61 |
Polyfunkční dům Brno, Černovice - stavebně technologický projekt / Multifunctional house in Brno, Chernivtsi - construction technology projectKondáš, Ondřej January 2017 (has links)
The aim of this master's thesis is the construction-technological project of the entire building focusing on major construction building - Multifunctional house, which is based on large-diameter piles. The main part of thesis are budget of object and time schedules of construction. Part of the thesis is organization of construction and design of the site eguipment, technological regulation of selected work, quality control and solving transport relations including oversize cargo. It also deals with the design of mechanical assemblies, health and safety, safety of environment and design of instructions for use of building.
|
62 |
Příprava a řízení stavební zakázky / Preparation and Management of the Building OrderBartoš, Miroslav January 2015 (has links)
This thesis focuses on the theme of preparation and management of construction work contract in its theoretical and empirical level. Theoretical part deals with the description of contractor’s preparation for construction in the form of supply, pre-production and production preparation. It also deals with the issues of planning in the form of structuring of a building project and its duration, including the description of schedule planning methods. Theoretical part ends with a passage about automated preparation and construction implementation, together with a definition of basic terms concerning private and public procurement. Practical part answers the question of description, analysis and organization of particular construction contract and together with contractor’s administrative treatment of construction preparation meets the appointed target. Closing part consists of a suggestion of methodology for processing contractor’s preparation using Contec software.
|
63 |
Bytový dům Ivančice - stavebně technologický projekt / Apartment building in Ivančice - construction technology projectFejfar, Michal January 2018 (has links)
The subject of the master´s thesis technological project of the Ivančice residential building in Ivančice. The building has one underground and four aboveground floors. The master´s thesis contains a technical report for the building technology project, broader transport routes, a timetable, a financial plan, time schedule, design of construction site installations, design of mechanical assemblies, technological prescription for construction of celling white tank, inspection and test plan, crane and design.
|
64 |
Stavebně technologický projekt domu pro seniory / Construction technological project of a house for seniorsŠaroun, Vít January 2018 (has links)
The aim of the diploma thesis is to make the detailed design project of retirement home in Nové Město na Moravě. This thesis contains a construction technology, summary accompaying technical report, control and test plans, itemized budget, time and financial plan of the carcass object SO01. Finally there is also implementation scheme, situation of site equipment and construction details.
|
65 |
Stavebně technologický projekt rezidenčního domu v Brně / Building and technological project of a residential house in BrnoPodškubka, Martin January 2018 (has links)
The subject of this Diploma thesis is building and technological project of a residential house in Brno, which contain the implementation of the underground car park and residential building, which has three above-ground floors. Attention is focused mainly on the technological processes of bottom building. Text section contains the technical report on the structural and technological project, study implementation of major technological stages of building, technical report of construction site equipment, technological regulations, inspection and test plan, study of noise, plan health and safety at work, the design of the main building machines and mechanisms including transport routes. The attachment section contain time and financial plan construction-object, time deployment of machines, plan of material resources, time schedule, technology standard, budget, drawings of construction site equipment, verification of tower crane construction and schema of processes concreting.
|
66 |
Centrální požární stanice Hradec Králové - stavebně technologický projekt / Central Fire Station in Hradec Kralove - Construction technology projectMalina, Marek January 2018 (has links)
The diploma thesis deals with the formation of a constructive-technological project for the building of the Central Fire Station in Hradec Králové - 1. Phase. The building consists of five floors and one underground. The aim of the thesis is to choose and process suitable solution of the building in terms of financial, time and technical requirements based on the project documentation provided by the designer. The thesis deals with the time and financial plan of the construction, the design of the main machines and mechanisms, the planning of the material supply and its transport routes, the design of the construction site equipment, the technological regulations, the control and testing plan for the monolithic and steel constructions of the building and the time schedule of the building with the technological norm.
|
67 |
D1 Rekonstrukce mostu D1-212 Ostrovačice, příprava realizace stavby / D1 Reconstruction of Bridge on Motorway D1-212 in Ostrovačice, Preparation and Realization of StructureKratochvíl, Tomáš January 2018 (has links)
The diploma thesis deals with preparation and realization of D1 reconstruction of D1-212 bridge in Ostrovačice. It is a motorway bridge that transfers traffic over road II / 386. The reconstruction will demolish the superstructure of bridge with bridge equipment and parts of the abutments and their new construction. The preparation of the project solves the engineering report, the block plan drawing, the financial and time schedule - by objects, the budget SO 201, the study of the implementation of the main construction technologys, the project of the site equipment, the design of the main building machines, the SO 201 time schedule, a desigh of the bill of quantities for structure, technical note for superstructure of a bridge and control and test plans. Part of the preparation of the building is the processing of the emergency plan.
|
68 |
Výrobní hala s administrativní částí v Lanškrouně, příprava a realizace stavby / Production Hall with an Administrative Part in Lanškroun, Planning and Implementation of the ConstructionZajíček, Miroslav January 2018 (has links)
The subject of the thesis is the construction technological planning and implementation of a production hall construction with an administrative part in Lanškroun. The thesis contains a technical report, site equipment, studies of technological implementation, a time and financial schedule, a design of the main building machines and mechanisms, a time schedule and time standard, technological specification and the relevant inspection and test plans will be written.
|
69 |
Novostavba základní školy v Bobrové, stavebně technologický projekt / ProjectKudiovský, Filip January 2018 (has links)
The diploma thesis deals with the construction project of the new building of the primary school in Bobrová. The main goal of the thesis is to propose a suitable implementation procedure in relation to the specific place of the site. The thesis deals with the time schedule of the main object, itemized budget, major building machines and mechanisms, project of site equipment, study of the construction realization, material resources plan, technical report, time schedule and financial plan of the main object and also with the situation of the construction. It focuses in detail on the stage of earthworks, including the reinforcement of the walls of the building pit using soil nailing. For this stage a technological regulation and a control and test plan have been developed.
|
70 |
Stavebně technologický projekt výstavby skladu / Constructive technological project of warehouseŘíha, Tomáš January 2018 (has links)
The aim of the diploma thesis is to elaborate parts of the frozen food warehouse construction project in Dašice in the area of MD logistics as, resulting in the elaboration of a technical report on the building technology project, the coordination situation of the building with the broader relations of the transport routes, the time and financial plan of the construction in the plane of the buildings, implementation of the main technological stages of the main building, drawing of the building site equipment, design of the main building machines, detailed time schedule of the main building, budget line, technological regulation for implementation of foundation structures consisting of drilled pilot and supporting walls, quality control and test plan for the given stage , drawings of the earthworks equipment and the construction of the hall.
|
Page generated in 0.0735 seconds