• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 9
  • Tagged with
  • 9
  • 9
  • 7
  • 5
  • 4
  • 4
  • 4
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Automated Analysis Tools for Reducing Spacecraft Telemetry Data

Voss, T. J. 10 1900 (has links)
International Telemetering Conference Proceedings / October 25-28, 1993 / Riviera Hotel and Convention Center, Las Vegas, Nevada / A practical description is presented of the methods used to reduce spacecraft telemetry data using a hierarchial toolkit of software programs developed for a UNIX environment.
2

Launch Vehicle and Satellite Independent Failure Analysis Using Telemetry Prognostic Algorithms

Losik, Len 10 1900 (has links)
ITC/USA 2008 Conference Proceedings / The Forty-Fourth Annual International Telemetering Conference and Technical Exhibition / October 27-30, 2008 / Town and Country Resort & Convention Center, San Diego, California / Unique vehicle designs encourage the use of the builder to complete its own failure analysis. Current failure analysis practices use telemetry and diagnostic technology developed over the past 100 years to identify root-cause. When telemetry isn't available speculation is used to create a list of prioritized, potential causes. Prognostic technology consists of generic algorithms that identify equipment that has failed and is going to fail while the equipment is still at the factory allowing the equipment to be repaired or replaced while it is still on the ground for any spacecraft, satellite, launch vehicle and missile.
3

Using Generic Telemetry Prognostic Algorithms for Launch Vehicle and Spacecraft Independent Failure Analysis Service

Losik, Len 10 1900 (has links)
ITC/USA 2010 Conference Proceedings / The Forty-Sixth Annual International Telemetering Conference and Technical Exhibition / October 25-28, 2010 / Town and Country Resort & Convention Center, San Diego, California / Current failure analysis practices use diagnostic technology developed over the past 100 years of designing and manufacturing electrical and mechanical equipment to identify root cause of equipment failure requiring expertise with the equipment under analysis. If the equipment that failed had telemetry embedded, prognostic algorithms can be used to identify the deterministic behavior in completely normal appearing data from fully functional equipment used for identifying which equipment will fail within 1 year of use, can also identify when the presence of deterministic behavior was initiated for any equipment failure.
4

Relying on Telemetry for Mission Critical Decisions: Lessons Learned from NASA's Reusable Launch Vehicle for Use on the Air Force's Next Generation Reusable Launch Vehicle

Losik, Len 10 1900 (has links)
ITC/USA 2012 Conference Proceedings / The Forty-Eighth Annual International Telemetering Conference and Technical Exhibition / October 22-25, 2012 / Town and Country Resort & Convention Center, San Diego, California / The U.S. Air Force's next generation reusable booster (NGRSB) offers the opportunity for the Space Command to use intelligent equipment for decision making replacing personnel, increasing safety and mission assurance by removing decisions from program management personnel who may not have had any flight-test experience. Adding intelligence to launch vehicle and spacecraft equipment may include requiring the builder to use a prognostic and health management (PHM) program. The PHM was added to NASA's aircraft programs in 2009 and we have requested NASA HQ and NASA Marshal Space Flight Center adopt the NASA PHM in the procurement contracts used on the new Space Launch Systems, NASA's congressionally mandated replacement for the Space Shuttle. Space Vehicle Program managers often make decisions for on-orbit spacecraft without ever having on-orbit space flight experience. Intelligent equipment would have eliminated the catastrophic failures on the NASA Space Shuttle Challenger and Columbia. These accidents occurred due to the lack of space vehicle subsystem engineering personnel analyzing real-time equipment telemetry presented on strip chart and video data prior to lift off during pre-launch checkout for the Space Shuttle Challenger and the lack of space vehicle real-time equipment telemetry for Columbia. The PHM requires all equipment to include analog telemetry for measuring the equipment performance and usable life determination in real-time and a prognostic analysis completed manually will identify the equipment that will fail prematurely for replacement before launch preventing catastrophic equipment failures that may cause loss of life.
5

Using Generic Telemetry Prognostic Algorithms for Launch Vehicle and Spacecraft Independent Failure Analysis Service

Losik, Len 10 1900 (has links)
ITC/USA 2009 Conference Proceedings / The Forty-Fifth Annual International Telemetering Conference and Technical Exhibition / October 26-29, 2009 / Riviera Hotel & Convention Center, Las Vegas, Nevada / Current equipment and vehicle failure analysis practices use diagnostic technology developed over the past 100 years of designing and manufacturing electrical and mechanical equipment to identify root cause of equipment failure requiring expertise with the equipment under analysis. If the equipment that failed had telemetry embedded, prognostic algorithms can be used to identify the deterministic behavior in completely normal appearing data from fully functional equipment used for identifying which equipment will fail within 1 year of use, can also identify when the presence of deterministic behavior was initiated for any equipment failure.
6

Stopping Launch Vehicle Failures Using Telemetry to Measure Equipment Usable Life

Losik, Len 10 1900 (has links)
ITC/USA 2011 Conference Proceedings / The Forty-Seventh Annual International Telemetering Conference and Technical Exhibition / October 24-27, 2011 / Bally's Las Vegas, Las Vegas, Nevada / Launch vehicle equipment reliability is driven by infant mortality failures, which can be eliminated using a prognostic analysis prior, during and/or after the exhaustive and comprehensive dynamic environmental factory acceptance testing. Measuring and confirming equipment performance is completed to increase equipment reliability by identifying equipment that fails during test for repair/replacement. To move to the 100% reliability domain, equipment dynamic environmental factory testing should be followed by a prognostic analysis to measure equipment usable life and identify the equipment that will fail prematurely. During equipment testing, only equipment performance is measured and equipment performance is unrelated to equipment reliability making testing alone inadequate to produce equipment with 100% reliability. A prognostic analysis converts performance measurements into an invasive usable life measurement by sharing test data used to measure equipment performance. Performance data is converted to usable life data provides a time-to-failure (TTF) in minutes/hours/days/months for equipment that will fail within the first year of use, allowing the production of equipment with 100% reliability.
7

Using Data-Driven Prognostic Algorithms for Completing Independent Failure Analysis

Losik, Len 10 1900 (has links)
ITC/USA 2011 Conference Proceedings / The Forty-Seventh Annual International Telemetering Conference and Technical Exhibition / October 24-27, 2011 / Bally's Las Vegas, Las Vegas, Nevada / Current failure analysis practices use diagnostic technology developed over the past 100 years of designing and manufacturing electrical and mechanical equipment to identify root cause of equipment failure requiring expertise with the equipment under analysis. If the equipment that failed had telemetry embedded, prognostic algorithms can be used to identify the deterministic behavior in completely normal appearing data from fully functional equipment used for identifying which equipment will fail within 1 year of use, can also identify when the presence of deterministic behavior was initiated for any equipment failure.
8

Stopping Launch Vehicle Failures Using Telemetry to Measure Equipment Usable Life

Losik, Len 10 1900 (has links)
Launch vehicle equipment reliability is driven by infant mortality failures, which can be eliminated using a prognostic analysis prior, during and/or after the exhaustive and comprehensive dynamic environmental factory acceptance testing. Measuring and confirming equipment performance is completed to increase equipment reliability by identifying equipment that fails during test for repair/replacement. To move to the 100% reliability domain, equipment dynamic environmental factory testing should be followed by a prognostic analysis to measure equipment usable life and identify the equipment that will fail prematurely. During equipment testing, only equipment performance is measured and equipment performance is unrelated to equipment reliability making testing alone inadequate to produce equipment with 100% reliability. A prognostic analysis converts performance measurements into an invasive usable life measurement by sharing test data used to measure equipment performance. Performance data is converted to usable life data provides a time-to-failure (TTF) in minutes/hours/days/months for equipment that will fail within the first year of use, allowing the production of equipment with 100% reliability.
9

Results from the Prognostic Analysis Completed on the NASA EUVE Satellite to Measure Equipment Mission Life

Losik, Len 10 1900 (has links)
ITC/USA 2011 Conference Proceedings / The Forty-Seventh Annual International Telemetering Conference and Technical Exhibition / October 24-27, 2011 / Bally's Las Vegas, Las Vegas, Nevada / This paper addresses the research conducted at U.C. Berkeley Space Sciences Laboratory, Center for Extreme Ultra Violet Astrophysics between 1994 and 1995 on the NASA EUVE ion-orbit satellite. It includes the results from conducting a scientific analysis called a prognostic analysis completed on all satellite subsystem equipment. A prognostic analysis uses equipment analog telemetry to measure equipment remaining usable life. The analysis relates equipment transient behavior, often referred to as "cannot duplicates" in a variety of industries caused from accelerated aging to the equipment end-of-life with certainty. The analysis was confirmed by using proprietary, pattern recognition software by Lockheed Martin personnel Lockheed Martin personnel completed an exploration into the application of statistical pattern recognition methods to identify the behavior caused from accelerated aging that experts in probability reliability analysis claims cannot exist. Both visual and statistical methods were successful in detecting suspect accelerated aging and this behavior was related to equipment end of life with certainty. The long-term objective of this research was to confirm that satellite subsystem equipment failures could be predicted so that satellite subsystem and payload engineering personnel could be allocated for only the time that equipment failures were predicted to occur, lowering the cost of mission operations. This research concluded that satellite subsystem equipment remaining usable life could be measured and equipment failures could be predicted with certainty so that engineering support for mission operations could be greatly reduced.

Page generated in 0.0691 seconds