• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • Tagged with
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Optimization of support in rock pillars between two parallel tunnels

Kote, Alexander, Ishaq, Sohaib January 2022 (has links)
When two parallel tunnels are excavated under high to moderate horizontal in-situ stresses combined with minor deformations in the pillar between the tunnels, the in-situ stresses can be redistributed over the tunnels in form of two compressive arches and are transferred from the roof to the abutments of the two tunnels. At additional deformations in the pillar, a new redistribution of the stresses can occur creating one compressive arch over both of the tunnels. This leads to lower vertical stresses in the pillar between the two tunnels. Today, this effect is normally not accounted for in the design of rock support. By accounting for this arching effect, it is possible to design the pillars for a lower load. The aim of this thesis is to analyze how to optimize the rock support (rock bolts) in the pillar by accounting for this potential arching effect in the rock mass. To study this, a sensitivity analyses is performed where the rock mass is represented by three different qualities (very good, good and fair). The geometry of the rock pillar is defined by a height of 6 m and two width dimensions of 3 m and 6 m are used. The in-situ stresses are categorized in three levels: minimal, typical and maximal according to typical conditions in the Stockholm region. Numerical models are analyzed in PLAXIS based on these different conditions. Stress redistribution in the rock is simulated by reducing the modulus of elasticity of the pillar in five stages. Based on the results from the numerical simulations and comparisons against analytical solutions it can be concluded that it is possible to design the pillar for a lower load, which accounts for this secondary arching effect over the two tunnels. The number of bolts could be reduced with at least 1-5 units per meter tunnel for the analyzed cases; thereby reducing the costs and also contribute to a more sustainable use of natural resources. / När parallella tunnlar tas ut i en bergmassa under höga eller måttliga horisontella in-situ spänningar omfördelas de över de båda tunnlarna i form av två tryckbågar och överförs från taket till stöden. Vid ytterligare deformationer i pelaren kan istället ytterligare en omfördelning ske och en tryckbåge över båda tunnlarna skapas. Detta leder till en minskning av de vertikala spänningarna i pelaren mellan de båda tunnlarna. Idag beaktas normalt inte denna effekt vid dimensioneringen av pelarens förstärkning. Genom att beakta denna valveffekt är det möjligt att dimensionera pelarens förstärkning för en lägre last. Syftet med detta arbete är att analysera hur förstärkningen kan optimeras i pelaren genom att beakta denna valveffekt i bergmassan. För att studera detta har en känslighetsanalys genomförts där bergmassan representeras av tre olika kvaliteter (mycket bra, bra och acceptabel). Geometrin för bergpelaren definieras av en höjd på 6 m och två olika bredder på 3 m och 6 m har analyserats. In-situ spänningarna kategoriseras i tre nivåer: minimala, typiska och maximala enligt typiska förhållanden för Stockholmsregionen. Olika numeriska modeller har analyserats i PLAXIS utifrån dessa olika förutsättningar. Spänningsfördelningen i berget simulerades genom att pelarens elasticitetsmodul reducerades i fem steg. Baserat på resultaten från de numeriska analyserna och jämförelser mot analytiska lösningar kan slutsatsen dras att det är möjligt att dimensionera förstärkningen för en lägre last genom att beakta den sekundära valvverkan som kan uppstå i bergmassan över de båda tunnlarna. I de utförda analyserna kunde antalet bergbultar reduceras med mellan 1-5 stycken per meter tunnel; vilket därmed kan bidra till läge kostnader och en mer hållbar användning av naturresurser.

Page generated in 0.0419 seconds