• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 38
  • 25
  • 9
  • 6
  • 5
  • 2
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 93
  • 27
  • 24
  • 22
  • 22
  • 19
  • 16
  • 15
  • 15
  • 15
  • 12
  • 12
  • 10
  • 10
  • 9
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
81

Příprava a organizace výstavby souboru bytových domů ve Štětí / Project planning and management of construction residential houses in the file Štětí

Sládek, Lukáš January 2014 (has links)
The subject of this thesis is the preparation and organization of construction of residential buildings in Štětí. In the technological regulations deal with all the layers of flooring from the ceiling construction in residential buildings. The objects are hard floors. For floor coverings will be used PVC roofing, ceramic tiles and concrete coating. It will be used for machining of concrete. Next, I will discuss technological instruction, timing, valuation of all technological stages, construction site equipment, health and safety at work. Also here describe the proper allocation of construction processes into sub-processes to technological stage of completion of work most effectively achieve the objective.
82

Novostavba administrativní budovy v Blansku / Office Block in Blansko

Zouhar, Martin January 2015 (has links)
The solution of the diploma thesis is the office block in Blansko. Building is suggested for using as insurance company. This building is located in a particular territory which had precisely limited the possibilities of the construction. There are three aboveground floors. The building is designed like reinforced concrete frame with complete masonry type THERM. The building is built on drilled piles that are connected fundamental grate. The facade is made as ceramic aired facade. The building has a flat roof with classical succession layer and is stabilized by gravel. The building is designed for fifty people.
83

Pohřební služba a kamenictví / Funeral service and stonework

Trojan, Jan January 2015 (has links)
A new building stand two single-storey buildings which will be used for the production, housing, sale and storage of the deceased. Objects have rectangular shapes with external dimensions of 9.9 x 24,25 m and 21.0 x 42.85 m. The structures are designed as a vertical system POROTHERM, SPIROLL ceiling and roofing flat roof. The facade will be dealt with silicate plaster rubbing.
84

Stavebně technologický projekt bytového domu v Boskovicích / Construction technological project of apartment block in Boskovice

Procházková, Šárka January 2016 (has links)
Content of this master‘s thesis is construction technological project of apartment block in Boskovice. The masters’s thesis contains technical report of the building, suggested construction site installations, proposal of suitable machines and mechanisms required for construction, further it solves wider relations of transport lines to construction site, budget and time schedule. Detailed procedure of assembly of the load-bearing roof truss and the roof sheathing is provided in specifications. Safety and health protection, control and test plans are elaborated for stage of the building roofing.
85

Bytový komplex LIVE UP v Brně - příprava realizace stavby / LIVE UP apartment complex in Brno - planning of implementation of construction

Dejmalová, Hana January 2017 (has links)
The subject of the master´s thesis are selected parts construction technology project apartment house LIVE UP in Brno – Bohunice. It is a new building with one underground floor and six overground floors. Construction of the house is monolithic and upper floors are bearing masonry walls. The work includes technical reports, study the implementation of major construction phases, organization of the construction, technological regulation of flat single-roof, itemized budget with the statement of measurements, time schedule, inventory of machines.
86

Bytový komplex Kadetka, příprava realizace stavby / Apartment Complex Kadetka, Preparation for Building Realisation

Páleník, Tomáš Unknown Date (has links)
The subject of the diploma thesis is to elaborate a selected part of the construction technology project for Apartment complex Kadetka - preparation for building realisation. Specifically, this is an underground garage and object C. In the course of the creation of project, the objects A and B, incorporated in the project of the construction site equipment, were also taken into account. The content of the work is a technical report to the construction technology project, evaluation of transport routes, time and financial plan, individual realization phases of the main building phase, design of the main building machine and mechanisms, time schedule for rough construction, plan for securing material resources, elaboration of technology regulations for underground monolithic reinforced concrete structures and check and test plan. The thesis also includes an item budget for the apartment house made with Build Power S software.
87

Administrativní budova Lomnického - stavebně technologická příprava stavby / Administrative building Lomnického - Building technology preparation of construction

Hanzlík, Vlastimil January 2019 (has links)
This diploma thesis focuses on the construction and technological preparation of the office building in the Lomnického street. The aim of this work is to choose the appropriate construction process. The thesis contains a technical report of a construction and technological project, solutions of wider transport relations, time and financial object plan, itemized budget, design of a site equipment, design of the main building machines and mechanisms, time schedule, technological regulation, inspection and test plan, calculation of two options of the excavation of building pit and details to waterproofing of the substructure. In detail, the thesis is dedicated to secure the building pit enclosed by diaphragm walls.
88

Městský okruh Blanka, tunel Královská obora - ražená část, stavebně technologická příprava stavby / City circle road Blanka, tunnel Královská obora - mined section, preparation and building construction technology

Kobielusz, Petr January 2013 (has links)
My thesis is focused on process preparation and building construction technology of primary lining road tunnel, implemented in city part of Troja in the capital city Prague. Specifically it is a part of tunnel complex Blanka. The name of this part is Kralovská obora. If the all tunnel parts are built this tunnel complex Blanka can be complemented to already opened tunnels Zlíchovský, Mrázovka and Strahovský which are the part of city traffic circle. This technology preparation includes schedules and financial plans of the building, technological prescription for the primary tunnel lining, safety plan, control and trial/test plans, environmental plan, project of construction site, design of the main working machines, items budget of the north tunnel tube, coordination situation plan with wider relationships transport routes and technical report of building technological project.
89

Bytový dům / Residential Building

Uhlíř, Karel January 2013 (has links)
Diploma thesis develops comprehensive documentation of the new building construction of residential house on the level of the implementation of the project construction. Proposal emphasizes layout of linked to ensure the technical design, structural, fire safety, protection against noise, energy saving, safety in use. Work is performed in an electronic format using AutoCAD and Microsoft Word (PDF Creator).
90

Sportcentrum Broumov / Sports center in Broumov

Volf, Josef January 2014 (has links)
The topic of the masters thesis is newly built sports center in Broumov on the outskirts of the historic center. The proposal was placed high demands on appearance. There is a non-traditional stone facade with a combination of wood ventilated facades. The combination of wood and stone construction gives a historic feel and fit and existing buildings, which will carry the dominant built-up area. The new building is set into the sloping terrain with a flair for existing buildings. The building is part sunk into the ground to reduce the height to the surrounding area. The sports center is divided into three dilatations objects: Technical facilities, sports hall, bowling with squash and gym.

Page generated in 0.0797 seconds