• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 161
  • 10
  • 5
  • 1
  • 1
  • Tagged with
  • 178
  • 178
  • 145
  • 131
  • 131
  • 129
  • 129
  • 128
  • 125
  • 122
  • 119
  • 114
  • 113
  • 111
  • 109
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
91

Příprava realizace multifunkčniho objektu Technologického parku v Brně / Preparation of realization of multifunctional building of Technology Park in Brno

Bartl, Jan January 2020 (has links)
The theme of my diploma thesis is a preparation of realization of administrative building, The Czech Technological park Brno. Thesis contains a technical report of the technological project, a mechanical assembly, a technological specification of monolithic structure contains a included inspection and test plan and a calculation of the formwork time. It also includes the project of construction zone solution, a time schedule, a time and financial plan, an itemized budget and bill of quantities, a calculation of buildings according to THU, a transport routes. Part of the thesis are also selected a LEED certification credits and safety and a health protection during work plan.
92

Bytový komplex Netroufalky, objekt F - stavebně technologický projekt / Apartment complex Netroufalky, building F - building technology project

Čermák, Jan January 2020 (has links)
The subject of the diploma thesis is to elaborate a selected part of the construction technology project for an apartment building in the Campus residential complex II, situated in Brno – Bohunice. Specifically, an apartment building (object F, designated SO 204) was selected, on which monolithic structures of the substructure will be solved. The content of the work is a technical report to the construction technology project, evaluation of transport routes, elaboration of technological regulations for selected technological stages, time schedule for the selected stage and partial detailed section of a typical floor. Furthermore, the construction site equipment with drawing and text part, control and test plan, itemized budget with bill of quantities, design of machine assemblies and work safety solutions are elaborated.
93

Administrativní budova s provozními sklady - stavebně technologický projekt / Administrative building with operational warehouses - construction technology project

Hirsch, Roman January 2020 (has links)
The focus of this thesis is on the description of realization of administrative building with operational warehouses in Brno. The thesis consists of report on construction and technology, study of the realization of the main technological stages, technical report on site technologies, technical report on wider transportation connections, proposal for the machinery assembly, time schedule, detailed budget, technological guidelines for rein-forced concrete ceiling, control and exam plan for reinforced concrete, report on safety and health protection on construction site, environmental requirements, and in lastly also comparisons of material of contact thermal insulation system, crane proposal, noise study. The thesis consist 15 annexes.
94

Přístavba výrobní haly Simandl v Petrovicích, příprava realizace a řízení stavby / Preparation for Building Realisation and Building Management

Hlinšťák, Filip January 2020 (has links)
The master’s thesis is planning selected parts of preparation and realization of the extension of production hall with warehouses in Petrovice u Karviné. The thesis contains technical reports, solution of wider traffic relations, study of main technological stages, design of building site, design of construction machinery, the technology solutions for installation of roofing including HSF and CTP, design of anchors for roofing, time and financial planning of construction.
95

Stavebně technologický projekt objektu v areálu Rotana / Construction-technological project of the building in the area of Rotana

Kadlec, Michal January 2020 (has links)
The aim of the diploma thesis is to process a construction-technological project of the building in the area Rotana. The aim of the thesis is to propose a suitable implementation procedure of the building. The thesis deals with the time schedule of the main object, itemized budget, major building machines and mechanisms, project of site equipment, study of the main construction phase realization, plan for securing material resources, technical report, time and financial object plan. The thesis also focused on the comparison bracing of foundation with the slopes.
96

Bytový dům AB - Javorová čtvrť II Praha - stavebně technologický projekt / Apartment Building - Javorová čtvrť II Praha - Building Technology Project

Schreiber, Jiří January 2020 (has links)
Theme of the diploma thesis is technical report of the technological project for apartment building AB – Maple district II Prague, which will be realized on Mantovska street, on the plot 539/39 in the district of Horní Měcholupy. For object AB is proccesed technical report of the technological project, studies of realization main technological phases, solution of wider transport relations with a focus on building supply , objects time and financial plan, time schedule, project for site facilities with drawing of five main technological phases, design of main construction machines and mechanisms, technological specification for realization of monolithic reinforced concrete of roughly lower and upper construction, including „white tank“, which forms a peripheral structure of lower construction, balance of workers and main machines, inspection and test plan for constructions from technological specification. As other assignment I make a itemized budget for rough construction, selected points of LEED certification, instructions for using a housing unit and plan of Safety and Helth protection during work.
97

Skladový areál firmy Bidfood - stavebně technologický projekt / Bidfood warehouse - a construction technology project

Špaček, Miroslav January 2020 (has links)
The goal of the thesis is a construction technological project of a Bidfood warehouse. Part of the work is the solution of technological regulation for drilled piles and assembly of steel skeleton, organization of the construction, construction site equipment plan, draft of the main machinery and mechanisms. Technical report, coordination layout with a description of transport options, schedule, and financial plan are also part of this thesis.
98

Stavebně technologická příprava skladového a administrativního objektu v Černé za Bory / Construction-Technological Preparation of Warehouse and Administrative Building in Černá za Bory

Štěpánek, Michal January 2020 (has links)
The aim of this diploma thesis is the construction and technological solution of the warehouse and administrative building in Černá za Bory. The diploma thesis contains technological procedures for assembly of reinforced concrete skeleton and realization of industrial floor. This work solves problems that could arise during the assembly of the skeleton and realization of industrial floor. The thesis contains a construction technology project, a study of the implementation of the main technological stages, the situation of the construction with broader relations of transport routes, the project of construction site equipment and the main design of machines and mechanisms. Furthermore, I created a variant solution of skeleton assembly including financial and time evaluation. Since the project documentation that was provided to me did not include any details for the skeleton placement, I decided to develop design details for the skeleton placement. Subsequently, I developed a plan for occupational safety and health. As a part of this work I made a comparison of industrial floors, both in terms of performance and economic. In order to find out the time demands, I prepared an exact timetable for the implementation of the main building. In order to ensure high safety and quality, I prepared a control and testing plan for the assembly of the skeleton and for the implementation of industrial flooring.
99

Aplikace metodiky Projektového managementu na projektu v podniku / Project Management Methodology Application on Company´s Project

Salaj, Tomáš January 2011 (has links)
Diploma thesis focuses on the development of parking building with commercial premises Rychtářka in Plzeň, which is realized in the form of public and private sector partnership. The thesis deals with effective application of project management methods in light of the general contractor Hermosa Parking Plzeň a.s. Information and knowledge gained in the theoretical part of the thesis are then used in the practical part for the design of project management methodics on development project Rychtářka. The outcome of practical part of the thesis is project management methodic, which should help to secure the optimal solution for complex structured process that leads to the realization of parking building Rychtářka and the compliance with all the specific characteristics of development projects.
100

Využití nástrojů projektového managementu v praxi / The Use of Metohods of the Project Management in Company

Krčmář, Vít January 2015 (has links)
Dissertation deals with a draft of the system for monitoring and planning of attendance of promoters on the stores of the Slovakian store chain NAY, where the project management is used for securing of versatilely effective project. PEST, SWOT, RIPRAN of analysis and analysis of risks are used in this draft. It contains the plan of solution from the schematic imaging to the graphic previews and time schedule of realization. This is the real project from practice which should be realized based on this dissertation and commercially spread and innovated.

Page generated in 0.0558 seconds