• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • Tagged with
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Standardiserad tidsplanering för SSM i produktionen / Standardized time scheduling for SSM in production

Tahan, Annabel, Al-kazaz, Haydar January 2019 (has links)
Det här examensarbetet har utförts åt företaget SSM där syftet var att standardisera deras tidsplaner och arbetssätt kring planering i produktionen.   Detta arbete har grundat sig på analys av några av SSM:s tidsplaner inom produktion, där dessa har granskats in i minsta detalj. Tre av sex projekt har studerats djupare och författarna har sedan gjort egna standardmallar som baserats på dessa. Utöver detta har även intervjuer/möten hållits med tidsplanerare både inom företaget men även utanför.   Dessa metoder resulterade i slutsatsen att alla platschefer på SSM samt personal på projekteringssidan bör använda sig utav Vico Office i framtiden för att en standardisering av tidsplanerna ska ske. Detta då programmet sparar återanvändbar information från varje projekt som genomförts, vilket på så sätt kan nyttjas i kommande projekt. I programmet finns olika verktyg för hur man väljer att presentera tidsplanen vilka framgår i rapporten.   Efter att ha provat på programmets olika funktioner rekommenderas att företaget använder sig utav det i framtiden då de kan kombinera olika planeringsverktyg samt koppla ihop modellen med bl.a. kostnader, mängder, resurser och tid. Anpassade standardmallar har tagits fram för att förenkla och standardisera tidsplaneringen enligt SSM:s arbetsprocesser. / This thesis has been carried out for the company SSM where the purpose was to standardize their time schedules and also their working methods regarding planning in production.   To achieve this, the thesis has mostly been based on analysis of some of SSM's time schedules in production, where these have been examined in the smallest detail. Three out of six projects have been studied in more depth and the authors have then made their own standard templates based on these. In addition, interviews/meetings have also been held with time planners both within, but also outside the company.   These methods resulted in conclusion that all site managers at SSM and personnel in the design department should use Vico Office in the future in order to standardize the time schedules. This because the program saves reusable information from each project that has been implemented, which can be used in future projects. The program contains various tools, which are stated in the report that allows the user to choose how to present the time schedule.   After trying the different functions of the program, the recommendation is that the company use Vico in the future as they can combine different planning tools and connect the BIM-model with e.g. costs, quantities, resources and time. Custom standard templates have been developed to simplify and standardize time scheduling according to SSM's work processes.

Page generated in 0.0388 seconds