• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 25
  • 16
  • 3
  • 2
  • 1
  • 1
  • Tagged with
  • 48
  • 9
  • 9
  • 9
  • 8
  • 8
  • 8
  • 8
  • 8
  • 8
  • 8
  • 8
  • 8
  • 7
  • 7
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
41

Aplikace problému Obchodního cestujícího v reálném prostředí distribuční společnosti / Travelling Salesman Problem Application in Particular Logistics Enterprise

Ružička, Vladimír January 2012 (has links)
This paper deals with optimal distribution issues. One may find listed problems of real life linked to distribution. Moreover, there are explained travelling salesman problem, vehicle routing problem and its variants. This work brings an overview of different ways how to solve vehicle routing problem. In practical part, there is an analysis of distribution of real company. The concept of application is presented in the second part of this paper. This concept could reduce costs of distribution in analyzed company. Testing is aimed mainly on the variant VRPCL (Vehicle Routing Problem with Continuos Loading).
42

Stavebně technologický projekt podnikatelského inkubátoru / Constructive technological project of a business incubator

Sviták, Marek January 2018 (has links)
The content of the diploma thesis is the processing of a constructive technological project of a business incubator. The objective of this constructive technological project is to approach the construction process in the framework of the study of the implementation of the main technological stages, which closely follows the project of the site construction equipment with suitable layout of its construction, as well as the design of suitable machinery mechanisms for realization of the main building. Part of the project is also to determine the timeliness of work, financial and material management, and technological regulations for implement selected activities, taking into account the quality control and planning of their implementation. The whole construction process is completed in the final part of the diploma thesis on the solution of the occupational health and safety issues.
43

Montovaná hala, areál firmy Bosh Diesel s r.o. - stavebně technologická příprava stavby. / Prepared hall of the company Bosh Diesel s.r.o. - civil technical project.

Koláček, Ivo January 2019 (has links)
The masters thesis prepares the project of a prefabricated hall in the premises of Bosch Diesel s. r.o. The work completely elaborates the technical report, the coordination situation with the relations to the wider transport routes, the study of the main technological stages, the project of the building site, the design of the machines, the schedule of the main building, the material and human resources, the technological regulations, the control and test plan, safety and health protection during work, noise study, budget and building details.
44

Vliv dlouhých optovláknových tras na polarizační stav světla a jejich využití pro napájení polarizačních senzorů / Long optical fibre routes influence on the polarizing state of light and uses it for powering polarization sensors

Panascí, Marco January 2021 (has links)
This diploma thesis deals with the influence of long fiber optic paths on the polarization state of light and their use for powering polarization sensors. The aim of the diploma thesis was to design the arrangement of optical fiber components so that the polarization properties of light at the end of the path are further usable for sensory purposes. Four partial measurements with a long path (in a laboratory setting, laying in the ground, on a curtain, under the influence of external influence) and one measurement without a path under the influence of external influence were designed. The overall measurement results demonstrate that for the functional power supply of long-distance sensor systems, an existing single-mode fiber can be used (laid by laying in the ground), into which a light source for a given sensor system would be multiplexed. In the discussion, all types of measurements are analyzed and compared with each other. Finally, the overall result is summarized and applications are described in which such a sensor system could be used.
45

Rekonstrukce a přístavba Městského muzea Česká Třebová - příprava realizace a řízení stavby / Reconstruction and exctension of the City Museum Česká Třebová

Strnadová, Lenka January 2014 (has links)
Master thesis solves construction and technological project which deals with data processing, documentation and technological processes of building reconstruction and extension realization in Muzeum of Česká Třebová. The work contains technological building study, assessment of relationships to the wider transportation routes, time and financial plan, building-site organization project, design of the main building machines and mechanisms, technological prescriptions for excavation work and micropile injection, occupational safety and health protection management, project calculation budget.
46

Přístavba hotelu Tři Věžičky ve Stříteži - příprava realizace stavby / Extension of a hotel Tři Věžičky in Střítež - planning of implementation of construction

Pupíková, Ingrid January 2017 (has links)
This thesis solves the construction technology project extension at Three Steeples in Střítež, building apartments. Work includes the complete study of the implementation, including timing and the financial plan, assessment of the wider relations of transport routes, the project site equipment, design of the main building machines and mechanisms, technological specifications for masonry, inspection and test quality plan for walling, technological prescription for clay plasters and itemized budget rough construction of the main building.
47

Návrh rekonstrukce stávající vstupní rozvodny a kabelové sítě 22 kV v areálu fakultní nemocnice / Projet of reconstruction of the 22 kV incoming substation and the cable network in the faculty hospital campus

Komárek, Filip January 2018 (has links)
This master's thesis deals with the area hospital distribution networkand one of the hospital's entry substation. The first part of this master's thesis deals with the project of the new cable network, her gradual revival without any power outages at the collection points. Futher, in this thesis is project of temporary transformer station for supplying power during the reconstruction of the HV switchboard. Subsequently, in this thesis is project of the new HV switchboard in one of the entry substation. new HV switchgear and a new HV substation were projected. Futher, in this thesis is proposed compensation of the whole area, including the HV network.
48

Bytový dům Terasy Havlíčkova - vybrané části STP / The Havlíčkova Terraces Apartment Building - Selected Parts of the Construction and Technological Project

Krejčí, Vlastimil January 2012 (has links)
Architectural and technological project of building the housing Terraces Havlickova contains technical report on construction technology project,coordination situation, building relationships with the wider transport routes, time and financial plan of the building object, study the implementation of major technological stages of a residential building,Project construction site, design of the main building machines,schedule of the main building construction object SO-01,plan for securing material resources for the construction of residential house,technological regulation for the implementation of excavations and roofs,inspection and test plan for the implementation of the excavations and roofs. The other award was prepared itemized budget apartment house SO-01, calculation of construction according to THU, health and safety plan and Listing of security risks and security measures on site

Page generated in 0.0822 seconds