The municipalities' vision of using City Information Modeling (CIM) and Digital Twins (DT) inurban planning, requires prerequisites in place. A prerequisite is BIM, which together with GIS can create CIM.BIM implementation for a municipality involves major challenges and one such challenge is the lack of BIMmodels for existing buildings and infrastructure. However, this study is limited to planned development inconnection with land allocation. BIM implementation for the land allocation process within a medium-sizedSwedish municipality involves many involved actors and thus the need for a mobilization of the involved actorsfrom an ANT-inspired perspective. The purpose of this study is therefore to analyze how an actor network canbe mobilized to implement BIM in the land allocation process. A case study method has been chosen in thisthesis, considering that a well-defined case is identified, and the approach enables a variety of data collectionmethods that have been inspired by the autoethnographic approach because the researcher belongs to the focalactor in the process.
Identifer | oai:union.ndltd.org:UPSALLA1/oai:DiVA.org:hj-61571 |
Date | January 2023 |
Creators | Hamarashid, Ramyar |
Publisher | Jönköping University, Tekniska Högskolan |
Source Sets | DiVA Archive at Upsalla University |
Language | Swedish |
Detected Language | English |
Type | Student thesis, info:eu-repo/semantics/bachelorThesis, text |
Format | application/pdf |
Rights | info:eu-repo/semantics/openAccess |
Page generated in 0.0022 seconds