Return to search

Análise da integração de sistemas hierárquicos para planejamento e programação de produção / Analysis of hierarchical system integration for production planning and scheduling

Orientador: Maria Teresa Moreira Rodrigues / Tese (doutorado) - Universidade Estadual de Campinas, Faculdade de Engenharia Química / Made available in DSpace on 2018-08-15T23:04:02Z (GMT). No. of bitstreams: 1
EstombeloMontesco_RichardAndres_D.pdf: 4286461 bytes, checksum: eb67a872094b54e948fda33c92db4f3a (MD5)
Previous issue date: 2010 / Resumo: A tendência nos últimos anos é de utilizar eficientemente a capacidade instalada de plantas de produção descontínua (flexível, multipropósito) de forma a analisar a viabilidade das demandas sem padrão dos diferentes produtos. O objetivo principal de produção é atender aos pedidos em um tempo relativamente curto, direcionado ao cliente e permitindo flexibilizar a planta. O objetivo deste trabalho é de propor uma análise de integração das etapas de planejamento e programação. Esta integração deve permitir medir corretamente as possibilidades reais de execução de planejamentos alternativos, e assim, propor um novo modelo a partir das variáveis comuns destes sistemas. Inicialmente analisou-se o método de propagação de restrições como um elo comum das duas etapas o qual, além de garantir que durante o processo de propagação de restrições não sejam eliminadas soluções factíveis, também permite recalcular as novas soluções integradas. Com esta integração consegue-se que as variáveis externas em determinadas etapas do processo de solução evitem re-processos computacionais, os quais em sistemas de grande porte podem significar gastos de tempo importante. As características do novo modelo são: utilização de janelas de processamento, planta descontínua, produção em batelada com restrições sobre os recursos compartilhados (equipamentos) e sobre armazenagem, com modo de operação na planta por atendimento de pedidos (direcionada ao cliente) / Abstract: The efficient use of installed capacity in discontinued production plants (flexible, multi-purpose) in such a way as to analyze the feasibility of standard-less demands of different products is a trend in recent years. The main objective of the production problem is to fulfill orders in a relatively short time, in a way that it is client-focused and enables keeping the plant flexible. The objective of this work was to introduce an analysis of the integration of the production planning and scheduling stages. This integration allows the correct measurement of the actual performance possibilities of alternative plans, introducing a new model based on the common variables of these systems. Initially, we analyzed the method of constraint propagation as a common bond of two stages, and besides, we guarantee the search space also allowed to recalculate the new integrated problems. With this integration, it was determined that the external variables at certain points in the solution process avoid re-computational processes in which large systems can mean spending important time. The characteristics of this new model are: usage of processing-windows; the use of discontinued plants; batch production with constraints on shared (equipment) and storage resources; and on-demand operation mode (client-focused) / Doutorado / Sistemas de Processos Quimicos e Informatica / Doutor em Engenharia Química

Identiferoai:union.ndltd.org:IBICT/oai:repositorio.unicamp.br:REPOSIP/267002
Date15 August 2018
CreatorsEstombelo Montesco, Richard Andres
ContributorsUNIVERSIDADE ESTADUAL DE CAMPINAS, Rodrigues, Maria Teresa Moreira, 1955-, Rodrigues, Luiz Carlos Abreu, Costa, Caliane Bastos Borba, Drummond, Daniela Medeiros Devienne, Silva, Flávio Vasconcelos da
Publisher[s.n.], Universidade Estadual de Campinas. Faculdade de Engenharia Química, Programa de Pós-Graduação em Engenharia Química
Source SetsIBICT Brazilian ETDs
LanguagePortuguese
Detected LanguagePortuguese
Typeinfo:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/doctoralThesis
Format107 p. : il., application/pdf
Sourcereponame:Repositório Institucional da Unicamp, instname:Universidade Estadual de Campinas, instacron:UNICAMP
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.0115 seconds