• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 20
  • Tagged with
  • 20
  • 10
  • 6
  • 6
  • 6
  • 5
  • 5
  • 5
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Návrh na zefektivnění procesu obrábění dílu pro vstřikovací formu / Increasing the Efficiency of the Process of Machining Injection Molds Components

Hruška, Lukáš January 2014 (has links)
The aim of this diploma work was a proposal to make the process of machining of injection mould more efficient. The work described the initial state of machining of a moulding injection part from the technological point of splinter machining, including the description of each production areas, the tool used in the process and the machines. The main part of the diploma work was focused on consideration of a possible way leading to the increase in the efficiency of the production process of machining of an injection mould part that included the transfer of the initial way of machining of a moulding injection part to CNC lathe Gildemeister CTX beta 500. Furthermore the work described the tool that had been used including the description of proposed control programs for machining of an injection mould part. The essential part of the work was a techno-economical assessment of the proposed variant of solution, which included analysis of the production costs and the time indexes that were achieved during the production.
12

Racionalizace výroby skříní / Rationalization of production casing

Konečný, Jan January 2015 (has links)
The thesis deals with the reorganization of production injection pump casing, when the existing production solution, using cutting lines, did not meet the requirements for flexible manufacturing. There are handled points leading to the replacement of the line of machining centres after a brief introduction of the company. Among the main points of thesis are the design of operations, choice of tools and cutting conditions, proposal clamping device and technology, techno-economic evaluation of the newly introduced production.
13

Návrh zefektivnění výroby válcové součásti hydraulického systému / Efficiency Improvement Proposal of Production of Cylinder Component of Hydraulic System

Jantač, Marek January 2016 (has links)
The aim of the paper was to proposed new manufacturing technology. In the beginning, the diploma thesis deals with the technological aspects of manufacturing hydraulic valve. Subsequently is described the usage of manufacturing technology. The existing production process is analysed in detail. Better efficiency was achieved by using hard turning instead grinding technology. Economic evaluation is described in the end of thesis, where is efficiency of hard turning technology supported by calculations.
14

Řízení projektů výrobních zakázek / Project Management of Production Orders

Fiala, Ivo January 2016 (has links)
The Diploma thesis deals with process improvements in project management in Alstom Power s.r.o.. The thesis is divided into three basic parts - theoretical, analytical and proposal part. The theoretical part focuses on the description of the analytical methods for examining the business environment, which will afterwards be used to analyse the current state of a company's position in the second part, analytical part, of this work. In the analytical part are identified the same errors during the project implementation. In the last part of the own proposals are presented measures that could eliminate errors and streamline process of the project implementation.
15

Technologie výroby vybraného sortimentu nástrojů s aplikací vysoce produktivního výrobního zařízení / Production technology of selected range of tools with application of high-productivity equipment

Zdařil, David January 2020 (has links)
The aim of this work is to analyze the issue of providing cutting tools for internal use in the company STERCH-INTERNATIONAL s.r.o. It is mainly the production and regrinding of end mills and drills for specific machining applications, whose benefit lies in increased efficiency and flexibility of production, which also brings a significant cost reduction.
16

Studie zavedení inovovaného výrobku do produkčního procesu / The Study of Implementation of Innovated Products in Production Process

Molík, Tomáš January 2008 (has links)
This student thesis deals with a problem of manufacturing and competition ability of the joint stock company ZVVZ in the range of its manufacturing program - radial fans. The thesis compares the present and the innovated type of small radial fans from the view of manufacturing technology and manufacturing costs. The study comes out the technological documentation and demand forecast of future market. Finally the thesis summaries conditions which are necessary for the successful entrance of the innovated type of radial fans into the manufacturing process.
17

Zefektivnění projektu pro vybranou organizaci / Streamlining of a Project for a Selected Organization

Švestka, Ivan January 2017 (has links)
The diploma thesis deals with a complex analysis of an organization’s project, based on which are proposed certain steps that should increase efficiency and enhance this project in the future years. The thesis uses theoretical foundations and methods of project management, eventually other related fields.
18

Využití Paretova pravidla při zefektivnění prodeje / The Use of Pareto Analysis in Streamlining Sales

Pinkava, Vojtěch January 2013 (has links)
This diploma thesis deals with the employment of the Pareto principle in increasing the efficiency of the product range in a selected grocery outlet of the Brněnka chain. A methodology for the evalution of the offered product range has been created based on general knowledge and practical usage of the Pareto principle in scientific work. The methodology is applied on sale records of a selected store. The work includes suggestions of product range alteration based on application of the formed methodology.
19

Studie zefektivnění přípravy výroby u vybrané technologie / The study of increase in efficiency of manufacturing preparation of technology

Šudoma, Michal January 2009 (has links)
This paper discusses different alternatives of more efficient preparation of spheroided graphite cast iron production. Secondary metallurgy and chemical heating technology are used to recast cast iron fused in copula furnace. The work applies the known physical-chemical rules used in the production of quality spheroided graphite cast iron in regular production conditions. Based on the previous developments, the aim was to prepare implementation of verified secondary metallurgy processes in adjusted casting ladle. The casting ladle was adjusted in order to allow execution of all processes required in order for the relevant standards and material lists requirements to be met in respect to spheroided graphite cast iron quality. Comments regarding the trends in ferroalloy metallurgy and related marketing approach of the company. The work is concluded by a summary of advantages brought in by the new approaches compared to the traditional ones from the economical as well as environmental perspective.
20

Úspory ve vytápění budov / The savings in heating buildings

Rokůsek, Petr January 2012 (has links)
This thesis theoretically in Part A deals with the solution in savings heating building and heating hot water. It examines the impact of austerity measures on the overall need for and consumption of heat energy and its economic impact and compared with each other in order to achieve maximum efficiency. Part B is their subsequent application to a given object - a residental building, various design alternatives and the resulting energy savings improvements. Experimental Part C deals with indirect measurement of the thermal conductivity of building materials.

Page generated in 0.0284 seconds