods allows the optimal solution to be found, which can be applied directly in the manufacturing shop or used to validate heuristic and metaheuristic methods. However, the literature shows that MILP and branch-and-bound, both exact methods, are restrained to small-sized scheduling problems. The aim of this project is to propose new lower bound formulations to be used in the branch-and-bound method for permutational flowshop probems, in order to extend its efficiency and applicability. The proposed bounds are tested in permutational flowshop problems with sequence dependent setup times, and using as performance criteria the total flow time and the total tardiness. The evaluation of each lower bounds applicability is done considering the number of explored nodes and the required computational time for the branch-and-bound to solve problem instances of different sizes.
9

Avaliação de métodos heurísticos para a solução do problema de programação flowshop com tempos de setup assimétricos e dependentes da sequência / Heuristic methods evaluation for solution of flowshop scheduling problems with asymmetric sequence dependent setup times

Carneiro, Felipe Marcus 23 February 2011 (has links)
Este trabalho é dedicado ao problema de programação em Flowshop Permutacional com tempos de preparação (setup) assimétricos e separados dos tempos de processamento e dependentes da seqüência de execução das tarefas e tem o objetivo de minimização da duração total da programação (Makespan). Através da investigação das propriedades estruturais do problema, são desenvolvidos os parâmetros XR e QR de uma programação, que indicam ociosidade das máquinas (para valores positivos) e bloqueio das tarefas (para valores negativos). Os novos parâmetros são utilizados para propor uma melhoria no cálculo eficiente de Makespan proposto por Taillard (1990). Esta melhoria é então utilizada no desenvolvimento de uma nova heurística construtiva baseada no método NEHT-RB de Ríos-Mercado e Bard (1998b) denominada CNIT, que é comparada durante a experimentação computacional com os métodos SETUP e TOTAL, de Simons (1992) com pequenas melhorias; com a proposta da utilização da propriedade UBX de Moccellin e Nagano (2007); e com o método NEHT-RB. Os métodos são então submetidos a uma busca local descendente como proposta em Ruiz e Stützle (2008) e seus desempenhos como soluções iniciais para este procedimento de busca local são avaliados. Em seguida, um método melhorativo derivado do novo método construtivo e baseado na meta-heurística IG de Ruiz e Stützle (2008) é proposto e denominado CNIT-IG. O método é comparado com a heurística IG original submetida às diferentes soluções iniciais estudadas durante a avaliação da nova heurística construtiva. As comparações são realizadas utilizando-se o banco de dados de Taillard (1990) para o flowshop permutacional adaptado para o problema de flowshop com tempos de setup assimétricos e dependentes da seqüência. Os resultados da experimentação computacional são analisados em termos da porcentagem média de sucesso, do desvio relativo médio e em relação ao tempo médio computacional e mostram a superioridade dos resultados da nova heurística construtiva CNIT e seu alto custo computacional, de complexidade mn³. Os resultados mostram ainda a superioridade da meta-heurística CNIT-IG sobre o método IG. / This work addresses the Permutation Flowshop scheduling problem with separated sequence-dependent setup times with the objective of minimizing Makespan. Through the investigation of the problem structural properties, two scheduling parameters XR e QR are developed, they indicate the machine idleness (for positive values) and task blocking (for negative values). These new parameters are used to propose an improvement in the efficient makespan calculation as stated by Taillard (1990). This improvement is then used for development of a new constructive heuristic based on Ríos-Mercado and Bard (1998b) method NEHT-RB nominated CNIT, and it is compared during computational experimentation with the methods SETUP and TOTAL of Simons (1992), with slight improvements; with the proposal of property UBX from Moccellin and Nagano (2007) and with NEHT-RB method. The methods are then submitted to descent local search as proposed in Ruiz and Stützle (2008) and its performance as initial solutions for this local search procedure is evaluated. Next, an improvement method derivate from the new constructive method and based on metaheuristic IG from Ruiz and Stützle (2008) is proposed and nominated CNIT-IG. This method is compared with original IG submitted to different initial solutions studied during constructive heuristic evaluation. Comparisons are done using Taillards instances (1990) for standard flowshop and adapted to the flowshop with sequencedependent setup times problem. The results of computation experimentation are analyzed in terms of average percentage of success, average relative percentage deviation and average computational time and show superiority of new constructive heuristic CNIT-IG and its high computational cost, with complexity mn³. The results also show superiority of metaheuristic CNIT-IG over IG method.
10

Avaliação de métodos heurísticos para a solução do problema de programação flowshop com tempos de setup assimétricos e dependentes da sequência / Heuristic methods evaluation for solution of flowshop scheduling problems with asymmetric sequence dependent setup times

Felipe Marcus Carneiro 23 February 2011 (has links)
Este trabalho é dedicado ao problema de programação em Flowshop Permutacional com tempos de preparação (setup) assimétricos e separados dos tempos de processamento e dependentes da seqüência de execução das tarefas e tem o objetivo de minimização da duração total da programação (Makespan). Através da investigação das propriedades estruturais do problema, são desenvolvidos os parâmetros XR e QR de uma programação, que indicam ociosidade das máquinas (para valores positivos) e bloqueio das tarefas (para valores negativos). Os novos parâmetros são utilizados para propor uma melhoria no cálculo eficiente de Makespan proposto por Taillard (1990). Esta melhoria é então utilizada no desenvolvimento de uma nova heurística construtiva baseada no método NEHT-RB de Ríos-Mercado e Bard (1998b) denominada CNIT, que é comparada durante a experimentação computacional com os métodos SETUP e TOTAL, de Simons (1992) com pequenas melhorias; com a proposta da utilização da propriedade UBX de Moccellin e Nagano (2007); e com o método NEHT-RB. Os métodos são então submetidos a uma busca local descendente como proposta em Ruiz e Stützle (2008) e seus desempenhos como soluções iniciais para este procedimento de busca local são avaliados. Em seguida, um método melhorativo derivado do novo método construtivo e baseado na meta-heurística IG de Ruiz e Stützle (2008) é proposto e denominado CNIT-IG. O método é comparado com a heurística IG original submetida às diferentes soluções iniciais estudadas durante a avaliação da nova heurística construtiva. As comparações são realizadas utilizando-se o banco de dados de Taillard (1990) para o flowshop permutacional adaptado para o problema de flowshop com tempos de setup assimétricos e dependentes da seqüência. Os resultados da experimentação computacional são analisados em termos da porcentagem média de sucesso, do desvio relativo médio e em relação ao tempo médio computacional e mostram a superioridade dos resultados da nova heurística construtiva CNIT e seu alto custo computacional, de complexidade mn³. Os resultados mostram ainda a superioridade da meta-heurística CNIT-IG sobre o método IG. / This work addresses the Permutation Flowshop scheduling problem with separated sequence-dependent setup times with the objective of minimizing Makespan. Through the investigation of the problem structural properties, two scheduling parameters XR e QR are developed, they indicate the machine idleness (for positive values) and task blocking (for negative values). These new parameters are used to propose an improvement in the efficient makespan calculation as stated by Taillard (1990). This improvement is then used for development of a new constructive heuristic based on Ríos-Mercado and Bard (1998b) method NEHT-RB nominated CNIT, and it is compared during computational experimentation with the methods SETUP and TOTAL of Simons (1992), with slight improvements; with the proposal of property UBX from Moccellin and Nagano (2007) and with NEHT-RB method. The methods are then submitted to descent local search as proposed in Ruiz and Stützle (2008) and its performance as initial solutions for this local search procedure is evaluated. Next, an improvement method derivate from the new constructive method and based on metaheuristic IG from Ruiz and Stützle (2008) is proposed and nominated CNIT-IG. This method is compared with original IG submitted to different initial solutions studied during constructive heuristic evaluation. Comparisons are done using Taillards instances (1990) for standard flowshop and adapted to the flowshop with sequencedependent setup times problem. The results of computation experimentation are analyzed in terms of average percentage of success, average relative percentage deviation and average computational time and show superiority of new constructive heuristic CNIT-IG and its high computational cost, with complexity mn³. The results also show superiority of metaheuristic CNIT-IG over IG method.