• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 72
  • 6
  • 1
  • Tagged with
  • 79
  • 31
  • 25
  • 25
  • 25
  • 23
  • 23
  • 22
  • 22
  • 22
  • 22
  • 22
  • 21
  • 21
  • 20
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
61

Příprava realizace bytového domu ve Dvoře Královém nad Labem / Preparation of realization apartment building in Dvůr Králové nad Labem

Možíš, Jan January 2016 (has links)
The subject of my diploma thesis is the construction-technological project of apartment house in Dvůr Králové nad Labem. Thesis is focused on the most optimal technological procedures of foundation construction on deep foundations and total external insulation by external thermal insulation composite system. Regulations are supplemented by inspectional and trial plans, appropriate machinery and equipment of assembly site. Included is also work safety, time schedule and budget of substruture. The most interesting thing of my thesis will be model of the noise load on the surrounding objects resulting from the construction of apartment house which will the proposed appropriate measures of noise control.
62

Stavebně technologický projekt bytového domu v Liberci / Construction technological project of residential building in Liberec

Plachý, Jakub January 2017 (has links)
This diploma thesis deal with phase of construction, which is foundation and upper construction of apartment building Komenského in Liberec. Building is situated in built-up and green area. Foundation circumstances is half difficult because of lower water included in soil. In this phase, we use formowork for columns, walls and roof. Used formwork is from Peri company, Quatro, Trio and Multiflex. There is suteren in the house, and because of lower water and high index of radon, we have to protect structure by compact waterproof isolation. This project contains formwork schematics and the time calculation needed to protect concrete until accomplishment. Other task is thermal review of constructions.
63

Vybrané části STP výrobní haly s administrativní budovou v Hustopečích / Selected parts of the Construction-technology Project of a Factory Building with an Administration Building in Hustopeče

Zálešák, Vít January 2012 (has links)
The diploma thesis is engaged of selected parts of the construction-technology project of a factory building with an administration building in Hustopeče. The construction-technology project contains technical account construction of technological solutions, project of temporary works designed to perform construction, time and financial plan and detailed time plan for rough construction, includes inspection and test plan and technological standard for solution of lower structures of solutions object. In another input is made technological study of the chief technological stage and budget for rough lower structures. As specialization is solution fire safety of buildings.
64

Stavebně technologický projekt terasového bytového domu v Brně / Technological project of the terrace apartment house

Baštová, Veronika January 2012 (has links)
The project deals with building technological study of the new building apartment house in Brno. Dimensions of the apartment building are 29.2 m x 57.2 m with shape of a rectangle. The apartment house is designed terraced in five floors as a brick structure of the ceramic blocks. Ceilings and construction in contact with the ground is reinforced concrete. In groundfloor are located garages, other floors are designed as residential. The project deals with technological processes of bottom building, time and financial demands of construction.
65

Využití recyklátů z vozovek do pozemních komunikací / The utilization of the pavement waste materials to roads

Furdaničová, Alice Unknown Date (has links)
The diploma thesis deals with the use of recycled asphalt with aggregate in a hydraulically bound mixtures. The mixture is determined in the base or sub-base course of the pavement. The theoretical part of the diploma thesis describes the base course of the pavement, the production of recyclates from construction demolition waste, the acquisition and processing of recycled asphalt, the road reuse and recycling. The thesis is enriched by a contribution from the implementation of recycled asphalt laying into the base course of the communication company SKANSKA a.s. and ČNES a.s. The next chapter describes detailed experiences with recycling abroad. The thesis also contains a description of laboratory tests, which are important for evaluating the properties of mixtures with recycled asphalt. The practical part verifies the suitability of the mixture of recycled asphalt and aggregate for the road surface by testing the transverse tensile strength, compressive strength and frost and water resistance. The mixtures used are found to be suitable for pavement base course.
66

Mateřská škola Kuřim - stavebně technologický projekt / Kindergarten Kuřim - construction technology project

Kurka, Jan Unknown Date (has links)
The subject of the thesis is the solution of selected parts of the construction technology project of the construction of a kindergarten in Kuřim on Hybešova Street. It is a single-story brick building with a flat roof with a green roof. In my work I solve the study of the main technological stages, technological regulations for the monolithic ceiling structure and the green roof of the Smart Roof Solutions system together with inspection and test plans, design of the main construction machines, time and a financial plan for the main building of the kindergarten, the building time and financial plan for the entire construction plan, the balance of workers and the deployment of construction machinery and the construction site equipment project. Then I add a noise study, assessment of selected LEED 2009 Core & Shell credits, design of the TOPSAFE restraint system, health and safety plan, documentation of the green roof of the Smart Roof Solutions system and a search on the topic of green roofs.
67

Stavebně technologický projekt polyfunkčního domu Sokolská 5 v Olomouci / Construction and technological project of polyfunctional building Sokolská 5 in Olomouc

Slováček, Ondřej January 2018 (has links)
The subject of this diploma thesis is the elaboration of the building project of Polyfunkční dům Sokolská 5. In the course of the diploma thesis is elaborated a summary technical report, report of building site and drawings for individual stages. The implementation of the waterproofing of the base structure and the reinforced concrete monolithic skeleton are subject to technological regulations and control and test plans. In this work the object time and financial plan, the use of machines and mechanisms and health and safety at work are also solved. For the main building objects, an item budget and a detailed schedule are prepared. Part of this work is also the calculation of the heat transfer through the envelope of the building.
68

Příprava realizace bytového domu v Brně - Modřicích / Preparation for the construction of an apartment building in Brno - Modřice

Růžička, Radek January 2019 (has links)
The diploma thesis deals with the lower and upper rough building of a apartment building. It includes a technical report, broader transport routes, a study of the implementation of the main technological stages, a technical report of the construction site equipment, the design of the main building machines and mechanisms, a plan for providing material resources for a reinforced concrete ceiling, a technological regulation for the rough bottom and top structure, work and monolithic constructions, gross building budget, risk plan and their measures, statement of the dimension and network graph for finishing works, thermal technical assessment of external structures, drawing of site equipment, situation, original state of the land and ramp diagram. It also contains time and financial plan of the building, schedule of the main building, schedule of construction and disposal of construction site equipment and balance of machines and workers.
69

Stavebně technologický projekt výrobní a administrativní haly ATX / Building Construction Project for Industrial and Administrative Building ATX

Šrámek, Jiří January 2019 (has links)
The subject of this master’s thesis is a solution of chosen parts of building construction project. The project solves industrial hall that contains productions and administrative space. This thesis includes technological regulations for substructure, study of performing the main technological stages, design of using machines, checking and testing plans. Other phrases parts are time schedules, budget, calculations, design of site equipment including engineering report and report for performing access road. Starting materials, which were used for this thesis, were engineering report also including working drawings.
70

Stavebně technologický projekt administrativní budovy firmy Ray Service, a.s. ve Starém Městě / Construction Project - Implementation of Administrative Building for Ray Service, a.s. in Staré Město

Seménka, Petr January 2020 (has links)
The content of this thesis is a construction technology project of a new office and production building for company Ray Service a.s. in Staré Město near Uherské Hradiště. The thesis contains technical reports, construction technology study, design of transport ways, technological regulations of demolition and earthworks and regulations for construction of foundation structures. Furthermore is made design of the main machine assembly, inspection and test plan and the design of the construction site, including a technical report. Finally is made a project for the construction of area roads including time plan, LEED certification, noise study and comparison of the main lifting mechanisms.

Page generated in 0.0306 seconds