• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 161
  • 10
  • 5
  • 1
  • 1
  • Tagged with
  • 178
  • 178
  • 145
  • 131
  • 131
  • 129
  • 129
  • 128
  • 125
  • 122
  • 119
  • 114
  • 113
  • 111
  • 109
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
111

Soubor bytových domů v lokalitě SM6, Staré Město - příprava realizace stavby / Set of residential buildings in SM6, Staré Město - Project planning implementation of construction

Běťák, Rostislav January 2014 (has links)
The master thesis with the name Set of residential buildings in SM6, Staré Město - Project planning implementation of construction solves preparation and realization of building. The aim of master thesis is to design of time, financial, material and human resources. The thesis contains calculation, time schedule, building-site, technologicals standards, controls and trials plans, design of mechanism, study of realization of the main stages. The thesis is prepared on the basis of project documents provided by the investor with the approval of the design office.
112

Penzion Skalka-stavebně technologický projekt / Pension Skalka-building and technological project

Patočka, Bronislav January 2014 (has links)
This master´s thesis solves the building and technological project of a new guest house building in the village Skalka u Prostějova. It is a detached building made of brick masonry. The project contains the building of guest house and gabion retaining wall with parking place. Thesis is comprised of, inter alia, technological sketch of the main phases of building, time and financial plan, site facilities project, machinery proposal, budgets, technological rules and inspection and test plan.
113

Bytová výstavba jako developerský projekt / Residential Construction as a Development Project

Škarka, Jan January 2015 (has links)
This thesis is concerned with developer project Rezidence Austerlitz in Slavkov u Brna realized by KALÁB company. It describes managing this project from buying the grounds to selling the real estate to clients. At the same time the thesis deals with the project's financing, time schedule and assesses market and construction risks. Part of the work is also analyzing the estate market which adverts to evolution of housing construction across the whole Czech Republic in the past ten years. Progress of real estate construction in Jihomoravský kraj is described in detail, including the progress of estate valuation.
114

Centrální sklad ložisek ZKL v Brně - stavebně technologický projekt / Central bearing warehouse ZKL in Brno - construction technological project

Karabcová, Eva January 2015 (has links)
The content of this work is the implementation of the construction technological project of central bearing warehouse ZKL in Brno. The building serves for storage purposes predominantly. This thesis contains general information about construction, content construction technological project, technology report of storage and residential proposal of mechanical assembly, technological prescription for prefabricated scaffold and cladding panels construction Kingspan, report of healthand safety on the construction site, technology report description transportation, inspection and test plans and environmental plan. Budget and time schedule of the main object, calculation, time and financial plan of whole building is contained in supplements. In pursuance of second task, the thesis compares financial and time point of view of two technologies of making stairways.
115

Výrobní hala s administrativní částí v Ústí nad Orlicí - Hylváty, stavebně technologická příprava stavby / Production hall with an administrative part in Ústí n Orlicí - Hylváty, civil technological project

Dobrovská, Monika January 2016 (has links)
The subject of the thesis is the construction and technological preparation of a production hall building with an administrative part in Ústí nad Orlicí – Hylváty. For the construction project a technical report, site equipment, studies of technological implementation, a time and financial schedule, a design of the main building machines and mechanisms, a time schedule and time standard, technological specification and the relevant inspection and test plans will be written. The other task includes a comparison of the two building envelope technologies, a contract for work, a plan of risks for the building evelope and pattern moving mechanical assemblies. The subject, which I deal with in this thesis, is in the field of constructions- selected details of the building envelope preparation.
116

Obchodní centrum Orlová - stavebně technologický projekt / Business Center Orlova - building and technological project

Maléřová, Tereza January 2016 (has links)
This Diploma thesis processes construction of a retail centre in Orlová Town, considering technology, finance and time aspects. Attention is focused mainly on the building process of the main premise – the structure of retail centre. Significant part of this dissertation consists of the technology study specifying readiness, proceedings and consequences of particular operations. In following chapters the main machine, substance and human resources and theire employment in place and time will be defined. More precise technology methods for chosen processes as well as quality standards in assesment and evaluation plan will be provided together with risk adjustment and risk management. In addition the Technical Report for equipment used in construction site will be submited, completed with sketches of construction-site equipment for chosen building stages. Financial and time schedule based on the technical and economy indicators will be provided for the complex of Retail centre, followed by precise time schedule. The impact of increased noise level caused by construction process will be evaluated in acoustic study and revelant precautions will be proposed and their effectivity verified.
117

Vybrané části stavebně technologického projektu - Bytový dům Novostrašnická / The selected parts of construction technology project - Apartment building Novostrašnická

Věrný, Roman January 2016 (has links)
This thesis is focused on selected parts of building technological project of apartment house Novostrašnická in Prague. The project contained technical report, coordinating situation with distinguished traffic routes, object-oriented time and financial plan, study of essential technological phases, report of building equipment and drawing of building equipment for different phases, the design of mechanical arrangement, the work schedule for fabric, plan for securing material resources, technological prescript and control trial plan for drilled piles, budget and design of lifting mechanisms.
118

Soukromá klinika Slavkov - stavebně technologický projekt / Private clinic Slavkov - building and technological project

Hartenberger, Lukáš January 2016 (has links)
The subject of my thesis is the construction and technological project of the new private clinics in Slavkov near Brno in South Moravia. The main goal of my work is a study of implementation of major technological stages of building. These technological steps will cover the main building. This study will be established timetable. Furthermore, the project will be processed construction site, the design of the main building machines and mechanisms, with the budget bill of quantities for the main building structure. Technological specification and control plan is prepared for the realization of construction scaffolding, flat roofs and implementation envelope. Re-entering the occupational health and safety plan for the aforementioned works.
119

Stavebně technologický projekt bytového domu v Boskovicích / Construction technological project of apartment block in Boskovice

Procházková, Šárka January 2016 (has links)
Content of this master‘s thesis is construction technological project of apartment block in Boskovice. The masters’s thesis contains technical report of the building, suggested construction site installations, proposal of suitable machines and mechanisms required for construction, further it solves wider relations of transport lines to construction site, budget and time schedule. Detailed procedure of assembly of the load-bearing roof truss and the roof sheathing is provided in specifications. Safety and health protection, control and test plans are elaborated for stage of the building roofing.
120

"Tyršův most" Litoměřice, příprava realizace stavby / "Tyršův bridge" Litomerice, preparation of implementation

Cupl, Jiří January 2016 (has links)
Master's thesis process construction technology preparation and implementation of project "Tyršův Bridge" in Litomerice. Because condition of bridges is very poor, it was decided to reconstruction them. This is a design for reconstruction of bridges, roads and road-bed on the system of Tyršův Bridge in Litomerice to the extent of the diploma work. During the reconstruction will replace bridges registration no. 15-040 and 15-041 new ones of the same lightness, on the bridge registration no. 15-042 will be replaced roadway and bridge ev.č. 15-043 will be replaced and the structure of the supports. Will be extended road-bed between bridges registration no. 15-040 and 15-041 using gabion construction.

Page generated in 0.0789 seconds