Submitted by Marcia Silva (marcia@latec.uff.br) on 2016-07-15T20:54:28Z
No. of bitstreams: 1
DISSERT EDUARDO GURGEL DO AMARAL ARDUINO.pdf: 2065093 bytes, checksum: cff22b2b72c45eeee85f4facfd01289c (MD5) / Made available in DSpace on 2016-07-15T20:54:28Z (GMT). No. of bitstreams: 1
DISSERT EDUARDO GURGEL DO AMARAL ARDUINO.pdf: 2065093 bytes, checksum: cff22b2b72c45eeee85f4facfd01289c (MD5)
Previous issue date: 2015-08-24 / O objeto do estudo foi elaborar uma modelo estrutural completo dos fatores que influenciam o sucesso da atuação do PMO e que benefícios essa atuação positiva traria para a gestão de projetos no Sistema Eletrobras e a partir disso, realizar um aperfeiçoamento do modelo estrutural por meio de métodos estatísticos. Para isso foi realizado uma pesquisa de campo (survey) no intuito de levantar dados junto aos profissionais envolvidos em Gestão de Projetos dentro do Sistema Eletrobras, a partir do modelo proposto e foram evidenciados os fatores de sucesso na atuação do PMO (Project Management Office) que possibilitam o escritório de gerenciamento de projetos tornar-se um vetor de gestão por excelência na empresa. Para alcançar o objetivo idealizado, realizou-se (a) Levantamento bibliográfico para conceituar gerenciamento de projetos e PMOs, (b) identificou-se os fatores que influenciam o sucesso de atuação do PMO, (c) identificou-se as abordagens teóricas dos fatores diretos que mais contribuem para que o PMO da Eletrobras possa atuar como um vetor de gestão por excelência, otimizando o aumento da eficiência da sua atuação e o sucesso na gestão de projetos. Averiguou-se quais abordagens teóricas, a partir do sucesso de atuação do PMO, traziam benefícios para a gestão de Projetos no Sistema Eletrobras. Assim, para realizar os trabalhos estatísticos para a avaliação de adequação do modelo, foi utilizado o software SPSS Statistics, para a execução da AFE (Análise Fatorial Exploratória), em busca de testar o modelo baseado na teoria previamente apresentada. Foram obtidas 116 respostas válidas preenchidas por colaboradores com envolvimento em gerenciamento de projetos no sistema Eletrobras. No início o modelo teórico era composto por vinte abordagens teóricas e três fatores independentes. Após as etapas do SEM, obteve-se dezessete abordagens e dois fatores independentes, diferentes do modelo proposto. Com isso, a hipóteses H1 e H2 não foram rejeitadas, pois apresentaram fator significante com (P < 0,05). A hipótese H3 teve que ser excluída, pois na AFE suas abordagens teóricas compuseram um único conjunto com a hipótese H2, visto que a Matriz da Variância Total Explicada demonstrou ser o modelo mais ajustado com somente dois fatores. Todas as análises foram validadas pelo alpha de cronbach. / The object of study was preparing a full structural model of the factors that influence the success of the PMO acting and that this positive performance would bring benefits for project management in the Eletrobras System and from this, carry out an improvement of the structural model through methods Statistical. For it was conducted a field survey (survey) in order to collect data with professionals involved in Project Management within the Eletrobras System, from the proposed model and were shown the success factors in the performance of the PMO (Project Management Office) which enable the project management office become a vector of management excellence by the company. To achieve the idealized goal, there was (a) Bibliographic survey to conceptualize project management and PMOs, (b) identified the factors that influence the PMO acting success, (c) identify the theoretical approaches of the factors direct that contribute most to the PMO Eletrobras can act as a vector management par excellence, optimizing the increased efficiency of its operations and success in project management. It was found that theoretical approaches, from the PMO acting success, bringing benefits to the Project management in the Eletrobras System. Thus, to perform statistical work for the evaluation of the adequacy of the model, SPSS Statistics software was used, for the implementation of EFA (Exploratory Factor Analysis), seeking to test the model based on the theory presented previously. 116 valid responses were obtained filled by employees with involvement in project management in the Eletrobras System. Earlier the theoretical model was composed of twenty theoretical approaches and three independent factors. After the stages of SEM, seventeen approaches was obtained and two independent factors, other than this model. With this, the H1 and H2 hypotheses were not rejected because they presented with significant factor (P <0.05). The hypothesis H3 had to be excluded, as their theoretical approaches the AFE comprised a single set with the hypothesis H2, whereas Matrix Total Variance Explained proved to be the most adjusted model with only two factors. All analyzes were validated by Cronbach's alpha.
Identifer | oai:union.ndltd.org:IBICT/oai:https://app.uff.br/riuff:1/1900 |
Date | 24 August 2015 |
Creators | Arduino, Eduardo Gurgel do Amaral |
Contributors | Pereira, Valdecy, Campagnac, Luiz Antonio da Paz, Farias Filho, Jose Rodrigues de |
Publisher | Universidade Federal Fluminense, Niterói |
Source Sets | IBICT Brazilian ETDs |
Language | Portuguese |
Detected Language | English |
Type | info:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/masterThesis |
Source | reponame:Repositório Institucional da UFF, instname:Universidade Federal Fluminense, instacron:UFF |
Rights | info:eu-repo/semantics/openAccess |
Page generated in 0.0023 seconds