• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 6
  • Tagged with
  • 6
  • 6
  • 4
  • 4
  • 4
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Análisis y mejora en los procesos administrativos de la Empresa Inversiones Múltiples Camelot S.R.L

Chalco Añaños, Sara Edita January 2015 (has links)
El presente trabajo de investigación tiene como objetivo diseñar e implementar un sistema integral que permita mejorar la gestión de los procesos de cobranza y la entrega de los servicios en la empresa Inversiones Múltiples Camelot S.R.L; para ello se utilizó metodologías como las 5S, Lean Services y la Gestión por Procesos. Utilizando las metodologías mencionadas se logró reducir los reclamos de los clientes, los tiempos de entrega y los tiempos de cobranza, ello ayudó a mejorar el desempeño global de la empresa mencionada. Se puede afirmar que la metodología de las 5S ayudó a los empleados adquirir disciplina, reducir el movimiento innecesario y mejorar la eficiencia del trabajo; el Lean Service ayudó a crear una estructura organizativa clara para que se lleve a cabo la prestación de servicios con menores costes posibles; y mediante la Gestión por Procesos se buscó la constante satisfacción de sus clientes.
2

Mejora del proceso productivo de una línea de conservas de caballa para reducir el tiempo en el llenado del coche en una empresa pesquera

Ortiz Castro, Gino Charles January 2015 (has links)
La investigación se desarrolló en una empresa productora y comercializadora de todo tipo de conservas a base de diversos pescados, dentro de su oferta tienen diversas presentaciones, una de ellas son las conservas de caballa. Precisamente en esta línea de producción se presentaba el problema a resolver: excesivo tiempo muerto en el traslado manual del producto, mediante coches, de la línea a la autoclave. Este proyecto se enfocó específicamente en mejorar el proceso productivo, reduciendo tiempos en la producción de la elaboración de la caballa, implementando una paletizadora y modificando el coche a estibar que pasa a la autoclave. Con esta mejora, se ha logrado reducir en un 93% el llenado de coche de autoclave. The research was conducted at a producer and marketer of all kinds of canned fish using diverse within its range they have different presentations, one of which is canned mackerel. Precisely in this production line was presented the problem to solve: excessive downtime in the manual transfer of the product by car, line the autoclave. This project is specifically focused on improving the production process, reducing time in the production of mackerel developing, implementing and modifying palletizing stow the car passing the autoclave. With this improvement, it has been reduced by 93% the car filled autoclave.
3

Análisis y mejora en los procesos administrativos de la empresa inversiones múltiples camelot s.r.l

Chalco Añaños, Sara E. January 2015 (has links)
El presente trabajo de investigación tiene como objetivo diseñar e implementar un sistema integral que permita mejorar la gestión de los procesos de cobranza y la entrega de los servicios en la empresa Inversiones Múltiples Camelot S.R.L; para ello se utilizó metodologías como las 5S, Lean Services y la Gestión por Procesos. Utilizando las metodologías mencionadas se logró reducir los reclamos de los clientes, los tiempos de entrega y los tiempos de cobranza, ello ayudó a mejorar el desempeño global de la empresa mencionada. Se puede afirmar que la metodología de las 5S ayudó a los empleados adquirir disciplina, reducir el movimiento innecesario y mejorar la eficiencia del trabajo; el Lean Service ayudó a crear una estructura organizativa clara para que se lleve a cabo la prestación de servicios con menores costes posibles; y mediante la Gestión por Procesos se buscó la constante satisfacción de sus clientes.
4

Mejoras en la gestión de abastecimiento para optimizar el tiempo de entrega de filtros y alistamientos al servicio técnico de la empresa CGM Rental, Lima - Perú

Gilbert Huaynate, Lida Paola, Pinedo Saldaña, Madeli Natalia January 2015 (has links)
En la presente tesis se investigó sobre si las mejoras en la gestión de abastecimiento de filtros y alistamientos, optimizaría el tiempo de entrega al área de servicio técnico de la empresa CGM RENTAL S.A.C., ya que estas demoras han suscitado que el área de servicio técnico no pueda realizar los mantenimientos oportunos de los equipos ocasionando que los equipos presenten problemas por mal funcionamiento, desmovilización de equipos en obra , retrasos en los despachos de los equipos, entre otras lo que representa una pérdida considerable de ingresos para la empresa. Se expone como objetivo mejorar la gestión de abastecimiento; para lo cual se plantea identificar el nivel de rotación de los filtros y alistamientos; calcular sus stocks de seguridad e implementar una correcta planificación de compras. Se utilizó la información obtenida del sistema SAP (Sistemas, Aplicaciones y Producto) para poder comparar el estado de las atenciones al inicio de la tesis con el estado de las atenciones una vez aplicadas las mejoras; para ello se tomó una muestra de 341 OTS (ordenes de trabajo del área de servicio técnico) se utilizaron tablas dinámicas, diagrama de Pareto entre otros conocimientos propios de la ingeniería así como un análisis detallado de la información Se logró confirmar nuestra hipótesis ya que identificando los repuestos de alta rotación, calculando sus stocks de seguridad y mejorando la gestión de compras, se llegó a reducir el tiempo de entrega a servicio técnico. In this thesis we investigated whether improvements in the management of supply of filters and setups, optimize the time of delivery to the area of technical service of the company CGM RENTAL SAC, as these delays have raised the area of service no can make timely maintenance of equipment causing equipment malfunction problems arise, demobilization of equipment on site, delays in deliveries of equipment, including representing a considerable loss of revenue for the company. It is exposed aimed at improving the management of supply; which it is proposed to identify the level of rotation filters and setups; calculating their stocks up and implement proper procurement planning. Information obtained from SAP (Systems, Applications and Products) was used to compare the state of the attention at the beginning of the thesis with the state of the attention once implemented improvements; For this, a sample of 341 OTS (work orders service area) took pivot tables were used, among others Pareto own knowledge of engineering and a detailed analysis of the information They managed to confirm our hypothesis as identifying parts of high rotation, calculating their safety stocks and improving procurement management, it was to reduce the time for service delivery.
5

Modelo de planificación y control de la producción para aumentar las entregas a tiempo a través de Demand-Driven MRP y PDCA en un entorno Make-to-Order de la industria no primaria manufacturera / Production planning and control model to increase deliveries on time through Demand-Driven MRP and PDCA in a Make-to-Order environment in the non-primary manufacturing industry

Franco Quispe, Daeli Sonia, Yauri Tito, Diana de las Mercedes 22 January 2021 (has links)
Hoy en día, las empresas de manufactura lidian con un entorno de producción dinámico, en los cuales el tiempo de entrega es el criterio fundamental para captar pedidos. Los sistemas de planificación y control de la producción (PPC) han venido jugado un papel crucial, sin embargo, en este nuevo contexto, los modelos más conocidos de PPC ya no satisfacen las necesidades de las organizaciones. Es así como este artículo propone un modelo de PPC basado en el sistema Demand-Driven MRP apoyado por las etapas del ciclo PDCA a fin de que se pueda desempeñar de manera óptima en entornos dinámicos como los modelos de fabricación make-to-order. Como resultado de la simulación en el caso de estudio se obtuvo el 100% de cumplimiento de entregas a tiempo y una reducción del lead time en 50.33%. Por tanto, se concluye que el modelo propuesto es aplicable y beneficioso en dicho contexto. / Nowadays, manufacturing companies deal with a dynamic production environment, in which delivery time is the fundamental criterion to get orders. Production planning and control (PPC) systems have played a crucial role, however, in this new context, the most popular PPC models no longer meet the needs of organizations. This is how this article proposes a PPC model based on the Demand-Driven MRP system supported by the stages of the PDCA cycle so that it can perform optimally in dynamic environments such as make-to-order manufacturing models. As a result of the simulation in the case study, 100% compliance with deliveries on time was obtained and a reduction in lead time by 50.33%. Therefore, it is concluded that the proposed model is applicable and beneficial in this context. / Trabajo de investigación
6

Propuesta de mejora en las operaciones para el cumplimiento de tiempos de entrega en el servicio de una empresa de transporte de carga multimodal a través del diseño de rutas y metodología BPM / Proposal of improvement in the operations for service delivery times fulfillment of a multimodal freight forwarding company through route design and BPM methodology

Lostaunau Nuñez, José Roberto Luis, Nores Villaverde, Marjorie 02 November 2021 (has links)
El presente trabajo manifiesta la situación del sector transporte donde se reconoce que las empresas de este sector contribuyen a una participación importante del PBI. Sin embargo, gran parte de estas empresas no cumplen al 100% las expectativas que tienen los clientes sobre el nivel de servicio esperado, afectando la competitividad de estas. El presente proyecto pretende abordar la problemática, la cual se centra en las entregas fuera de tiempo de la mercadería de los clientes, la cual origina que el servicio no sea aceptable. Dicha problemática engloba principalmente los siguientes procesos: recepción y almacenamiento, programación y despacho y seguimiento y entrega. Como solución, se propone una planificación de rutas de los puntos de entrega, y mejorar los procesos en el área operativa de la empresa, basándose en la metodología BPM. Para validar el proyecto, se realizará una simulación, la cual imitará el funcionamiento del sistema del área de operaciones de la empresa enfocada en los tres procesos ya mencionados. / This project shows the situation of the transport sector where is acknowledged that the companies in this specific sector have an important contribution of the GDP. However, a large part of these companies does not accomplish the 100% of the customer’s expectations according to the level of service estimated, affecting their competitiveness. This project aims to address the problem, which it is focused on the deliveries out of time of the customer’s merchandise, that causes the service to be unacceptable. This problem involves the processes of reception & storage, scheduling & dispatch, and monitoring & delivery. As a solution, the project proposes a route planning of the company's delivery points, and an improvement of the process in the operational area of the company, based on the BPM methodology. To validate the project, a simulation will be executed, which will imitate the operations of the company’s operations area, focused on the three processes already mentioned / Trabajo de Suficiencia Profesional

Page generated in 0.0952 seconds