• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 38
  • 3
  • 2
  • Tagged with
  • 43
  • 43
  • 38
  • 37
  • 34
  • 34
  • 33
  • 27
  • 26
  • 26
  • 25
  • 24
  • 22
  • 22
  • 21
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
31

Vybrané části STP výrobní haly s administrativní budovou v Hustopečích / Selected parts of the Construction-technology Project of a Factory Building with an Administration Building in Hustopeče

Zálešák, Vít January 2012 (has links)
The diploma thesis is engaged of selected parts of the construction-technology project of a factory building with an administration building in Hustopeče. The construction-technology project contains technical account construction of technological solutions, project of temporary works designed to perform construction, time and financial plan and detailed time plan for rough construction, includes inspection and test plan and technological standard for solution of lower structures of solutions object. In another input is made technological study of the chief technological stage and budget for rough lower structures. As specialization is solution fire safety of buildings.
32

Stavebně technologického řešení Vzdělávacího komplexu v Brně / Technological solution for the education complex in Brno

Blažek, David January 2012 (has links)
This master’s thesis deals with construction of the gross building of new building of learning complex FEKT VUT in Brno. It contains the design of earthworks, underground setting piles, monolithic structures and isolation of the building for further construction. Construction and technological project includes technical report, time and financial plan of construction, study of the implementation of major technological stages of site preparation, budget of facilities, technological regulation to solved stages, inspection and test plan of monolithic structures, health and safety plan and energy label of objects.
33

Řízení projektu výstavby stavebního celku z pohledu dodavatele / Management of the Construction Project from Contractor's Point of View

Dvořák, Filip January 2012 (has links)
The thesis is dedicated to and at the same time explains the basic concepts concerning the management of the construction project from contractor's point of view. The aim of this work is guided by the principles, methods and procedures of the management during the construction project and their application to practical project of construction ,,Sportovní hala“ in Nové Veselí.
34

Stavebně technologický projekt výrobní haly s přístavbou v Poličce / Construction-technological project of production hall with extension in Polička

Holubář, Zdeněk Unknown Date (has links)
This diploma thesis is dealing with a construction-technological project of a production hall in Polička. The main subject of the thesis is a technological report, a realization study of the main technological phases, a coordination situation of the construction with broader relations to transport routes, a project of the office building site equipment, a suggested list of the main construction vehicles, a time plan for the main building object, technological prescriptions for a prefabricated skeleton and bored piles and documents related to this.
35

Příprava a organizace výstavby výrobního areálu / Preparation and organization of the production area's construction facility

Řeháček, Martin January 2013 (has links)
This master’s thesis relate to the preparation and organization of the production area’s construction of the SPEDUR company in Žďár nad Sázavou. The thesis contents technical report on the construction technological project, construction site, time plans, project of the equipment site, draft of the mechanisms, control and testing plan, environmental plan, risks of safety and health at work and calculation for this construction.
36

Stavebně technologický projekt sídla firmy Snowboard Zezula / Construction technology project of Company Snowboard Zezula

Němec, Martin January 2014 (has links)
In this master´s thesis I am focusing on the Construction technology project of Snowboard Zezula Company. Major part of my thesis informs on a technical report for a construction technology project, a time and a financial plan of a construction, a realization study of the main technological stage, a plan of the main construction mechanism, a project of a construction site device with drawings, a financial calculation of the construction site devices and some technological rules, checking and testing plan for designed operations. Lastly I compare the two different designs of a load-bearing construction level and I calculate time of sheat removing with the economical calculation of the work fissure number.
37

Rezidence Sochorova - bytový dům BD 2, stavebně technologický projekt / Residence Sochorova - apartment building BD 2, construction and technology project

Vybíral, David January 2015 (has links)
This thesis describes the building of a residential house called Rezidence Sochorova BD02 in Brno, Žabovřesky. The aim was the creation of the main parts of a constructional-technological project focused on the design of transport relations, the construction site facilities and its machinery, the creation of selected technological regulations and their control and testing plans. To secure safety and to protect health during the construction work itself, a risk plan and a suggestion of safety aids was created. In addition, an itemized budget of the construction, a time plan, environmental protection and a financial and time comparison of using a hopper in contrast to a concrete pump.
38

Distribuční sklady v Praze - stavebně technologický projekt / Distribution warehouses in Prague - construction technology project

Lupač, David January 2017 (has links)
The subject of this thesis is the construction and technological project for distribution warehouses in Prague. Textual part contains a technical report on construction technology project, wider relations of traffic routes with marked critical points, the study of the main technological stages of the building, principles of organization of construction, design of the main building machines and mechanisms, technological regulations, inspection and test plans, health and safety on the site. In the section with attachments there is a map of the locality, drawings of site facilities, including road signs, charts of the movement of machines, the schedule of the main building structure, the budget of the main building structure, a plan for securing material resources, time and financial plan, an economic evaluation of site facilities, details and other technical documentation stages.
39

Prodejní a servisní centrum Praha – stavebně technologický projekt / Sales and service center Prague - the building technological project

Trhlík, Lukáš January 2012 (has links)
In this diploma thesis deals with execution of ground works, foundation constructions, steel and armored concrete monolithic framework of the sales and service center in Prague. Establishment of the building will be done on armored concrete basement feet, strips and basement plate. The building is desinged in part as a steel framework and in part as a armored concrete framework. The building technological project contains for the phases primarily time and financial plan of object, technology prescription, time schedule, budget, model of the building site accessories, model of the machines, check and test plan, safety plan.
40

Příprava realizace rozhledny Kelčský Javorník, Rajnochovice / Preparation of the implementation of Kelčský Javorník Lookout Tower, Rajnochovice

Vokurek, Kamil Unknown Date (has links)
This diploma thesis is based on preparation of the implementation of Kelčský Javorník Lookout Tower in Rajnochovice. The main idea of the lookout tower constructing is to increase the local tourism. Diploma thesis assesses the whole project and it is focused on the foundation of the rough lower construction and also on assembly of the higher construction. Planning was assessed in terms of time, finance and in terms of the use of material resources. The quality of construction will be ensured by created inspection and test plans. To increase the overall service life of the structures, a scheduled maintenance schedule was designed. A variant solution of electricity supply was proposed, which will shorten the construction time, reduce the total construction costs and the overall maintenance of the building during its lifetime.

Page generated in 0.0716 seconds