• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 71
  • 59
  • 30
  • 10
  • 3
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 175
  • 38
  • 38
  • 37
  • 31
  • 30
  • 21
  • 20
  • 18
  • 16
  • 15
  • 15
  • 15
  • 14
  • 13
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
21

Terminal terrestre en Villa de Pasco - Vicco

Pedal Baertl, Elke 18 July 2015 (has links)
Tesis
22

Tesis EIA en Vías Terrestres, estudio de caso: Tramo San Marcos-Huari, Vía: Catac - Huari -Pomabamba

Quispe Sinca, Marco Polo January 2007 (has links)
No description available.
23

Plan de Seguridad para el proyecto "Conservación Vial por Niveles de Servicio de la Carretera: Huancayo-Imperial-Izcuchaca-Ayacucho e Imperial-Pampas-Mayoc"

Mondragón Roldán, Renson, Lecaside, Juan Castro, Dongo-Soria Segale, Roberto 04 June 2009 (has links)
El trabajo final se orientará a la implementaciónde un Plan de Seguridad aplicado al Proyecto de Conservación Vial por Niveles de Servicio de la Carretera: Huancayo-Imperial-Izcuchaca-Ayacucho e Imperial-Pampas-Mayoc, basado en las herramientas yprocedimientos aprehendidos en el Curso de Prevención de Riesgos Laborales Con la elaboración del Plan de Seguridad se implementarán mecanismos que serán aplicados durante la ejecución del proyecto de conservación vial con la finalidad de preservar la integridad física, mental y social de los trabajadores cumpliendo los requisitos de calidad, costo plazo
24

Mares gravimetricas, influencias ambientais e calibração instrumental : estudos na estação Curitiba

Schwab, Silvia Helena Soares, 1957- January 1999 (has links)
Orientador: Silvio Rogerio Correia de Freitas / Co-orientador: Wladimir Shukowsky / Tese (doutorado) - Universidade Federal do Paraná / Resumo: A aquisição de dados de maré gravimétrica consiste em colocar o instrumento em aquisição de dados em uma estação, onde interferem algumas variáveis físicas tais como a resposta local a variação dos parâmetros de ambiente e o efeito indireto dos oceanos. Dentre as possíveis abordagens do problema, propõe-se a determinação das admitâncias e função de transferência entre as grandezas físicas envolvidas no processo. Para isto, e necessário que os dados resultantes da analise de maré sejam concordantes com os parâmetros de maré historicamente conhecidos para a estação. A sua adequação pode ser feita mediante uma calibração dinâmica do gravimetro, em relação aos valores de referencia. Este processo de calibração, assim como a determinação das admiâancias entre os parâmetros de ambiente e o efeito do carregamento oceânico em relação as maré gravimétricas, são fundamentais para a melhor aplicação dos gravimetros de mola, em vista da resolução exigida na atualidade na observação de mares. A metodologia de estudo aqui proposta, aplicada a dados obtidos pelo gravimetro GEO 783 na estação fundamental de Curitiba, Brasil (ICET-7305), pode também ser estendido para as operações normais de observação das mares gravimétricas em novas estações, possibilitando o refinamento das analises gravimétricas, desde que amostrados adequadamente os parâmetros do ambiente de aquisição. Cada influencia e considerada como um canal, de maneira a estudar as suas admitâncias com o canal gravimétrico, de forma independente. Desta forma, o estudo visa discriminar, em caráter local, a parcela de contribuição de cada um dos canais, através do seu modelamento, do estudo das suas correlações no domínio do tempo e principalmente através da construção das suas funções de transferência, em amplitude e fase, no domínio das frequências via analise espectral. Os experimentos realizados foram baseados em dados-minuto gravimétricos obtidos durante sete meses no ano de 1995, aliados a dados de pressão, temperatura e umidade do ar obtidos através de captores, com a mesma taxa de amostragem, devidamente calibrados com a utilização de instrumentos-padrão. Para a avaliação da adequação das correções instrumentais adotadas para o GEO 783, foi realizada uma comparação com os valores de referencia dos parâmetros de maré na estação, que indicou a necessidade de realizar a calibração dinâmica. Nesta, a partir do nível dos resíduos obtidos após a analise de maré, foram considerados como elemento discriminador para a avaliação da calibração, os valores de carregamento oceânico calculados para a estação, pela utilização do modelo de Schwiderski tradicionalmente adotado, e dos novos modelos introduzidos a partir de 1992, via altimetria por satélite TOPEX/POSEIDON. Com este procedimento, os valores resultantes da serie foram adequados para posterior estudos de influencias entre os canais. Com este fim, foram então estudadas as correlações entre os canais de pressão, temperatura e umidade com o sinal gravimétrico observado, nos dois domínios, do tempo e das frequências. Uma vez caracterizadas as admitâncias entre os canais, evidenciou-se uma forte correlação entre o sinal gravimétrico e a pressão atmosférica, que permitiu mediar valores para as funções de transferência entre estes canais, nas diversas bandas de frequências do espectro de mares. / Abstract: The acquisition of gravimetric tide data consists of placing the instrument on a station under the influence of some physical variables, such as the local response to environmental parameters and the indirect effects of oceans. Among the many possible methods to treat this kind of problem, it is proposed the determination of the admittances and transfer functions among the variables involved in the process. With that purpose, it is necessary that resulting analysed data be in accordance with the historically known tidal parameters of the station. Its adequacy can be verified through a dynamic calibration as function of reference values. This calibration process, as well as the determination of admittances between the environmental parameters and ocean loading related with gravimetric tides, are fundamental for a better use of spring gravity meters, taking into account the required resolution for Earth tides observation. The proposed methodology of study, was applied to data obtained by GE0783 at the Curitiba Fundamental Station (ICET-7305), Brazil. It can be extended to common gravimetric tide observations, performed in new stations. It also allows the improvement of the tidal analysis, because the environmental parameters can be adequately sampled. Each influence is considered as an independent channel, as a way to study their admittances with the gravimetric channel. Thus, the study aims to discriminate, with a local character, the contribution of each channel independently, through its modeling, its correlation in time domain, and mainly, the construction of its transfer functions in both frequency, in magnitude and phase, in frequency domain through spectral analysis. Experiments were carried out using gravimetric minute-sampled data, obtained at Curitiba Station during seven months, in 1995, together with air pressure, temperature and air humidity data, sampled at the same rate, and adequately calibrated to usual units of physics through the use of standard instruments. To estimate the adopted instrumental corrections for GEO 783, the results of tidal anlysis were compared with the reference values of tidal parameters at the station, which indicated the necessity to perform the dynamic calibration. In this last procedure, the discrimination element of the results of the calibration, was considered as being the calculated values for local ocean loading, by means the traditional Schwidersky method, and the news models established by satellite althimetriy, via TOPEX-POSEIDON. Then, the 1995' series was adequated to the influences analysis proposed in this work. The correlation coefficients between the air pressure, temperature and air humidity channels and the observed channel, in two domains, time and frequency were studied. The admittance between the channels was characterized, a significant correlation between the observed signal and air pressure was evident, allowing to focus on their transfer functions in the different frequency bands of the earth tide spectrum.
25

Influencia de los proyectos de infraestructura vial en las condiciones de tráfico de la intersección av. Perú con av. Próceres de la Independencia ubicada en el distrito de San Juan de Lurigancho

Chalco Condorhuamán, Karen Eugenia 09 November 2013 (has links)
El tema de investigación es la influencia de los proyectos de infraestructura vial en las condiciones de tráfico de la intersección de las avenidas Perú y Próceres de la Independencia ubicada en el distrito de San Juan de Lurigancho. La hipótesis sostiene que el mejor análisis es la aplicación de la metodología HCM (Highway Capacity Manual) en el estudio del comportamiento del flujo vehicular y peatonal para determinar los niveles de servicio y la semaforización adecuada de las intersecciones afectadas, y lograr la satisfacción de la demanda vehicular. / Tesis
26

Inspección de seguridad vial integral en una intersección urbana (avenida Pastor Sevilla / avenida El Sol – Villa El Salvador)

Castellanos López, Aron David, García Apaico, Raúl Neyders 29 November 2018 (has links)
En la actualidad, la Seguridad Vial en el mundo, es un factor muy importante a considerar para la reducción del número de accidentes de tránsito. Es por ello que, una de las formas para reducir considerablemente este problema es mediante las llamadas Auditorías e Inspecciones de Seguridad Vial que tienen como objetivo principal evaluar y definir los riesgos potenciales de los accidentes de tránsito. El primer capítulo de la presente tesis, toma en cuenta la contextualización y fundamentación de la investigación, es decir, la realidad actual de la seguridad vial en el mundo, continente sudamericano y en el Perú. Además, se define el objetivo general, los objetivos específicos y sus respectivos indicadores de logro. En el segundo capítulo, se describe el marco teórico de las auditorías e inspecciones de seguridad vial; se describe el Estado del Arte, antecedentes, definiciones, metodologías, consideraciones de seguridad vial y entre otros. En el tercer capítulo, se realiza una investigación previa de los países con mayor semejanza al caso peruano en términos de seguridad vial. Asimismo, se adapta una lista de chequeo, que es la herramienta fundamental de una inspección de seguridad vial, basada en manuales de Chile y Colombia. En el cuarto capítulo, se analiza el caso práctico, en el cuál se realiza la inspección de seguridad vial en la intersección planteada. Además, se realiza el informe de inspección y se proponen las mejoras a ser implementadas. Finalmente, en el quinto capítulo, se presentan las conclusiones, recomendaciones y bibliografía. Currently, Road Safety in the world is a very important factor to consider in order to reduce the number of traffic accidents. That is why, one of the ways to reduce this problem considerably is through the so-called Road Safety Audits and Inspections whose main objective is to evaluate and define the potential risks of traffic accidents. The first chapter of this thesis, takes into account the contextualization and foundation of the research, that is, the current reality of road safety in the world, South American continent and in Peru. In addition, the general objective, the specific objectives and their respective indicators of achievement are defined. In the second chapter, the theoretical framework of road safety audits and inspections is described; The State of the Art, background, definitions, methodologies, road safety considerations and others are described. In the third chapter, a preliminary investigation is carried out of the countries with the greatest similarity to the Peruvian case in terms of road safety. Likewise, a checklist is adapted, which is the fundamental tool of a road safety inspection, based on manuals from Chile and Colombia. In the fourth chapter, the case study is analyzed, in which the road safety inspection is carried out at the intersection. In addition, the inspection report is made and the improvements to be implemented are proposed. Finally, in the fifth chapter, the conclusions, recommendations and bibliography are presented. / Tesis
27

Pertubações orbitais devidas a maré terrestre /

Santos, Nadjara dos. January 2002 (has links)
Orientador : Rodolpho Vilhena de Moraes / Banca: Antonio Fernando Bertachini de Almeida Prado / Banca: Hans-Ulrich Pilchowski / Resumo: Aplicações recentes de satélites artificiais, principalmente aquelas com finalidades geodinâmicas e altimétricas, requerem órbitas determinadas com bastante precisão. Em particular as marés terrestres alteram o geopotencial, causando perturbações adicionais no movimento do satélite. Tais perturbações, apesar de pequenas, têm sido detectadas. O presente trabalho trata de perturbações de órbitas de satélites artificiais devidas às marés terrestres. Ênfase é dada aos termos seculares e de longo período. O potencial foi desenvolvido em termos dos elementos orbitais e substituídos nas equações planetárias de Lagrange. Soluções analíticas estão apresentadas para casos particulares considerando os números de Love constantes. Um programa foi elaborado, e colocado a disposição do usuário, permitindo calcular, para um dado satélite, a amplitude e o período dos termos perturbadores mais significativos. / Abstract: Recent applications of artificial satellites, mainly those of geodynamics and altimetric purposes, requires high precise orbit determination. Particularly, Earth tides change the geopotencial causing additional perturbation in the satellite orbital motion. Inspite of being very small such perturbations, has been detected. The present work concerns about orbit perturbations of artificial satellites due do terrestrial tides. Treatment of secular and long period terms is emphasized. The potencial was developed in terms of the orbital elements and substituted in the Lagrange equations. Analytical solutions are presented for particular cases considering the Love's number as constant. A computer enabling to compute, for a given satellite, the amplitude and period of the more significant disturbing terms, was constructed and it is, at the disposal for users. / Mestre
28

Propuesta para la actualización del diseño geométrico de la carretera Chancos – Vicos – Wiash según criterios de seguridad y economía

Alvarado Peralta, Wilder Eduardo, Martinez Cárdenas, Lorena Silvana 01 November 2017 (has links)
Las carreteras representan uno de los mayores ejes de desarrollo en el Perú. Desafortunadamente, según la SINAC existe un 85% de vías no pavimentadas, que en su mayoría presentan deficiencias geométricas. La carretera Chancos – Vicos – Wiash de 9.796 km de longitud, se encuentra ubicada en el departamento de Ancash, provincia de Carhuaz distrito de Marcará. Las principales actividades económicas que realizan las comunidades que integran esta carretera son: agricultura, ganadería, minería y turismo. Las cuales se ven afectadas por los numerosos accidentes de tránsitos, largas horas de viaje, elevados costos de pasaje, etc. Producidos por las deficiencias geométricas de la carretera en mención. La presente tesis propone como solución a las deficiencias geométricas de la carretera Chancos – Vicos – Wiash, un diseño actualizado basado en el manual DG2014 que brinde alineaciones y dimensiones necesarias para salvaguardar la seguridad e integridad de los usuarios dentro del marco de viabilidad económica. Para la propuesta se aplicó metodología mixta, donde se realizaron trabajos de campo corroborando la situación actual de la carretera y extraer los parámetros necesarios para el diseño. La actualización del diseño fue modelada en el software Vehicle Tracking con el objetivo de comprobar la trayectoria segura del vehículo de diseño dentro de las nuevas dimensiones y alineamientos. A demás se realizó un análisis económico para asegurar la viabilidad del proyecto. Como resultado de la propuesta se obtuvo la actualización del diseño geométrico con las siguientes características: radios mínimos de 25m, pendientes máximas de 8.00%, calzadas de 6.00 m de ancho y una velocidad diseño de 40 y 30 km/h según los tramos desarrollados. Con la ayuda del software Vehicle Tracking se comprobó la correcta circulación de vehículos de 3 ejes en ambos carriles. Por otra parte, se adicionó señalización vertical para mitigar riesgos y accidentes. Finalmente, el análisis económico indica un ahorro social de 2 223 821.20 soles, un VANS de 3 284 192.43 y un TIR de 18%. Dichos estos resultados, se responde al cumplimiento del objetivo de la presente tesis. / Roads represent one of the main development axis in Peru. Unfortunately, according to SINAC there is 85% of unpaved roads, which mostly have geometrical deficiencies. The Chancos - Vicos - Wiash road, 9,796 km length, is located in Ancash department, Carhuaz province district of Marcará. The main economic activities of people from these road communities are: agriculture, livestock, mining and tourism. Which are affected by the numerous traffic accidents, long hours of travel, high ticket costs. Produced by the geometrical problems of the aforementioned road. This thesis proposes as a solution to the geometric deficiencies of the Chancos - Vicos - Wiash road, an updated design based on the DG2014 manual that provides alignments and dimensions necessary to protect the safety and integrity of the users within the framework of economic viability. For the proposal, mixed methodology was applied, where field work was done to verify the current situation of the road and extract the necessary parameters for the design. The design update was modeled in the Vehicle Tracking software with the objective of checking the safe trajectory of the design vehicle within the new dimensions and alignments. In addition, an economic analysis was carried out to ensure the viability of the project. As a result of the proposal, the geometric design update was obtained with the following characteristics: minimum radius of 25m, maximum slopes of 8.00%, roadways of 6.00m width and a design speed of 40 and 30 km / h according to the sections developed. With the help of the Vehicle Tracking software, the correct circulation of 3-axle vehicles was verified in both lanes. On the other hand, vertical road sign was added to mitigate risks and accidents. Finally, the economic analysis indicates a social saving of 2 223 821.20 pen. NPSV of 3 284 192.43 and SIRR of 18%. Given these results, the objective of this thesis was met.
29

Terminal terrestre en la provincia de Pisco

Tataje, Gisell 01 September 2017 (has links)
La ciudad de Pisco se ha convertido estos últimos años en un punto de desarrollo de gran importancia en la zona sur del Perú debido a varios factores: una demanda elevada de turismo, una creciente inversión hotelera, la construcción de un aeropuerto internacional, la realización de grandes proyectos como el futuro Mega Puerto San Martín, entre otros. Existe un estudio de ordenamiento urbano denominado Plan director – Plan de acción a cargo del arquitecto urbanista Jorge Ruiz de Somocurcio, que plantea y justifica la ubicación de un terminal terrestre en la provincia de Pisco. Se tomó este estudio como punto de partida para el desarrollo y diseño de un terminal terrestre que ofrezca servicios que se ajusten a las necesidades y requerimientos de calidad. Esta investigación se realizó empleando parámetros internacionales debido a la falta de una reglamentación base en nuestro país y logra proveer criterios para el desarrollo de esta tipología como programación arquitectónica (determinación de usuarios y ambientes), actividades y necesidades, cálculos de áreas, características de ambientes, etc. Como resultado del análisis, se propone un Terminal Terrestre en la provincia de Pisco con nuevas tecnologías, utilizando energías renovables mediante paneles solares y extractores eólicos y que cuente con una planta de tratamiento de agua (debido a la falta del recurso hídrico en la ciudad). Estas consideraciones pretenden fomentar la eficiencia energética para que la edificación no cause un gasto innecesario de energía y tome en cuenta el medio ambiente.
30

[en] INTEGRATED LOGISTIC SUPPORT FOR ON-SHORE PIPELINE CONSTRUCTION / [pt] APOIO LOGÍSTICO INTEGRADO PARA CONSTRUÇÃO E MONTAGEM DE DUTOS TERRESTRES

ERICA SOARES FONTES 28 June 2016 (has links)
[pt] Este trabalho desenvolveu-se no ambiente das obras de dutos terrestres. Por meio de pesquisa bibliográfica, procurou-se adequar as práticas logísticas usadas em operações militares (logística expedicionária) às atividades de construção e montagem de dutos, em função de não existir, atualmente, um processo de planejamento integrado para as atividades logísticas em obras dessa natureza. Inicialmente, serão apresentados atividades, equipamentos, materiais e mão-de-obra utilizada na construção e montagem de dutos. Em seguida, serão discutidos seus problemas e particularidades logísticas, dos quais pode-se destacar o deslocamento permanente de máquinas , equipamentos, veículos pesados, pessoas, alojamentos, alimentos e energia, por locais sem infra-estrutura de acesso; e o abastecimento dos materiais empregados na obra, dos bens de subsistência , medicamentos, mão-de-obra e combustível para os veículos pesados, entre outros, ao longo da faixa de dutos, durante toda a construção. Serão estudadas as características logísticas de uma operação militar, principalmente no que se refere ao transporte e abastecimento, abertura de vias de acesso em matas fechadas, transposição de rios, subsistência das tropas, logística de saúde, deslocamento de equipamentos e de veículos de apoio. Assim, pretende-se propor o uso de algumas práticas da logística expedicionária nas atividades de construção e montagem de dutos terrestres, a fim de se obter uma estrutura mais enxuta e produtiva. / [en] This work was developed in the context of an onshore pipeline construction. Through a bibliography research, it looked forward to adapt the logistics practices that are used in military operations (expeditionary logistics) to the activities of the construction and assembly of a pipeline. Nowadays there is no integrated planning process for logistics activities for works of this nature. First of all, the activities, equipments, materials and labor that are used in the pipeline construction will be presented. Next, its problems and logistics peculiarities will be discussed, where some aspects can be stand out like the permanent dislocation of machines, equipments, heavy vehicles, people, accommodation, food and energy, to places without access infrastructure; and the supply of materials used in the construction, subsistence goods, medicine, labor and fuel for the heavy vehicles, across the pipeline way, during all the construction. Logistics characteristics of a military operation will be studied, principally when it talk about transportation and supply, opening access roads in closed forests, river transportation, subsistence of the troops, logistic of health, dislocation of equipment and support vehicles. So, it is intended to propose the use of some logistics expeditionary practices in the activities of construction and assembly of an onshore pipeline, in order to obtain a more productive and leaner structure.

Page generated in 0.0876 seconds